Letter Sequence Other |
---|
TAC:MD3578, Use of TS 3.10.1 for SCRAM Time Testing Activities (Approved, Closed) |
|
MONTHYEARGNRO-2006/00056, License Amendment Request, Application for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities Using the Consolidated Line Item Improvement Process2006-11-13013 November 2006 License Amendment Request, Application for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities Using the Consolidated Line Item Improvement Process Project stage: Request ML0705206202007-02-21021 February 2007 License/Technical Specification Pgs - Amendment 172 Re Technical Specification to Adopt Task Force Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities, Using CLIIP Process Project stage: Other ML0702504452007-02-21021 February 2007 Issuance of Amendment No. 172 Technical Specification to Adopt Task Force Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities, Using CLIIP Process Project stage: Approval 2006-11-13
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22073A1752022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21039A3292021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21039A2642021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing GNRO-2015/00091, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Containment Leak Rate Testing/2015-12-10010 December 2015 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Containment Leak Rate Testing/ GNRO-2015/00077, Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF) TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours.2015-11-24024 November 2015 Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF) TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours. GNRO-2015/00037, Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing2015-09-15015 September 2015 Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology GNRO-2015/00059, Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/20132015-08-14014 August 2015 Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/2013 GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals2015-05-27027 May 2015 Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month2014-12-15015 December 2014 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date GNRO-2014/00068, License Amendment Request to Revise Technical Specification 2.1.1.22014-11-21021 November 2014 License Amendment Request to Revise Technical Specification 2.1.1.2 ML14162A3782014-09-25025 September 2014 Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML14106A1332014-06-30030 June 2014 Issuance of Amendment No. 198, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, as Part of Consolidated Line Item Improvement Process ML13343A1092013-12-26026 December 2013 Issuance of Amendment No. 197, Revise Technical Specifications and Surveillance Requirements to Support Operation with 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications GNRO-2012/00132, License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.2012-11-0909 November 2012 License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low. GNRO-2012/00124, Response to NRC Request for Additional Information - GGNS Criticality Safety Analysis License Amendment Request2012-10-22022 October 2012 Response to NRC Request for Additional Information - GGNS Criticality Safety Analysis License Amendment Request ML1207202832012-04-20020 April 2012 Issuance of Amendment No. 189, Revise Minimum Critical Power Ratio Safety Limit in Technical Specification 2.1.1.2 for Two-Loop and Single Recirculation Loop GNRO-2012/00014, Supplemental Information Pertaining to License Amendment Request for Standby Liquid Control System2012-03-21021 March 2012 Supplemental Information Pertaining to License Amendment Request for Standby Liquid Control System GNRO-2012/00001, License Amendment Request - Standby Liquid Control System2012-01-23023 January 2012 License Amendment Request - Standby Liquid Control System GNRO-2011/00064, License Amendment Request to Revise Technical Specification 2.1.1.22011-10-28028 October 2011 License Amendment Request to Revise Technical Specification 2.1.1.2 GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1026604032010-09-0808 September 2010 License Amendment Request Extended Power Uprate ML0931404632009-11-0303 November 2009 License Amendment Request Regarding Power Range Neutron Monitoring System Upgrade GNRO-2009/00042, Supplement to ENOC-09-00009, License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions, Letter Dated April 27, 20092009-07-10010 July 2009 Supplement to ENOC-09-00009, License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions, Letter Dated April 27, 2009 ML0909804292009-04-13013 April 2009 Correction to Amendment No. 182, Surveillance Requirements for Diesel Generator Slow - Start Testing (MD9641) ML0817600232008-10-14014 October 2008 Issuance of Amendment No. 178, Adoption of Technical Specifications Task Force (TSTF) Traveler No. 448, Revision 3, Control Room Envelope Habitability. GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-4482008-09-0202 September 2008 Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 ML0724900082007-10-24024 October 2007 Technical Specifications, Issuance of Amendment No. 177 Changes to Technical Specifications Surveillance Requirement 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency ML0734401152007-09-30030 September 2007 NEDC-33383, Revision 0, GEXL97 Correlation Applicable to ATRIUM-10 Fuel, (Non-Proprietary), Attachment 2 ML0721905072007-08-24024 August 2007 Tech Spec Pages for Amendment 176 Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices ML0712900082007-05-30030 May 2007 Technical Specifications, Issuance of Amendment 175 Re Technical Specifications Change Regarding Mode Change Limitations (TSTF-359) Using Consolidated Line Item Improvement Process, & Correct Example 1.4-1 (TSTF-485) ML0705306542007-03-16016 March 2007 Tech Spec Pages for Amendment No. 174 a Technical Specification Change to Allow Use of Control Rod Assemblies with Different Control Material GNRO-2007/00011, License Amendment Request, Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices2007-03-0101 March 2007 License Amendment Request, Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices 2023-12-14
[Table view] |
Text
(b) SERI is required to notify the NRC in writing prior to any change in (i) the terms or conditions of any new or existing sale or lease agreements executed as part of the above, authorized financial transactions, (ii) the GGNS Unit 1 operating agreement, (iii) the existing property insurance coverage for GGNS Unit 1 that wouldmaterially alter the representations and conditions set-forth in the Staff's Safety Evaluation Report dated December 19, 1988 attached to Amendment No. 54.
In addition, SERI is required to notify the- NRC of any action by a lessor or other successor in interest to SERI that may have an effect on the operation of the facility.
C. The license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level Entergy Operations, Inc. is authorized to operate the facility at reactor core power levels not in excess of 3898 megawatts thermal (100 percent power) in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained'in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 172 are hereby incorporated into this license. Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
The Surveillance Requirements (SRs) for Diesel Generator 12 contained in the Technical Specifications and listed below, are not required to be performed immediately upon implementation of Amendment No. 169.
The SRs listed below shall be successfully demonstrated at the next regularly scheduled performance.
SR 3.8.1.9, SR 3.8.1.10, and SR 3.8.1.14 4 Amendment Nb. 172
Inservice Leak and Hydrostatic Testing Operation 3.10.1 3.10 SPECIAL OPERATIONS 3.10.1 Inservice Leak and Hydrostatic Testing Operation LCO 3.10.1 The average reactor coolant temperature specified in Table 1.1-1 for MODE 4 may be changed to "NA," and operation considered not to be in MODE 3; and the requirements of LCO 3.4.10, "Residual. Heat Removal (RHR) Shutdown Cooling System-Cold Shutdown," may be suspended, to allow reactor coolant temperature > 200°F:
- For performance of an inservice leak or hydrostatic test,
- As a consequence of maintaining adequate pressure for an inservice leak or hydrostatic test, or
" As a consequence of maintaining adequate pressure for control rod scram time testing initiated in conjunction with an inservice leak or hydrostatic test, provided the following MODE 3 LCOs are met:
- a. LCO 3.3.6.2, "Secondary Containment Isolation Instrumentation," Functions 1, 2, 3, 4, and 5 of Table 3.3.6.2-1;
- b. LCO 3.6.4.1, "Secondary Containment";
- c. LCO 3.6.4.2, "Secondary Containment Isolation Valves (SCIVs)"; and
- d. LCO 3.6.4.3, "Standby Gas Treatment (SGT) System."
APPLICABILITY: MODE 4 with average reactor coolant temperature > 200 0 F.
GRAND GULF 3.10-1 Amendment No. 4-2-4, 172