ML070580237
ML070580237 | |
Person / Time | |
---|---|
Site: | Harris, Brunswick, Crystal River, Robinson |
Issue date: | 02/23/2007 |
From: | Fulford J Carolina Power & Light Co, Florida Power & Light Co, Progress Energy Carolinas, Progress Energy Florida |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
PE&RAS-07-004 | |
Download: ML070580237 (11) | |
Text
Progress Energy PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-07-004 February 23, 2007 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:
Pursuant to 10 CFR 26.71(d), enclosed is the semiannual Fitness For Duty (FFD) Program performance data for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF).
The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period July 1, 2006 through December 31, 2006.
This document contains no new regulatory commitment.
Please contact me at (919) 546-6901 if you need additional information concerning this report.
Sincerely, J aul Fulford anager - Performance v-valuation & Regulatory Affairs HAS Enclosure c: W. D. Travers, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 S. N. Bailey, NRR Project Manager - BSEP, Unit Nos. 1 and 2; CR3 C. P. Patel, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 J. Y. Kerr - North Carolina Utilities Commission R. Vance - North Carolina Utilities Commission S. Watson - North Carolina Utilities Commission B. Hall - North Carolina Department of Environmental and Natural Resources
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 1 of 10 Fitness For Duty Program (July 1, 2006 - December 31, 2006)
PERFORMANCE DATA
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 2 of 10
SUMMARY
DATA AND ANALYSIS Carolina Power & Light Company Florida Power Corporation Description (Progress Energy Carolinas, Inc.) (Progress Energy Florida, Inc.)
Data Analysis Brunswick Harris Robinson Crystal River Number of Random 292 288 186 248 Tests Conducted Average Population 1186 902 714 824
- 0 Eligible for Testing
- a. Random Testing Rate 25% 32% 26% 30%
.0 Number of Random 766 248 S ~ Tests Conducted X z Average Population 2802 824 I ;Z
.~Eligible for Testing
- Random Testing Rate 27% 30%
Number of Random 1653 481
- =
- Tests Conducted r, Average Population 2963 803
. . Eligible for Testing
,C'2 H Random Testing Rate 56% 60%
- Data for corporate and other support staff are included with site data, as appropriate.
Analysis of the data indicates no program weakness requiring management action.
SUMMARY
OF MANAGEMENT ACTIONS Unescorted access for the individuals with confirmed positive tests was denied or revoked as applicable.
EVENTS REPORTED BY TELEPHONE UNDER 10 CFR 26.73 During this reporting period, no licensed operator or supervisor tested positive, and no significant FFD event report was made.
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 3 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC) December 31, 2006 Company 6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml) F-I Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /
Cocaine 300/150 Phencyclidine 25/25 /
Opiates 300/300 Alcohol (% BAC) 0.04% /
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 823 N/A 363 Unescorted Access CATEGORIES # Tested # Positive f Tested f Positive # Tested # Positive Pre-Access 33 0 N/A N/A 127 0 For Cause:
Post accident 3 0 N/A N/A 0 0 Observed behavior 1 0 N/A N/A 1 0 Random 210 2 N/A N/A 82 0 Follow-Up 10 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Refusal to Participate 0 0 N/A N/A 0 0 Total 257 2 N/A N/A 210 0
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 4 of 10 Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuana (NRC/PEC Amphet- Phency- Refusal CUTOFF) Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5 Licensee Employees 0/0 2 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0/0 0 0 0 0 0 0 0 A Total 0/0 2 0 0 0 0 0 0 2/0_
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 5 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC) December 31, 2006 Company 6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml) F Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /
Cocaine 300/150 Phencyclidine 25/25 /
Opiates 300/300 Alcohol (% BAC) 0.04% /
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 634 N/A 268 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 33 0 N/A N/A 84 1 For Cause:
Post accident 1 0 N/A N/A 5 0 Observed behavior 0 0 N/A N/A 2 0 Random 208 0 N/A N/A 80 1 Follow-Up 2 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Refusal to Participate 0 0 N/A N/A 0 0 Total 244 0 N/A N/A 171 2
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 6 of 10 Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuana Amphet- Phency- Refusal (NRC/PEC CUTOFF) Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5 Licensee Employees 0/0 0 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0/2 0 0 0 0 0 0 0 A Total 0/2 0 0 0 0 0 0 0 I 0I
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 7 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC) December 31, 2006 Company 6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml) D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /
Cocaine 300/150 Phencyclidine 25/25 /
Opiates 300/300 Alcohol (% BAC) 0.04% /
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 505 N/A 209 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 16 0 N/A N/A 98 0 For Cause:
Post accident 0 0 N/A N/A 3 0 Observed behavior 1 0 N/A N/A 1 0 Random 126 0 N/A N/A 60 0 Follow-Up 0 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Refusal to Participate 0 0 N/A N/A 0 0 Total 143 0 N/A NIA 162 0
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 8 of 10 Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuana (NRCIPEC Amphet- Phency- Refusal CUTOFF) Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5 Licensee Employees 0/0 0 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0/0 0 0 0 0 0 0 0 A Total 0/0 0 0 f 0 0 0 [ 0 0 1 11 1V]Ifl
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 9 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Florida Power Corporation, now doing business as Progress Energy Florida, Inc., (PEF) December 31, 2006 Company 6 Months Ending Crystal River Nuclear Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml) F Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /
Cocaine 300/150 Phencyclidine 25/25 /
Opiates 300/300 Alcohol (% BAC) 0.04% /
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 576 N/A 248 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 54 1 N/A N/A 97 0 For Cause:
Post accident 2 0 N/A N/A 1 0 Observed behavior 1 0 N/A N/A 0 0 Random 175 0 N/A N/A 73 0 Follow-Up 1 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Refusal to Participate 0 0 N/A N/A 0 0 Total 233 1 N/A N/A 171 0
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-07-004 Page 10 of 10 Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuana (NRC/PEF Amphet- Phency- Refusal CUTOFF) Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5 Licensee Employees 1/0 0 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0/0 0 0 0 0 0 0 0 A Total 1/0 0 0 0 0 0 0 0