INDIANA MICHIGAN POWERO A unit of American Electric Power December 15, 2006 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 AERcom AEP:NRC:6055-22 10 CFR 50.55a Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 REQUEST FOR APPROVAL OF RISK-INFORMED INSERVICE INSPECTION PROGRAM SUPPLEMENTAL INFORMATION
References:
- 1. Letter from Joseph N. Jensen, Indiana Michigan Power Company (I&M) to Nuclear Regulatory Commission (NRC) Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Request for Approval of Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping American Society of Mechanical Engineers Code Category B-F, B-J, C-F-1, and C-F-2 Piping Welds," AEP:NRC:6055-09, Accession Number ML062850540, dated September 29, 2006.
- 2. Letter from Mark A. Peifer, I&M, to JesseL. Funches, NRC, "Donald C. Cook Nuclear Plant Units 1 and 2, Request for Exemption from Fee Requirements Associated with Risk-Informed Inservice Inspection Program Request,"
AEP:NRC:6170-01, Accession Number ML063030342, dated October 13, 2006.
- 3. Letter from Jesse L. Funches, NRC, to Mano K. Nazar, I&M, Accession Number ML063390570, dated December 5, 2006.
In Reference 1, Indiana Michigan Power Company (I&M) submitted a request for approval of a proposed risk-informed inservice inspection (RI-ISI) program for American Society of Mechanical Engineers (ASME) Code Class 1 and 2 piping welds. As a part of the request, I&M volunteered to serve as a pressurized water reactor pilot plant for an ASME Code Case N-716 based RI-ISI program. In Reference 2, I&M requested a waiver of fees for the review of the proposed RI-ISI programn.
In Reference 3, the Nuclear Regulatory Commission (NRC) denied I&M's fee waiver request.
NRC personnel subsequently requested that I&M confirm its request for NRC review and approval of the RI-ISI program proposed by Reference 1, and confirm that I&M agrees to pay
U. S. Nuclear Regulatory Conmmission Page 2 AEP:NRC:6055-22 the fees associated with the NRC review and approval of the proposed progranm I&M hereby confirms its request for NRC review and approval of the proposed RI-ISI program and agrees to pay the fees associated with the review.
This letter contains no new conm-mitments.
Should you have any questions, please contact Ms. Susan D. Simpson, Regulatory Affairs Manager, at (269) 466-2428.
Sincerely, 6bnsen Site Support Services Vice President RGV/rdw c:
J. L. Caldwell - NRC Region III K. D. Curry - AEP Ft. Wayne J. T. King-MPSC MDEQ - WHMD/RPMWS NRC Resident Inspector P. S. Tam-NRC Washington, DC