ML070440133
ML070440133 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 02/06/2007 |
From: | Degregorio R Exelon Generation Co, Exelon Nuclear |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML070440133 (2) | |
Similar Documents at Limerick | |
---|---|
Category:Letter
MONTHYEARIR 05000352/20240122024-10-17017 October 2024
[Table view]Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . ML24093A0912024-04-17017 April 2024 Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24096A1372024-04-0505 April 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Limerick Generating Station – Holtec MPC-89CBS RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 2024-09-06 Category:Report MONTHYEARML24180A1592024-06-18018 June 2024
[Table view]EQ-EV-386-GLIM-NP, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . LG-23-059, Owner'S Activity Report (OAR-1) for Li2R 172023-08-10010 August 2023 Owner'S Activity Report (OAR-1) for Li2R 17 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . LG-22-101, Annual Commitment Change Summary Report2022-11-14014 November 2022 Annual Commitment Change Summary Report ML22224A1492022-08-15015 August 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits ML22046A0742022-02-14014 February 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure ML21070A4122021-03-11011 March 2021 Requesting Revision to License Condition in Appendix C in Renewed Facility Operating License ML21083A1712021-02-28028 February 2021 Attachment 3: Limerick Generating Station, Unit 2, 006N3997NP, Revision 1, High Burnup Lead Use Assembly (Hblua) Information Report February 2021 RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping LG-20-105, Annual Commitment Change Summary Report2020-11-23023 November 2020 Annual Commitment Change Summary Report ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20106E8282020-04-15015 April 2020 Submittal of Analytical Evaluation of Core Spray Injection Nozzle-to-Safe End Weld (N5A) ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2018-06-0707 June 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML18129A3342018-05-0404 May 2018 Corrosion Evaluation of the Limerick Unit 2 N-160 Reactor Vessel Nozzle Modification, Framatome Document No. 51-9271770-002 (Non-Proprietary) ML17255A0302017-09-12012 September 2017 Independent Spent Fuel Storage Installation, Registration of Use of Casks to Store Spent Fuel ML17152A3052017-06-0101 June 2017 N-16D Nozzle Repair - Submittal of Analytical Flaw Evaluation, Design Analysis, and Corrosion Evaluation (Rev. 1) ML17137A0682017-05-16016 May 2017 Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs ML17131A1802017-05-11011 May 2017 Issuance of the Core Operating Limits Report (COLR) for Reload 14, Cycle 15 RS-16-177, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The..2016-11-28028 November 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.. ML16309A0172016-11-0404 November 2016 10 CFR 50.59 and 1 O CFR 72.48 Evaluation 24-Month Summary Report for the Period July 1, 2014 Through June 30, 2016 ML16307A0202016-11-0202 November 2016 Special Report - Accident Monitoring Instrumentation Inoperability RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14199A4112014-07-18018 July 2014 Special Report - Seismic Monitoring Instrumentation Inoperability ML14148A2802014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14133A0162014-05-13013 May 2014 ACE Attachment to NRC Chairman Macfarlane Letter of 3-31-14 ML14133A0222014-05-13013 May 2014 ACE Document Received at LIM Aam May 7, 2014 ML14058B1562014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14058B1202014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13357A3312014-01-0606 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Limerick Generating Station, Units 1 and 2, TAC Nos.: MF0847 and MF0848 RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-1382013-10-0707 October 2013 Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 ML13284A1112013-10-0707 October 2013 Appendix AD - Area Walk-by Checklists (Awcs) ML13143A2562013-05-16016 May 2013 NRC Reply to ACE Questions Received March 21 and 27, 2013 RS-13-084, Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency..2013-04-30030 April 2013 Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee RS-12-172, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12342A1162012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 11 of 12 2024-06-18 Category:Miscellaneous MONTHYEARLG-23-059, Owner'S Activity Report (OAR-1) for Li2R 172023-08-10010 August 2023
[Table view]Owner'S Activity Report (OAR-1) for Li2R 17 LG-22-101, Annual Commitment Change Summary Report2022-11-14014 November 2022 Annual Commitment Change Summary Report ML21083A1712021-02-28028 February 2021 Attachment 3: Limerick Generating Station, Unit 2, 006N3997NP, Revision 1, High Burnup Lead Use Assembly (Hblua) Information Report February 2021 ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML17255A0302017-09-12012 September 2017 Independent Spent Fuel Storage Installation, Registration of Use of Casks to Store Spent Fuel ML17131A1802017-05-11011 May 2017 Issuance of the Core Operating Limits Report (COLR) for Reload 14, Cycle 15 ML16309A0172016-11-0404 November 2016 10 CFR 50.59 and 1 O CFR 72.48 Evaluation 24-Month Summary Report for the Period July 1, 2014 Through June 30, 2016 ML14199A4112014-07-18018 July 2014 Special Report - Seismic Monitoring Instrumentation Inoperability ML14148A2802014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14133A0222014-05-13013 May 2014 ACE Document Received at LIM Aam May 7, 2014 