Letter Sequence Other |
---|
|
|
MONTHYEARML0703102121999-08-31031 August 1999 Memo to Rules and Directives Branch, Div of Administration Services, Office of Administration, NRC, from: NRR, NRC Indian Point Station Project stage: Other ML20211N0681999-09-0202 September 1999 Informs That Commission Requested Publication of Notice of Consideration of Issuance of Amend to Fol,Proposed NSHC Determination & Opportunity for Hearing. Amend Changes Senior Reactor License Requirement for Operations Manager Project stage: Other 1999-08-31
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML22313A0952022-12-0101 December 2022 Staffing Technical Specification License Amendment Federal Register Notice ML22313A0102022-12-0101 December 2022 Cyber Security License Amendment Federal Register Notice ML22217A0152022-11-0909 November 2022 FRN: Holtec Decommissioning International, LLC, Indian Point Energy Center, Independent Spent Fuel Storage Installation ML22215A0992022-10-26026 October 2022 Environmental Assessment and Finding of No Significant Impact Federal Register Notice ML21356B4982022-02-14014 February 2022 FRN - Indian Point Exemption Request 10 CFR Part 20 Appendix G ML21356B4972022-02-14014 February 2022 Enclosure - Indian Point Exemption Request 10 CFR Part 20 Appendix G ML21181A0282021-07-12012 July 2021 Individual Federal Register Notice, Notification of Public Meeting for Public Comments on Post-Shutdown Decommissioning Activities Report ML21162A0022021-06-15015 June 2021 Individual Federal Register Notice, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report ML21162A0012021-06-15015 June 2021 Transmittal Letter, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report in the Federal Register ML20309A7812020-11-23023 November 2020 Exemption from 10 CFR 50.82 and 10 CFR 50.75 ML20297A3602020-11-23023 November 2020 Federal Register Notice for Order Approving Transfer of Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20309A7852020-11-23023 November 2020 Federal Register Notice for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) for Holtec Decommissioning International, LLC ML20274A0002020-11-0505 November 2020 Letter with Environmental Assessment and Finding of No Significant Impact Use of Decommissioning Trust Funds for Spent Fuel Management and Site Restoration ML20274A0012020-11-0505 November 2020 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact and Exemption ML20236K1302020-09-29029 September 2020 Federal Register Notice Partial Exemption from Record Retention Requirements ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20109A0032020-04-22022 April 2020 FRN - Indian Point Nuclear Generating Unit Nos. 2 and 3 - Exemption from the Requirements of 10 CFR Part 50, Appendix R, Section Iii.H, Related to Fire Brigade Annual Physical Examinations ML20024F0532020-02-13013 February 2020 Extension of Comment Period Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments ML20024F0632020-02-11011 February 2020 Extension of Comment Period for Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing ML20006E1222020-01-15015 January 2020 Individual Federal Register Notice for Consideration of Approval of Transfer of Licenses and Conforming Amendments ML20003D0892020-01-13013 January 2020 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML20003D0882020-01-13013 January 2020 Letter with Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses ML18096B3972018-05-16016 May 2018 Federal Register Notice for Issuance of Supplement 2 to the Indian Point Final Environmental Impact Statement for License Renewal NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17065A0292017-04-13013 April 2017 OEDO-16-00411: Federal Register Notice Final Director'S Decision Under 10 CFR 2.206 NRC-2017-0074, OEDO-16-00411: Federal Register Notice Final Director'S Decision Under 10 CFR 2.2062017-04-13013 April 2017 OEDO-16-00411: Federal Register Notice Final Director'S Decision Under 10 CFR 2.206 ML16336A5002017-01-27027 January 2017 Federal Register Notice of Issuance of Order for Mta Transfer of Indian Pt 3 and FitzPatrick to Entergy Nuclear Operations, Inc. NRC-2017-0015, Federal Register Notice of Issuance of Order for Mta Transfer of Indian Pt 3 and FitzPatrick to Entergy Nuclear Operations, Inc. (CAC Nos. MF8286 and MF8287)2017-01-27027 January 2017 Federal Register Notice of Issuance of Order for Mta Transfer of Indian Pt 3 and FitzPatrick to Entergy Nuclear Operations, Inc. (CAC Nos. MF8286 and MF8287) NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 20162016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16257A5172016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16231A1402016-09-0707 