ML063620537

From kanterella
Jump to navigation Jump to search
Renewal of Operating License R-112
ML063620537
Person / Time
Site: Reed College
Issue date: 01/11/2007
From: Hughes D
NRC/NRR/ADRA/DPR/PRTA
To: Frantz S
Reed College
Hughes D, NRR/DPR/PRT, 301-415-1631
References
Download: ML063620537 (5)


Text

January 11, 2007 Mr. Stephen G. Frantz, Director Reed Reactor Facility Reed College 3203 S.E. Woodstock Boulevard Portland, OR 97202-8199

SUBJECT:

RENEWAL OF OPERATING LICENSE NO. R-112

Dear Mr. Frantz:

This letter is to remind you that License No. R-112 for the Reed Reactor Facility is scheduled to expire on October 3, 2007, and to provide you guidance for preparing your application for a renewal of the license. Title 10 of the Code of Federal Regulations (10 CFR 2.109) allows continued operation under your current license until the Nuclear Regulatory Commission (NRC) acts upon an application for renewal provided the application is received at least 30 days prior to the expiration date of your current license.

The NRC considers the renewal of a research reactor operating license to be equivalent to reissuing the license. Therefore, renewal is not merely a routine administrative step, but involves in-depth reviews of all documentation related to the facility, an onsite review, and publication in the Federal Register of a notice of your request that provides the opportunity for public participation, as well as a notice of the results of our review of your application.

Your renewal application should address the requirements in applicable sections of Title 10 of the Code of Federal Regulations, and should demonstrate that the reactor can continue to be operated safely and without adverse impact on the environment or the public. For the review of your renewal application, the NRC staff will consider the guidance contained in the NRC Division 2 Regulatory Guides for Research Reactors (reproduced in Enclosure 1), NUREG-1537, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors" (Enclosure 1), and the industry standards in the American Nuclear Society ANS-15 Series for research reactors.

In order for us to perform an adequate review, you are requested to include, as part of your application, all of the following documentation, in accordance with 10 CFR 50.33 and 50.34:

1. Updated Safety Analysis Report (SAR)

A complete updated edition of your Safety Analysis Report (SAR) is required to be submitted with your renewal application. The SAR should include information that describes the facility and all changes made during the license period; the design bases and limits on its operation; and a safety analysis of the structures, components and systems to ensure that they will be able to continue to perform their intended functions.

Potential and reasonable accident scenarios and their consequences should be analyzed using the best current input data and computational techniques. Information should be compared, wherever possible, with facility operating experience.

Furthermore, the SAR should include, if applicable, updated information and analyses on demography, meteorology, geology, seismology, and other natural and unnatural phenomena.

2. Financial Qualifications (10 CFR 50.33(f))

This information must show that there is reasonable assurance that you will be able to obtain the funds necessary to cover estimated operating costs for the period of the requested license renewal plus the estimated costs of decommissioning the facility. To facilitate our review, we request that the following information be provided, appropriately certified:

a. The most recently published annual financial statement of the College. Indicate the source of funds utilized to cover costs of operation of the Reed Reactor Facility.
b. The estimated annual cost to operate the reactor facility for the first five years of the requested period of renewal, the underlying assumptions and bases of the estimate, and the sources of funds to cover these costs, and
c. The estimated costs of eventually shutting down the reactor and safely disposing of it, a listing of what is included in these costs, the assumptions underlying these estimated costs, the type of shutdown contemplated, and the source of funds to cover these costs.
3. Environmental Report (10 CFR Part 51)

Your Environmental Report should include sufficient operational data, analyses, and discussions to provide a substantial basis for NRC to develop its environmental assessment.

4. Technical Specifications The content and format of Technical Specifications should be developed considering the guidance in ANSI/ANS 15.1-1990, "The Development of Technical Specification for Research Reactors" and NUREG-1537. Any changes to the current Technical Specifications should be proposed and justified at the time of the license renewal application so they can be evaluated during the review. The bases for the Technical Specifications should be given in the SAR.
5. Operator Requalification Program (10 CFR 50.54 (i-1) and 10 CFR Part 55)

A copy of your current and implemented operator requalification program will be reviewed with your renewal application to ensure it meets current NRC requirements for research reactors. Please submit any changes you wish to make as part of the renewal application.

6. Emergency Plan (10 CFR 50.54(q) and and 10 CFR 50, Appendix E)

We may review your approved emergency plan to ensure compliance with current NRC requirements. If you have no changes you wish to make as part of the license renewal, you need only reference those respective Reed College and NRC

documents. However, if you wish to modify your emergency plan, any changes should be submitted for NRC review in accordance with the above-cited regulations.