ML14058B1202014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14058B1562014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-1382013-10-0707 October 2013 Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 ML13284A1112013-10-0707 October 2013 Appendix AD - Area Walk-by Checklists (Awcs) ML13143A2562013-05-16016 May 2013 NRC Reply to ACE Questions Received March 21 and 27, 2013 RS-13-084, Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency..2013-04-30030 April 2013 Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee RS-12-172, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12342A1022012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 13 of 13 ML12342A1032012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 12 ML12342A1042012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 2 of 12 ML12342A1052012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 3 of 12 ML12342A1062012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 4 of 12 ML12342A1072012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 5 of 12 ML12342A1102012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 6 of 12 ML12342A1182012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 13 ML12342A1122012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 7 of 12 ML12342A1132012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 8 of 12 ML12342A1142012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 9 of 12 ML12342A1152012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 10 of 12 ML12342A1162012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 11 of 12 ML12342A1172012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 12 of 12 ML12342A1192012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 2 of 13 ML12342A1212012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 3 of 13 ML12342A1222012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 4 of 13 ML12342A1232012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 5 of 13 ML12342A1242012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 6 of 13 ML12342A1252012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 7 of 13 ML12342A1262012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 8 of 13 2023-08-10 |
Text
Nuclear TS 4.8.1.1.3 February 6, 2007 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Unit 2 Facility Operating License No. NPF-85 NRC Docket No. 50-353
Subject:
Special Report - D24 Diesel Generator Invalid Failure This Special Report is being submitted pursuant to the requirements of Limerick Generating Station (LGS), Unit 2 Technical Specifications (TS) 6.9.2. TS 4.8.1.1.3, states "All diesel generator failures, valid or non-valid, shall be reported to the Commission in a Special Report pursuant to Specification 6.9.2 within 30 days. Reports of diesel generator failures shall include the information recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977." This event was determined to be an invalid failure that requires reporting per TS 4.8.1.1.3.
On Wednesday, January 17, 2007, with Limerick Unit 2 operating at 100% power, operators were conducting the monthly surveillance run on D24 Emergency Diesel Generator (EDG).
The EDG was started at 09:11 hours. Several minutes later, the operator reset the exciter shutdown when the EDG reached rated speed, which is intended to close the K1 relay (field excitation contactor). This was followed by a local alarm indicating a loss of field excitation condition. The operator at the EDG identified that the K1 relay was open, which was not expected. The EDG was then shutdown as directed by procedure.
Troubleshooting identified that the K1 relay (field excitation contactor) was degraded. The relay was repaired and successfully tested. The EDG was restored to operable status at 03:10 on Thursday, January 18, 2007.
The K1 relay (field excitation contactor) is normally closed when the EDG is in the standby condition and does not change state following an emergency start demand. The relay was verified to be closed after the last monthly test and was re-verified to be closed prior to this test. Therefore, the EDG would have performed its safety function if an accident had occurred in the period between the two monthly tests. The relay is manually opened prior to slow starting the EDG for the monthly test and is manually closed after the EDG is at synchronous speed. This failure was caused by a malfunction of equipment that is not operative in the emergency operating mode; therefore, it should not be considered a valid test or failure per RG 1.108 Rev.1, section C.2.e(2).
The information required to be reported by RG 1.108 Rev.1, section C.3.b is as follows:
The diesel generator unit involved was D24 EDG.
This event was not a valid test failure. There are zero failures in the last 100 valid tests.
The cause of the failure was a defective latch auxiliary switch on the field excitation relay (K1).
The corrective measure taken was to replace the latch auxiliary switch on the field excitation relay (K1).
The EDG was unavailable from 1/17/07 09:30 to 1/18/07 03:10 (less than 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />.)
The current surveillance test interval is 31 days, which is in conformance with the schedule of Regulatory Position C.2.d.
Component Data:
Component: K1 Relay (Field Excitation Contactor)
Manufacturer: ABB Part number: EH250C-125VDCM1 If you have any questions or require additional information, please do not hesitate to contact US.
There are no commitments contained in this letter.
Sincerely, Ex on G Company, LLC cc: S. J. Collins, Administrator, Region I, NRC S.L. Hansell, NRC Senior Resident Inspector, Limerick