Summary of February 6, 2007 Category 2 Meeting with the Technical Specifications Task Force & Firstenergy Nuclear Operating Co. to Discuss Development of the Accelerated Review Process for Technical Specification Conversions & Related Licen
ML070520133
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/05/2007
From: Ross Telson
NRC/NRR/ADRO/DIRS/ITSB
To: Kobetz T
NRC/NRR/ADRO/DIRS/ITSB
Telson, R - NRR/DIRS - 415-2256
References
Download: ML070520133 (7)


Text

March 5, 2007 MEMORANDUM TO: Timothy J. Kobetz, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Ross Telson, Reactor Systems Engineer /RA/

Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF FEBRUARY 6, 2007, CATEGORY 2 MEETING WITH THE TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) AND FIRSTENERGY NUCLEAR OPERATING CO. (FENOC) TO DISCUSS DEVELOPMENT OF THE ACCELERATED REVIEW PROCESS FOR TECHNICAL SPECIFICATION CONVERSIONS AND RELATED LICENSING ACTIONS.

On February 6, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of the Technical Specifications Task Force (TSTF) at Excel Services Corporation, 11921 Rockville Pike, Suite 100, Rockville, MD 20852. The purpose of the meeting was to discuss the development of the accelerated review process for technical specification (TS) conversions and related licensing actions. The accelerated review process is expected to guide the administration of the upcoming Davis-Besse conversion to improved TSs and related future industry licensing actions.

The meeting generally followed the agenda proposed in a January 24, 2007, Public Meeting Notice (ADAMS Accession No. ML070230284) as amended by the meeting participants. A number of documents were shared and discussed during the meeting. They are listed in enclosure 1 and available to the public in ADAMS Package Accession No. ML070520128. contains the minutes of the meeting, enclosure 2 list all meeting attendees, and enclosure 3 provides address information for non-NRC attendees.

Enclosures:

As stated CONTACT: Ros Telson, NRR/DIRS (301) 415-2256 RDT@nrc.gov

ML070230284) as amended by the meeting participants. A number of documents were shared and discussed during the meeting. They are listed in enclosure 1 and available to the public in ADAMS Package Accession No. ML070520128. contains the minutes of the meeting, enclosure 2 list all meeting attendees, and enclosure 3 provides address information for non-NRC attendees.

Enclosures:

As stated CONTACT: Ros Telson, NRR/DIRS (301) 415-2256 RDT@nrc.gov DISTRIBUTION: ITSB r/f RidsNrrDirs RidsNrrDirsItsb Enclosure 3 Address List ADAMS ACCESSION NUMBERS: ML070520133 - memorandum; ML070520128 - package OFFICE ITSB:DIRS BC:ITSB:DIRS NAME RTelson TKobetz DATE 3/5/2007 3/5/2007 Meeting Minutes A meeting was held between the NRC and representatives of the Technical Specifications Task Force (TSTF) and the FENOC/Davis-Besse TS conversion coordinator was held on February 6, 2007, to discuss the development of the accelerated review process for technical specification (TS) conversions and related licensing actions, which is expected to guide the administration of the upcoming Davis-Besse conversion to improved TSs and related future industry licensing actions. The meeting followed the agenda proposed in a January 24, 2007, Public Meeting Notice (ADAMS Accession No. ML070230284) as amended by the meeting participants. The following is a brief summary of the meeting.

Morning Session: 09:00 - 11:30 AM I. ADMINISTRATIVE MATTERS A. Introductions B. Agenda Review & Amendment C. Other Administrative Issues II. REVIEW PAST IMPROVED TECHNICAL SPECIFICATION (TS) PILOT PROCESS - See referenced handouts in ADAMS Package Accession No. ML070520128 (listed individually below).

A. NRC presented an overview of lessons learned in connection with the accelerated review process pilot, titled Accelerated STS Conversion (ADAMS Accession No. ML070510156).

B. EXCEL Services Corporation Presentation

1. Perceived benefit of pilot process to industry
2. Issues encountered from industry perspective
3. Approaches to address the issues The TSTF provided the following documents:
a. Accelerated Review Process - ITS Lessons Learned (ADAMS ML070520143)
b. Improved Technical Specifications (ITS) Submittal - Accelerated Licensing Review Process (ADAMS ML070520151)
c. Accelerated ITS Licensing Process (Pilot) Schedule (ADAMS ML070520171)
d. ITS Conversion Process PowerPoint Presentation (ADAMS ML070520162)

Enclosure 1

III. WORKING SESSION A. Summarize Lessons Learned

1. Highlight Identified Successes - Participants discussed and generally agreed that the following accelerated review pilot successes were perceived:
a. ITS Conversion process was streamlined (1) Time and effort were generally reduced for NRC and licensee staffs (2) Formal communications were consolidated and generally reduced (3) Use of electronic submittals in place of paper enhanced efficiency (4) Use of Doc Tables enhanced acceptance review and project Mgt.

