ML063520272
| ML063520272 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/14/2006 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| TAC MD1859 | |
| Download: ML063520272 (1) | |
Text
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.7.7 Verify each pump develops a flow rate In accordance
> 41.2 gpm at a discharge pressure with the
> 1320 psig.
Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem 24 months on a from pump into reactor pressure vessel.
STAGGERED TEST BASIS SR 3.1.7.9 Verify all heat traced piping between 24 months storage tank and pump suction valve is unblocked.
AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after piping temperature is restored to
> 70°F SR 3.1.7.10 Verify sodium pentaborate enrichment Prior to is > 25 atom percent B-10, addition to SLC tank NMP2' Amendment 94,-444, 117