September 2016 OEDO-16-00411: Acknowledgement Letter for Petitioner Lochbaum Concerning the Reactor Vessel Baffle-Former Bolt Degradation Identified During the Spring 2016 Refueling Outage at Indian Point Nuclear Generating Unit 2 NRC-2016-0197, OEDO-16-00411: Federal Register Notice Regarding 10 CFR 2.206 Petition for Indian Point Nuclear Generating, Unit No. 22016-09-0707 September 2016 OEDO-16-00411: Federal Register Notice Regarding 10 CFR 2.206 Petition for Indian Point Nuclear Generating, Unit No. 2 ML16231A1442016-09-0707 September 2016 OEDO-16-00411: Federal Register Notice Regarding 10 CFR 2.206 Petition for Indian Point Nuclear Generating, Unit No. 2 ML16119A4662016-04-28028 April 2016 Federal Register Notice: 05/04/16 - Short Notice ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML16004A1182016-01-0707 January 2016 FRN, Issuance of Confirmatory Orders, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended ML15329A0822015-12-21021 December 2015 FRN, Notice of Availability of Draft Supplement to Supplement 38 to the GEIS ML15320A2722015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests ML15320A2762015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests NRC-2015-0246, Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests2015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests ML15182A0152015-10-22022 October 2015 Draft Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests (CAC Nos. MF2603 - MF2605 and MF2637 - MF2639) ML15182A0172015-10-22022 October 2015 Draft Environmental Assessment (TAC Nos. MF2603-MF2605 and MF2637 - MF2639) ML15204A2792015-07-27027 July 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 4, 2015 ML15190A0362015-07-22022 July 2015 Federal Register Notice Withdrawal of an Amendment Request ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 NRC-2015-0123, Application and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for2015-05-20020 May 2015 Application and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Acce ML15125A4952015-05-20020 May 2015 Application and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Acce 2022-02-14
[Table view] Category:Memoranda
MONTHYEARML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23103A2742023-04-25025 April 2023 04-25-23 - Letter to the Honorable Charles Schumer, Et Al., Responds to Concerns Regarding Holtec Decommissioning Internationals Plans to Release Effluents at the Indian Point Energy Center ML21232A2342021-08-20020 August 2021 Memo - Revised Transcript for Public Meeting Held on July 29, 2021, in Tarrytown, Ny, Re IP Energy Center Post-Shutdown Decommissioning Activities Report ML21056A0772021-04-0707 April 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Indian Point ISFSI (Docket: 72-51) ML20104A3882020-04-13013 April 2020 Tasking in Response to the Concerns Pertaining to Gas Transmission Lines at the Indian Point Nuclear Power Plant Follow Up Activities Agency Level ML20104A7232020-04-13013 April 2020 Tasking in Response to the Concerns Pertaining to Gas Transmission Lines at the Indian Point Nuclear Power Plant; Follow Up Activities; Office Level ML20099F7752020-04-0909 April 2020 Report Transmittal Memo to the Commissioners, from: Margaret M. Doane ML20058E3542020-02-27027 February 2020 Tasking Memo to Dskeen Re Concerns Identifed in Report Pertaining to Gas Transmission Lines ML20056F0952020-02-13013 February 2020 Concerns Pertaining to Gas Transmission Lines at the Indian Point Nuclear Power Plant ML18046B4412018-02-23023 February 2018 Review of Updated Final Safety Analysis Report, Revision 7 ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17180A5032017-09-21021 September 2017 04/19/2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application ML17157B5422017-06-20020 June 2017 Conference Call on 2nd Round RAIs - Final ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 ML17060A6602017-04-12012 April 2017 Potentially Cost-Beneficial SAMAs ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 ML16336A4992017-01-18018 January 2017 Notice of Significant Licensing Action ML17052A3002017-01-11011 January 2017 Security Exclusion Zone Acoustic Tag Detection Study, 9 November 2016 ML17052A3092017-01-11011 January 2017 Atlantic Sturgeon Distribution Memo ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15190A2912015-07-22022 July 2015 070115, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Safety Review ML15139A1952015-05-19019 May 2015 Special Inspection Team Charter - Indian Point Nuclear Generating Unit 3 - Water Accumulation in Safety-Related Switchgear Room Following Deluge of Main Transformer Fire ML15107A1752015-04-28028 April 2015 