(5) Real-time exchange of information (e.g. Face-to-Face and Online Q&A) promoted effective communications and reduced or eliminated administrative delays of traditional RAI process (6) Disciplined scope-control is crucial to accelerated ITS conversion process

b. Accelerated ITS conversion encouraged additional licensees to convert to ITS (1) A number of licensees, which would not consider conversion before the pilot, are now contemplating converting to ITS (2) A number of ITS conversion requests are currently anticipated following the Davis-Besse conversion
c. Modified Traditional (Formal) RAI process effectively consolidated and documented real-time information exchange and was used, as needed, to address problem areas
d. Process predictability improved
2. Highlight Identified Areas for Improvement
a. Failure to control ITS conversion scope can be highly detrimental
b. Enhanced controls are needed for Online Q&A process (1) Enhanced training and/or qualification of participants (2) Improved process guidance, oversight, and accountability (3) Possible implementation of online Q&A workflow controls (4) Maintenance of accountability controls for quality and timeliness (5) Timely identification, tracking, and resolution of issues as they develop (6) Clear definition and agreement regarding key terms such as Beyond Scope Item (BSI) and their impact on ITS conversion scope (7) Early identification of ITS conversion scope growth items and their potential impact on anticipated ITS conversion effort and duration (8) Responsive but not overly-burdensome checks-and-balances needed for ITS conversion and particularly the online Q&A process (9) Consistent, predictable, expectations and application of requirements for justifying ITS changes - particularly more-restrictive changes Enclosure 1

B. Address differing perspectives on benefit vs challenges to requirements

1. No major differences were identified though there was discussion regarding the establishment of an appropriately responsive system of checks-and-balances without resorting to more burdensome traditional RAI processes C. Evaluate challenges that must be addressed in finalizing pilot (or new) process
1. Explore interim solutions to challenges - This area was not covered in significant depth beyond that discussed under A. There was, however, discussion of proceeding with the Davis-Besse ITS conversion under a DRAFT procedure if it could not be finalized prior to the scheduled ITS conversion submittal.
2. Identify long-term solutions to challenges - In addition to the anticipated development of formalized guidance, training, and qualification processes for ITS conversion participants, the eventual establishment of an NRC-controlled online Q&A process was discussed.

D. Evaluate alternative approaches to achieving benefits and satisfying requirements -

No fundamentally different approaches were proposed. Current alternatives appear to be traditional licensing / RAI processes, the piloted accelerated ITS conversion / RAI process, and a hybrid that provides a blend of the benefits from both processes.

E. The TSTF requested the NRC approve or issue licensee-submitted TS bases when approving TS conversions. The NRC staff noted that, while TS are NRC-controlled licensing documents, TS bases are not. Changes to TS bases are controlled in accordance with 10 CFR 50.59 and the TS bases control program, as specified in the Administrative Control TS.

The NRC staff also noted that 10 CFR 50.36(a) identifies TS bases as a required element of the current licensing basis without which a proposed TS licensing request would be incomplete. TS bases must be submitted with TS conversions and other TS amendment requests to support the requests.

II. PUBLIC PARTICIPATION INVITED - No comments received.

III. ADJOURN Enclosure 1

February 6, 2007 NRC-TSTF-FENOC Meeting Attendance NAME ORGANIZATION E-MAIL Bentley, William FENOC (Davis-Besse) wjbentley@firstenergycorp.com Hearn, Pete NRC/NRR/DIRS/ITSB PCH@nrc.gov Hoffman, Donald EXCEL donaldh@excelservices.com Kobetz, Timothy NRC/NRR/DIRS/ITSB TJK1@nrc.gov Marshall, Michael NRC/DORL/LPL3-2 MXM2@nrc.gov Raleigh, Deann Licensing Information Service draleigh@scientech.com Ray Schiele EXCEL Rays46@earthlink.net Schulten, Carl NRC/NRR/DIRS/ITSB CSS1@nrc.gov Telson, Ross NRC/NRR/DIRS/ITSB RDT@nrc.gov Wengert, Thomas NRC/NRR/DORL/Davis-Besse TJW2@nrc.gov Enclosure 2

Non-NRC Attendee Address List Technical Specifications Task Force Ray Schiele tstf@excelservices.com Rays46@earthlink.net 11921 Rockville Pike EXCEL Services Corporation Suite 100 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Rockville, MD 20852 Michael Crowthers (BWROG) William J. Bentley mhcrowthers@pplweb.com wjbentley@firstenergycorp.com PPL Susquehanna Davis-Besse Nuclear Power Station Mail Code GENPL4 Mail Stop A-DB-3065 Two North Ninth Street 501 North State Route 2 Allentown, PA 18101-1179 Oak Harbor, OH 43449-9760 Wes Sparkman (WOG) Deann Raleigh wasparkm@southernco.com draleigh@scientech.com Southern Nuclear Operating Company Licensing Information Service P. O. Box 1295 / Bin B048 Birmingham, AL 35201 Paul Infanger (BWOG)

Paul.Infanger@pgnmail.com Crystal River Nuclear Plant Mail Code NA1B 15760 W. Power Line Street Crystal River, FL 34428 Brian Woods (WOG/CE) woodsbl@songs.sce.com mailstop: AWS-D3d San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674 Donald R. Hoffman (TSTF) donaldh@excelservices.com EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Brian Mann (TSTF) brianm@excelservices.com EXCEL Services Corporation 12624 Amershire Court Glen Allen, VA 23059 Enclosure 3