Notification of Vogtle Nuclear Power Plant- Component Design Bases Inspection - NRC Inspection Report 05000424/2007006, 05000425/2007006
ML070050302
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/05/2007
From: Ogle C
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
IR-07-006
Download: ML070050302 (6)


See also: IR 05000424/2007006

Text

2

January 5, 2007

Southern Nuclear Operating Company, Inc.

ATTN:

Mr. T E. Tynan

Site Vice President

7821 River Road

Waynesboro, GA 30830

SUBJECT:

NOTIFICATION OF VOGTLE NUCLEAR POWER PLANT- COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000424/2007006, 05000425/2007006

Dear Mr. Tynan:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Vogtle Nuclear Power

Plant during the weeks of April 23-27, 2007, May 7-11, 2007, and May 21-25, 2007. The

inspection team will be led by Mike Cain, a Senior Reactor Inspector from the NRC's Region II

Office. This inspection will be conducted in accordance with the baseline inspection procedure,

Procedure 71111.21, Component Design Bases Inspection, issued June 22, 2006.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and support proper system operation. The inspection will also include a review of

selected operator actions, operating experience, and modifications.

During a telephone conversation on January 03, 2007, Mr. Cain confirmed with Mr. M. Sharma

of your staff, arrangements for an information gathering site visit and the three-week onsite

inspection. The schedule is as follows:

Information gathering visit: Week of April 9-13, 2007.

Onsite weeks: April 23-27, 2007, May 7-11, 2007, and May 21-25, 2007.

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. Walt Rogers, a Region II Senior Reactor

Analyst, may accompany Mr. Cain during the information gathering visit to review probabilistic

risk assessment data and identify risk significant components which will be examined during the

inspection.

The enclosure lists documents that will be needed prior to the information gathering visit.

Please contact Mr. Cain prior to preparing copies of the materials listed in the enclosure.

The inspectors will try to minimize your administrative burden by specifically identifying only

those documents required for the inspection preparation.

SNC

2

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space, supplemental documents requested to be made

available to the team in the Region II office prior to the inspection preparation week of April 16,

2007; arrangements for site access; and the availability of knowledgeable plant engineering and

licensing personnel to serve as points of contact during the inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Cain at (404) 562-4876 or me at

(404) 562-4601.

Sincerely,

/RA/

Charles R. Ogle, Acting Deputy Director

Division of Reactor Safety

Docket Nos: 50-424, 50-425

License Nos: NPF-68, NPF-81

Enclosure: Information Request for Component Design Basis Inspection

cc w/encl: (See page 3)

SNC

3

J. T. Gasser

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

N. J. Stringfellow

Manager-Licensing

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Bentina C. Terry

Southern Nuclear Operating Company, Inc.

Bin B-022

P. O. Box 1295

Birmingham, AL 35201-1295

Director, Consumers' Utility Counsel

Division

Governor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

Director, Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Manager, Radioactive Materials Program

Department of Natural Resources

Electronic Mail Distribution

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

Laurence Bergen

Oglethorpe Power Corporation

Electronic Mail Distribution

Resident Manager

Oglethorpe Power Corporation

Alvin W. Vogtle Nuclear Plant

Electronic Mail Distribution

Arthur H. Domby, Esq.

Troutman Sanders

Electronic Mail Distributioin

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

Electronic Mail Distribution

Reece McAlister

Executive Secretary

Georgia Public Service Commission

244 Washington Street, SW

Atlanta, GA 30334

_________________________

OFFICE

RII:DRP

RII:DRS

SIGNATURE

/RA/

/RA/

NAME

S. Shaeffer

L.Cain

DATE

01/05/2007

01/05/2007

1/ /2007

1/ /2007

1/ /2007

1/ /2007

1/ /2007

E-MAIL COPY?

NO YES

YES

NO YES

NO YES

NO YES

NO YES

NO

Enclosure

INFORMATION REQUEST FOR VOGTLE NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. Lists

should contain enough information to be easily understood to someone who has a knowledge

of pressurized water reactor technology.

1.

From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a.

Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b.

A list of the top 500 cutsets.

c.

A risk ranking of all operator actions, sorted by RAW.

2.

From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a.

Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b.

A list of the top 500 cutsets.

c.

A risk ranking of all operator actions, sorted by RAW.

3.

Human reliability worksheets for the operator actions included in your PSA model.

4.

Any pre-existing evaluation or list of components and calculations with low design margins

(i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design

required output, heat exchangers close to rated design heat removal, MOV risk-margin

rankings, etc.).

5.

A list of operating experience evaluations completed within the last two years, sorted by

associated component and/or system.

6.

A list of design modifications implemented within the last two years, sorted by affected

system.

7.

A list of corrective-action evaluations that involved plant equipment and were completed

within the last two years, sorted by involved component or system.

8.

A list of common-cause failure of components that have occurred at Vogtle and have been

identified within the last five years.

2

Enclosure

9.

A list of operability evaluations completed within the last two years, sorted by associated

component or system.

10. Contact information for a person to discuss PRA information prior to information gathering

trip: name, title, phone number, and e-mail address.

11. List of equipment currently on the sites Station Equipment Reliability Issues List, including

a description of the reason(s) why each component is on that list and summaries (if

available) of your plans to address those reasons.

12. List of equipment currently in RIS-05-020 (Formerly GL 91-18) status.

13. List of equipment currently in MR (a)(1) status.