Inspection / Activity Plan 03/01/2007 - 09/30/2008
ML070600359
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/01/2007
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML070600350 List:
References
IR-07-001
Download: ML070600359 (2)


Text

Hatch Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 10:45:01 Report 22 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP-WEEK 2 Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/26/2007 03/02/2007 1, 2 71151 IP Performance Indicator Verification 3

EB1-MODS

- MODIFICATIONS-10CFR50.59 Baseline Inspections 05/07/2007 05/11/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 05/07/2007 05/11/2007 1, 2 7111117B IP Permanent Plant Modifications 1

EB3 - ME

- MAINTENANCE EFFECTIVENESS Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111112B IP Maintenance Effectiveness 1

PB2-ISFS

- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 06/01/2007 07/31/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4

PB2-PI&R

- BIENNIAL PI&R PROGRAM INSPECTION Baseline Inspections 07/30/2007 08/03/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 08/13/2007 08/17/2007 1, 2 71152B IP Identification and Resolution of Problems 3

PSB1-EP

- EP EXERCISE Baseline Inspections 08/20/2007 08/24/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/20/2007 08/24/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151-EP03 IP Alert & Notification System 3

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 11/05/2007 11/09/2007 1

V23274 HATCH/NOVEMBER 2007 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM Not Applicable 11/26/2007 12/07/2007 1

V23274 HATCH/NOVEMBER 2007 EXAM AT POWER FACILITIES 1

EB3-HS

- HEAT SINK INSPECTION Baseline Inspections 12/10/2007 12/14/2007 1, 2 7111107B IP Heat Sink Performance 1

EB3-ISI

- UNIT 1 - INSERVICE INSPECTION Baseline Inspections 02/18/2008 02/22/2008 1

7111108G IP Inservice Inspection Activities - BWR 6

EB1-CDBI

- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 06/09/2008 06/13/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/23/2008 06/27/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/07/2008 07/11/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/21/2008 07/25/2008 1, 2 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Package: ML070600350 Document: ML070600359

Hatch Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 10:45:01 Report 22 1

PSB1-EP

- EP INSP Baseline Inspections 08/18/2008 08/22/2008 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 08/18/2008 08/22/2008 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/18/2008 08/22/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/18/2008 08/22/2008 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/18/2008 08/22/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/18/2008 08/22/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/18/2008 08/22/2008 1, 2 71151-EP03 IP Alert & Notification System 1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 09/22/2008 09/24/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 09/29/2008 10/03/2008 1, 2 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.