Inspection/Activity Plan 03/01/2007 - 09/30/2008
ML070600252
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/01/2007
From:
NRC/RGN-II
To:
Shared Package
ML070600231 List:
References
Download: ML070600252 (3)


Text

Page 1 of 3 Oconee 03/01/2007 10:01:49 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL RQ - REQUALIFICATION INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/26/2007 03/30/2007 Baseline Inspections PSB1-RP - RP PRE-INSP VISIT/ISFSI 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 04/10/2007 04/12/2007 Baseline Inspections EB3-ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections 95002 - 95002 SUP INSPECT (MSPI, SSF, U3RBES) 4 1, 2, 3 IP 95002 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 04/30/2007 05/04/2007 Supplemental Program PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 04/30/2007 05/04/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/06/2007 05/11/2007 Safety Issues EB3SGISI - UNIT 2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 05/07/2007 05/11/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK2 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 05/14/2007 05/18/2007 Baseline Inspections PB1-PI&R - BIENNIAL PI&R INSPECTION 5 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/09/2007 07/13/2007 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/23/2007 07/27/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI RESIDENT INSPECTION 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine OL PREP - INITIAL EXAM PREPARATION 4 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 08/06/2007 08/10/2007 Not Applicable PSB1-EP - EP INSP 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71151-EP01 Drill/Exercise Performance 08/06/2007 08/10/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. Package: ML070600231 Document: ML070600252 This report shows only on-site and announced inspection procedures.

Page 2 of 3 Oconee 03/01/2007 10:01:49 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-EP - EP INSP 1 1, 2, 3 IP 71151-EP02 ERO Drill Participation 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71151-EP03 Alert & Notification System 08/06/2007 08/10/2007 Baseline Inspections OL EXAM - INITIAL EXAM WEEK 1 4 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 08/27/2007 08/31/2007 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 3 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 09/10/2007 09/14/2007 Not Applicable EB3-ISI - UNIT 3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/29/2007 11/02/2007 Baseline Inspections EB3SGISI - UNIT 3 STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 11/05/2007 11/09/2007 Baseline Inspections EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 8 1, 2, 3 IP 7111121 Component Design Bases Inspection 01/14/2008 01/18/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 01/28/2008 02/01/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 02/11/2008 02/15/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 02/25/2008 02/29/2008 Baseline Inspections PSB1-EP - EP EXERCISE 3 1, 2, 3 IP 7111401 Exercise Evaluation 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP01 Drill/Exercise Performance 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP02 ERO Drill Participation 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP03 Alert & Notification System 03/10/2008 03/14/2008 Baseline Inspections EB3-ISI - U-1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/07/2008 04/11/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 06/16/2008 06/18/2008 Baseline Inspections EB3 - MR - MAINT RULE 1 1, 2, 3 IP 7111112B Maintenance Effectiveness 06/23/2008 06/27/2008 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION 5 1, 2, 3 IP 7111105T Fire Protection [Triennial] 07/01/2008 07/03/2008 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection [Triennial] 07/21/2008 07/25/2008 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection [Triennial] 08/04/2008 08/08/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/14/2008 07/18/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Oconee 03/01/2007 10:01:49 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 07/14/2008 07/18/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 4 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/11/2008 08/15/2008 Baseline Inspections 1, 2, 3 IP 7111117B Permanent Plant Modifications 08/11/2008 08/15/2008 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 08/18/2008 08/22/2008 Not Applicable OL EXAM - INITIAL EXAM WEEK 1 3 1 V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 09/08/2008 09/12/2008 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 3 1 V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 09/22/2008 09/26/2008 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.