041615, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review ML15091A0972015-04-0101 April 2015 Figures from Indian Point Quarter 3 2014 Groundwater Monitoring Report - Part 4 ML14344A9652014-12-18018 December 2014 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review ML14269A1972014-10-0303 October 2014 LTR-14-0463-1 - Proposed Comments to the Federal Energy Regulatory Commission'S Draft Environmental Impact Statement Algonquin Incremental Market Project (Docket No. CP14-96-000) ML13256A0432013-09-10010 September 2013 Request for Additional Information to Entergy Nuclear Northeast, Indian Point Units 2 and 3, Regarding NTTF Recommendation 9.3 Phase 1 Staffing Assessments Submittal ML13218A0862013-08-0808 August 2013 Notice of Forthcoming Meeting with Entergy Nuclear Operations, Inc. and Netco to Discuss the Goals and Objectives of the Long-Term Spent Fuel Pool Improvement Program for Indian Point Unit 2 and 3 ML13102A1242013-04-15015 April 2013 Summary of April 11, 2013, Telephone Conference Call Between NRC and Entergy Entry of Indian Point Nuclear Generating Unit No. 2 Into the Period of Timely Renewal ML12361A1552012-12-26026 December 2012 Summary of Entergy Drop-In on December 19, 2012 ML12296A9292012-10-23023 October 2012 Memo Draft Request for Additional Information for Indian Point Units 1 and 2 Memo ML12215A2482012-09-17017 September 2012 Summary of Conference Call Held on June 4, 2012, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Reactor Vessel Internals Program at Indian Point Nuclear Generating Station, Units 2 and 3 ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12137A0602012-05-29029 May 2012 Nuclear Regulatory Commission'S Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1, 2 & 3; and Pilgrim Nuclear Power Station ML1122701452011-08-30030 August 2011 Summary of Conference Call Between NRC and Entergy Nuclear Operations, Regarding Non-EQ Inaccessible Medium-Voltage Cable Program for Indian Point Units 2 & 3 ML11201A3062011-07-29029 July 2011 Summary of Telephone Conference Calls Held on June 20, June 22, and June 29, 2011, Regarding the Ongoing Endangered Species Act Consultation for the Proposed Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal NL-11-093, Clean Water Act Section 401 Water Quality Certification Waiver2011-07-29029 July 2011 Clean Water Act Section 401 Water Quality Certification Waiver ML1118703442011-07-0606 July 2011 Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11102A0062011-05-0909 May 2011 01/12/11 Summary of Telephone Conference Call Between Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Final SEIS for the Proposed License Renewal of Indian Point, Units 2 and 3 ML1110909492011-04-25025 April 2011 Notice of Meeting G20110221/EDATS:OEDO-2011-0226- with the State of New York Attorney General'S Office (the Petitioner) Requesting Action Under 10 CFR 2.206 Regarding Fire Protection at Indian Point ML1110909052011-04-22022 April 2011 NRC and Entergy Nuclear Operations, Inc. Held a Category 1 Public Meeting on April 18, 2011, to Discuss the Shortnose Sturgeon ML1110103962011-04-11011 April 2011 Notice of Forthcoming Meeting with Entergy Nuclear Operations, Inc. to Discuss the License Amendment Requests to Permit the Transfer of Spent Fuel from the Indian Point Unit 3 Spent Fuel Pool to the Unit 2 Spent Fuel Pool ML1109803932011-04-0808 April 2011 Forthcoming Meeting with NRC and Entergy Operations, Inc ML11223A0412011-03-23023 March 2011 Memorandum from J. Boska, NRR to T. Quay, NRR on Review of 10 CFR 2.206 Petition on Gas Pipelines Near the Indian Point Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1029106182010-10-14014 October 2010 Documentation of Telephone Conversation Between Mr. David Lochbaum Regarding Follow-Up Questions Related to NRC Letter Dated July 28, 2010 (ML102040807) ML0931701682009-11-17017 November 2009 Summary of Teleconference Call Held on 11/3/09 Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Meteorological Data Used for the Severe Accident Mitigation Alternative Analyses 2023-04-25
[Table view] |
Text
T", -- II t
-,.-:JNITED
- STATES -7.
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NAto-t 31, 1999 MORANDUM TO: Rules and Directives Branch Division of Administrative Services Office of Administration OM: Office of Nuclear Reactor Regulation LBJECT: M=* SnowIC, 9M*J I One signed original of' the FederalRegister Notice identified below is attached for your transmittal
- to the Office of the FederalRegister for publication. Additional conformed copies ( 5 ) of the Notice are enclosed for your use.
'--D Notice of Receipt of Application for Construction Permit(s) and Operating .License(s).
