Summary of Telephone Conference Call Held on February 15, 2007, Between the Us NRC and Carolina Power & Light Company, Concerning Draft Requests for Additional Information Pertaining to the Shearon Harris, Unit 1, License Renewal Applicatio
ML070510655
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/23/2007
From: Maurice Heath
NRC/NRR/ADRO/DLR/RLRA
To:
Carolina Power & Light Co
Heath, M, NRR/DLR/RLRA, 415-3137
References
Download: ML070510655 (7)


Text

February 23, 2007 LICENSEE: Carolina Power & Light Company FACILITY: Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 15, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND CAROLINA POWER & LIGHT COMPANY, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Carolina Power & Light Company held a telephone conference call on February 15, 2007, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Shearon Harris Nuclear Power Plant, Unit 1, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Maurice Heath, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosures:

1. List of Participants
2. List of D-RAIs cc w/encls: See next page

ML070510655 DOCUMENT NAME: C:\\FileNet\\ML070510655.wpd OFFICE LA:DLR PM:RLRA:DLR BC:RLRA:DLR NAME IKing MHeath LLund DATE 2/22/07 2/23/07 02/23/07 LIST OF PARTICIPANTS FOR THE TELEPHONE CONFERENCE CALL SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 LICENSE RENEWAL APPLICATION February 15, 2007 PARTICIPANTS AFFILIATIONS Maurice Heath U.S. Nuclear Regulatory Commission (NRC)

Naeem Iqbal NRC Roger Stewart Progress Energy Mike Fletcher Progress Energy Bob Reynolds Progress Energy Barry Schneidman Progress Energy DRAFT REQUESTS FOR ADDITIONAL INFORMATION SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 LICENSE RENEWAL APPLICATION February 15, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Carolina Power & Light Company held a telephone conference call on February 15, 2007, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Shearon Harris Nuclear Power Plant, Unit 1, license renewal application (LRA).

D-RAI 2.3.3.31-1 LRA Section 2.3.3.31 describes fire protection system components. It is not clear from review of the LRA Tables 2.3.3-27 and 3.3.2-27 that fire hydrants, standpipes, manual hose stations, floor drains, dikes, filter housings, thermal insulation/fire proofing, fire wrap, orifices, valve bodies, and reactor coolant pump oil collection system components are included within the scope of license renewal and subject to an aging management review (AMR).

Discussion: Based on the discussion with the applicant, the staff agreed to revise this question to remove the word thermal insulation, as it makes an incorrect reference. The revised question will be sent as a formal RAI.

D-RAI 2.3.3.31-2 LRA Section B.2.14 includes an aging management program (AMP) for fire barrier assemblies.

It is not clear from review of the LRA Tables 2.3.3-27 and 3.3.2-27 that fire barrier walls, ceilings, floor, slabs, penetration seals, seismic joint filler, and fire doors are included within the scope of license renewal and subject to an AMR.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI B.2.15-1 LRA Section B.2.15 describes the fire water system AMP. NUREG-1801, Generic Aging Lessons Learned (GALL) Report,Section XI.M26, Fire Water System, requires fire hydrant hose hydrostatic tests, gasket inspections and fire hydrant flow tests to be performed annually to ensure that fire hydrants can perform their intended functions and provide opportunities for degradation to be detected before a loss of intended function can occur. The staff requests that the applicant describe fire hydrant inspection and testing in LRA Section B.2.15.

Discussion: The applicant stated that the supporting inspection and testing documentation requested is located onsite. The NRC Audit team will be conducting an onsite audit to examine the AMPs and supporting documentation. Therefore, this question is withdrawn and will not be sent as a formal RAI.

DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 15, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND CAROLINA POWER & LIGHT COMPANY, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, LICENSE RENEWAL APPLICATION HARD COPY DLR R/F E-MAIL:

PUBLIC RWeisman GGalletti DShum SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDeEqvb RidsNrrDss RidsOgcMailCenter RidsNrrAdes MHeath SHernandez CPatel CColleli RKWild JStorch RidsOpaMail RidsOcaMailCenter

Shearon Harris Nuclear Power Plant, Unit 1 cc:

David T. Conley Associate General Counsel II -

Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, NC 27602-1551 Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, NC 27562-9998 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, NC 27602 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, SC 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Mr. J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs PEB 5 Carolina Power & Light Company Post Office Box 1551 Raleigh, NC 27602-1551 Mr. Eric McCartney Plant General Manager Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Mr. Chris L. Burton Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Mr. Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, NC 27312 Mr. Thomas J. Natale, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

Shearon Harris Nuclear Power Plant, Unit 1 cc:

Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037-1128