7. Physical Security Plan (10 CFR 73.67)

You have an approved physical security plan on file with NRC which we may review.

Accordingly, you need only reference the existing security plan. However, if you wish to modify your physical security plan, changes should be made in accordance with the requirements of 10 CFR 50.54(p) or 10 CFR 50.90.

8. Filing of Application The requirements for submitting your renewal application and all other formal documentation relating to your license with respect to addressee, oath or affirmation, signatory, and number of copies are defined in 10 CFR 50.4 and 10 CFR 50.30.
9. Staff Visit As a part of our review of your facility, members of the NRC licensing staff may visit your facility. This visit will be coordinated with you following receipt of your application for renewal.

For your further guidance in preparing the proper information to be included in your license renewal application, we are enclosing a copy of a license package issued for a research reactor facility (North Carolina State University, Enclosure 2). This includes the staff's Safety Evaluation Report (NUREG-1572), Environmental Assessment, and the new license for the reactor. Upon completion of our review and a favorable evaluation of your facility, similar documents will be issued in conjunction with renewal of your reactor operating license. The Safety Evaluation Report is provided as an example of the type of findings we must make.

Your documentation must provide the technical and descriptive information that will support our issuance of a similar evaluation for your facility.

If you have any questions, please contact me at 301-415-1631.

Sincerely,

/RA/

Daniel E. Hughes, Project Manager Research and Test Reactors Branch A Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-288

Enclosures:

As stated cc w/encls: Please see next page

Reed College Docket No. 50-288 cc:

Mayor of the City of Portland 1220 Southwest 5th Avenue Portland, OR 97204 Reed College ATTN: Dr. Peter Steinberger Dean of Faculty 3203 S.E. Woodstock Boulevard Portland, OR 97202-8199 Reed College ATTN: Dr. Colin Diver, President 3203 S.E. Woodstock Boulevard Portland, OR 97202-8199 Ken Niles, Assistant Director Oregon Department of Energy 625 Marion Street NE Salem, OR 97301-3737 Terry D. Lindsey, Program Director Radiation Control Program Oregon Health Services Department of Human Services 800 NE Oregon Street, Suite 640 Portland, OR 97232-2162 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611

documents. However, if you wish to modify your emergency plan, any changes should be submitted for NRC review in accordance with the above-cited regulations.

7. Physical Security Plan (10 CFR 73.67)

You have an approved physical security plan on file with NRC which we may review.

Accordingly, you need only reference the existing security plan. However, if you wish to modify your physical security plan, changes should be made in accordance with the requirements of 10 CFR 50.54(p) or 10 CFR 50.90.

8. Filing of Application The requirements for submitting your renewal application and all other formal documentation relating to your license with respect to addressee, oath or affirmation, signatory, and number of copies are defined in 10 CFR 50.4 and 10 CFR 50.30.
9. Staff Visit As a part of our review of your facility, members of the NRC licensing staff may visit your facility. This visit will be coordinated with you following receipt of your application for renewal.

For your further guidance in preparing the proper information to be included in your license renewal application, we are enclosing a copy of a license package issued for a research reactor facility (North Carolina State University, Enclosure 2). This includes the staff's Safety Evaluation Report (NUREG-1572), Environmental Assessment, and the new license for the reactor. Upon completion of our review and a favorable evaluation of your facility, similar documents will be issued in conjunction with renewal of your reactor operating license. The Safety Evaluation Report is provided as an example of the type of findings we must make.

Your documentation must provide the technical and descriptive information that will support our issuance of a similar evaluation for your facility.

If you have any questions, please contact me at 301-415-1631.

Sincerely,

/RA/

Daniel E. Hughes, Project Manager Research and Test Reactors Branch A Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-288

Enclosures:

As stated cc w/encls: Please see next page DISTRIBUTION: w/o enclosure PUBLIC RTR Reading File OGC AAdams CBassett DCollins PDoyle JEads WEresian DHughes EHylton PIsaac WKennedy MMendonca CMontgomery JNguyen JQuichocho WSchuster MVoth KWitt PYoung ACCESSION NO.: ML063620537 TEMPLATE #: NRR-056 OFFICE PRTA:GE PRTB:PM PRT:LA PRTA:BC NAME WSchuster DHughes EHylton DCollins DATE 12/28/2006 01/11/2007 1/08/2007 01/11/2007 OFFICIAL RECORD COPY