"-j-'-lotiýe'of Receipt of Partial Application for Construction Permit(s) and Facility License(s):-
Time for submission of Views on Antitrust matters.
F= Notice of Consideration of Issuance of Amendment to Facility Operating License. (Call with 30-day insert date).
Notice of Receipt.of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice Z/ of Opportunity for Hearing.
D Notice of Availability of NRC Draft/Final Environmental Statement.
L Notice of Limited Work Authorization.
- Notice of Availability of Safety Evaluation Report.
.. ] Notice of Issuance of Construction Permit(s).
f---] Notice of Issuance of Facility Operating License(s) or Amendment(s).
Ei Order.
U Exemption.
[ Notice of Granting Exemption.
D Environmental Assessment.
F-- Notice of Preparation of Environmental Assessment.
L-] Receipt of Petition for Director's Decision Under 10 CFR 2.206.
E7 Issuance of Final Director's Decision Under 10 CFR 2.206.
[J Other: " .... O 7- / "
DOCKET NO. 503 Attachment(s): As stated
Contact:
- 1. ' ,-<.,.'
Telephone: 41--14g1 , ,1 C G-\eib NJ r&g/
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 2, 1999 Mr. A. Alan Blind Vice President - Nuclear Power Indian Point Station, Unit 1 Consolidated Edison Company of New York, Inc.
Broadway and Bleakley Avenue Buchanan, New York 10511
SUBJECT:
INDIAN POINT STATION, UNIT 1 - NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT RE: SENIOR REACTOR LICENSE REQUIREMENTS (TAC NO. MA6302)
Dear Mr. Blind:
The Commission has requested the Office of the Federal Register to publish the enclosed "Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for A Hearing."
This notice relates to your amendment application dated July 20, 1999, which would revise the Technical Specifications to change the senior reactor license requirement for the Operations Manager.
Sincerely, 46-# L. Minns, Project Manager commissioning Section Project Directorate IV& Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No.50-003
Enclosure:
Notice cc w/encl: See next page
September 2, 1999 Mr. A. Alan E,%Zid Vice Presidei it - Nuclear Power Indian Point :t-" it 1 Consolidatedi ,. f&ion Company of New Yor!' .
Broadway K.-ikley Avenue Buchanan, .j) "c "511
SUBJECT:
' , POINT STATION, UNIT 1 - NOTICE OF CONSIDERATION OF
..: ' *.q~OF AMENDMENT RE: SENIOR REACTOR LICENSE
'*. MENTS (TAC NO. MA6302)
The .>.m.io. has requested the Office of the Federal Register to publish the enclosed "No,., :Consideration of Issuance of Amendment to Facility Operating License, Proposed No ,, Hazards Consideration Determination, and Opportunity for A Hearing."
This notice rL oilo-*-ir amendment application dated July 20, 1999, which would revise the Technical Sp..,emi..... ..i o change the senior reactor license requirement for the Operations Manager.
Sincerely, ORIG. 'SIGNED BY John L. Minns, Project Manager Decommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. C,-7,,00 DISTRIBUTION Docket File ACRS/ACNW
Enclosure:
'Notice PUBLIC OGC PDIV/D-3 Reading R.Bellamy, RI
-3\lndianPoint\lnd Notice Oper Mngr.wpd OFFICIAL RECORD COPY
Indian Point Nuclear Generating Station, Unit 1 cc:
Mayor, Village of Buchanan Charlie Donaldson, Esquire 236 Tate Avenue , Assistant Attorney General Buchanan, NY 10511 New York Department of Law 120 Broadway Mr. John McCann New York, NY 10271 Manager of Nuclear Safety and Licensing Mr. John P. Spath Consolidated Edison Company NYS Energy Research and Development of New York, Inc. Authority Broadway and Bleakley Avenue Corporate Plaza West Buchanan, NY 10511 286 Washington Avenue Extension Albany, NY 12203-6399 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mayor Alfred Donohew P.O. Box 38 Village of Buchanan Buchanan, NY 10511 236 Tate Avenue Buchanan, NY 10511 Mr. Brent L. Brandenburg Assistant General Counsel Senior Resident Inspector Consolidated Edison Company U.S. Nuclear Regulatory Commission of -New York, Inc. P.O. Box 38 4 Irving Place - 1822 Buchanan, NY 10511 New York, NY 10003 Paul Eddy Mr. Peter Kokolakis, Director New York State Public Service Commission Nuclear Licensing 3 Empire Plaza Power Authority of the State Albany, NY 12203-6399 of New York 123 Main Street Mr. James S. Baumstark, Vice President White Plains, NY 10601. Consolidated Edison Company of New York, Inc.
