Decontrolled Version - Admin. Change to F.O.L. in Conjunction W/Commission Order EA-06-037 & Revisions to Physical Security Plan, Training & Qualification Plan, & Safeguards Contingency Plan
ML070460494
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/13/2007
From: Donohew J
NRC/NRR/ADRO/DORL/LPLIV
To: Naslund C
Union Electric Co
Donohew J N, NRR/DORL/LP4, 415-1307
References
EA-06-037, TAC MD2205
Download: ML070460494 (4)


Text

0UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 13, 2007 Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER-EA-06-037 AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MD2205)

Dear Mr. Naslund:

By letter to the Nuclear Regulatory Commission (NRC) dated May 11, 2006, Union Electric Company (UEC) submitted its revised security plans and confirmed the full implementation at the Callaway Plant of Order EA-06-037 regarding an updated adversary characteristic of the design basis threat.

The NRC staff has completed its review of the changes related to implementation of Order EA-06-037. As discussed in the enclosed safeguards evaluation (Enclosure 2), the NRC staff has determined that UEC's changes to the Callaway security plans meet the requirements of the NRC Order and Title 10 of the Code of Federal Regulations (10 CFR) Part 73 requirements and are, therefore, acceptable. The effectiveness of these security provisions will continue to be the subject of NRC review and inspection.

Consistent with the Order, an administrative license change to Facility Operating License No.

NPF-30 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I. Please replace Page 5 of the Callaway Facility Operating License No. NPF 30 with the enclosed page (Enclosure 1).

NOTICE: Enclosure 2 contains Security-Related Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.

OFFICIAL

  • .E ONLY -

RECUrn.,

-l.LATED INFORMATION 41,9

OFF!C!A. USE ONLY-SECUR.TY RELATE-D4NFORM.ATICON C. If you have any questions, please contact me at (301) 415-1445.

Sincerely, Jack Donohew, Senior Project Manager Plant Licensing Branch IV Diiinof Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosures:

1. Revised Page 5 of License NPF-30
  • 2. Safeguards Evaluation cc w/encl 1 only: See next page OFFICIA.L USE ONLY - SECURI..

REL.A.T. --D INFORM ATIO

Callaway Plant, Unit 1 cc:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855 John O'Neill, Esq.

Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.

Washington, D.C. 20037 Mr. Keith A. Mills, Supervising Engineer Regional Regulatory Affairs/Safety Analysis AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. Les H. Kanuckel Manager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governor Office Building 200 Madison Street Jefferson City, MO 65102-0360 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102-0176 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Manager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Certrec Corporation 4200 South Hulen, Suite. 630 Fort Worth, TX 76109 Director, Missouri State Emergency

, Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 June 2006

Operating License Revision 047 (11)

Steam Generator Tube Rupture (Section 15.4.4, SSER #3)

Deleted per Amendment No. 169.

(12)

Low Temperature Overpressure Protection (Section 15, SSER #3)

Deleted per Amendment No. 169.

(13)

LOCA Reanalysis (Section 15, SSER #3)

Deleted per Amendment No. 169.

(14)

Generic Letter 83-28 Deleted per Amendment No. 169.

(15)

Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 133, are hereby incorporated into this license. UE shall operate the facility in accordance with the Additional Conditions.

D.

An Exemption from certain requirements of Appendix J to 10 CFR Part 50, are described in the October 9, 1984 staff letter. This exemption is authorized by law and will not endanger life or property or the common defense and security and are.otherwise in the public interest. Therefore, this exemption is hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

UE shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 10 CFR 73.21, are entitled: "Callaway Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0" submitted by letter dated October 20, 2004, as supplemented by the letter May 11, 2006.

F.

Deleted per Amendment No. 169.

Amendment 169 Revised by letter dated February 13',20071