Mr. Hubert J. Miller, Regional Administrator 4 Irving Place - 1822 Region I New York, NY 10003 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Tom Rose Secretary - NFSC Consolidated Edison Company of New York, Inc.
4 Irving Place - 1822 New York, New York 10003
7590-01 -P UNITED STATES NUCLEAR REGULATORY COMMISSION CONSOLIDATED EDISON COMPANY OF NEW YORK, INC.
INDIAN POINT NUCLEAR GENERATING STATION, UNIT 1 DOCKET NO.50-003 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. DPR-5 issued to Consolidated Edison
-Company of New York, Inc. (the licensee), for the permanently shutdown Indian Point Nuclear Generating Station, Unit 1, located in Buchanan, New York.
The proposed amendment would revise Technical Specification (TS) Section 3.2.1.i. to be consistent with a similar TS for Indian Point, Unit 2. Specifically, Indian Point, Unit 1, Section 3.2.1.i would be revised to change the requirement that the operations manager or assistant operations manager be a licensed senior reactor operator. The revision would allow an individual who does not hold a current senior reactor operator license to be appointed as operations manager or assistant operations manager provided all other qualification requirements of ANSI N18.1-1971 are met.
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.
The Commission has made a proposed determination that the amendment request involves no significant hazards consideration. Under the Commission's regulations in 10 CFR
2 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
The proposed change does not involve a significant hazards consideration because:
- 1. [The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.]
...This proposed change (to the TS Section 3.2.1.i] is administrative in nature.
...This change does not affect possible initiating events for accidents previously evaluated or alter the configuration or operation of the facility. The Limiting Safety System Settings and Safety Limits specified in the current Technical Specifications remain unchanged. Therefore, the proposed change would not involve a significant increase in the probability or in the consequences of an accident previously evaluated.
- 2. [The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.]
No. The proposed change is administrative in nature. The safety analysis of the facility remains complete and accurate. There are no physical changes to the facility and the plant conditions for which design basis accidents have been evaluated are still valid. The operating procedures and the emergency procedures are unaffected. Consequently no new failure modes are introduced as a result of the proposed change. Therefore, the proposed changes would not create the possibility of a new or different kind of accident from any new accident previously evaluated.
- 3. [The proposed change does not involve a significant reduction in a margin of safety.]
No. The proposed change is administrative in nature. Since there are no changes to the operation of the physical design of the facility, the Updated Final Safety Analysis Report (UFSAR) design basis, accident assumptions, or Technical Specification Bases are not affected. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
3 The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination.
Normally, the Commission will not issue the amendment until the expiration of the 30-day notice period. However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license amendment before the expiration of the 30-day notice period, provided that its final determination is that the amendment involves no significant hazards consideration. The final determination will consider all public and State comments received. Should the Commission take this action, it will publish in the FEDERAL REGISTER a notice of issuance and provide for opportunity for a hearing after issuance. The Commission expects that the need to take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules and Directives Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this FEDERAL REGISTER notice. Written comments may also be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m.
to 4:15 p.m. Federal workdays. Copies of written comments received may be examined at the NRC Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC.
4 The filing of requests for hearing and petitions for leave to intervene is discussed below.
By October 12, 1999, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene.
Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2.
Interested persons should consult a current copy of 10 CFR 2.714 which is available at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the White Plains Public Library, 100 Martine Avenue, White Plains, New York, 10601. If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board, designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the, designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors: (1) the nature of the petitioner's right under the Act to be made party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest.
The petition should also identify the specific aspect(s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a petition for leave to
5 intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to 15 days prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner shall provide a brief explanation of the bases of the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion.
Petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to file such a supplement which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.
6 If a hearing is requested, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held.
If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment.
If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment.
A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, or may be delivered to the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the above date. A copy of the petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and to Brent L. Brandenburg, Esq., 4 Irving Place, New York, 10003, attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or request should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
7 For further details with respect to this action, see the application for amendment dated July 20, 1999, which is available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the White Plains Public Library, 100 Martine Avenue, White Plains, New York 10601.
Dated at Rockville, Maryland, this 2nd day of September 1999.
FOR THE NUCLEAR REGULATORY COMMISSION Mins, Project Manager commissioning Section P eject Directorate IV & Decommissioning Dvision of Licensing Project Management of Nuclear Reactor Regulation fficOce