ML063390087

From kanterella
Jump to navigation Jump to search
Proposed Change Number 521 Supplement 1 Application to Amend Technical Specifications to Delete Requirements for Fuel Handling Isolation Signals and Fuel Handling Building Post-Accident Cleanup Filter Systems
ML063390087
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/30/2006
From: Katz B
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML063390087 (8)


Text

>

'SOUTHERN CALIFORNIA An E EDISONA An EDISON INTERNATIONAL Company Brian Katz Vice President November 30, 2006 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

San Onofre Nuclear Generating Station Units 2 and 3 Docket Nos. 50-361 and 50-362 Proposed Change Number (PCN) 521 Supplement 1 Application to Amend the Technical Specifications to Delete the Requirements for Fuel Handling Isolation Signals and Fuel Handling Building Post-Accident Cleanup Filter Systems

References:

1)

Letter dated December 6, 2005 from Brian Katz (Southern California Edison (SCE)) to the Document Control Desk (Nuclear Regulatory Commission (NRC)),

Subject:

San Onofre Nuclear Generating Station, Units 2 and 3, Docket Nos. 50-361 and 50-362, Proposed Change Number (PCN) 521, Application To Amend the Technical Specifications To Delete the Requirements For Fuel Handling Isolation Signals and Fuel Handling Building Post-Accident Cleanup Filter Systems

2)

Letter dated September 19, 2006 from N. Kalyanam (NRC) to Richard M. Rosenblum (SCE),

Subject:

San Onofre Nuclear Generating Station, Units 2 and 3 -Issuance Of Amendments re:

Technical Specification Improvement Regarding Steam Generator Tube Integrity Based On Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-449, "Steam Generator Tube Integrity" (TAC Nos. MC9236 and MC9237)

Dear Sir or Madam:

By Reference 1, Southern California Edison (SCE) submitted amendment requests 239 and 223 to the Technical Specifications (TS) for the San Onofre Nuclear Generating Station, Units 2 and 3 (SONGS 2 and 3), respectively. The amendment requests included a change on page 5.0-19c of the Technical Specifications (TS) for SONGS 2 and 3 to delete the Fuel Handling Building Post-Accident Cleanup Filter Systems from the Ventilation Filter Testing Program.

P.O. Box 128 San Clemente, CA 92674-0128 949-368-9275 Fax 949-368-9881

,A~oc4

Qocument Control Desk November 30, 2006 By Reference 2, the NRC issued Amendments 204 and 196 to the facility operating licenses for SONGS 2 and 3, respectively. These amendments made additional changes to TS pages 5.0-19c and renumbered the pages 5.0-17.

In order to incorporate the changes of Amendments 204 and 196 to newly-numbered pages 5.0-17, SCE is hereby submitting Supplement 1 to our December 6, 2005 request. The revision to these pages is administrative. Supplement 1 does not affect the no significant hazards consideration or the environmental consideration of our December 6, 2005 submittal.

If you have any questions or require further information on this matter, please contact Ms. Lynn Pressey at 949-368-6351.

Sincerely, (5(LuAl Z

Enclosures:

1. Notarized affidavit
2. Revised Technical Specification pages Attachment A, Proposed Technical Specification Page, Unit 2 Attachment B, Proposed Technical Specification Page, Unit 3 cc:

B. S. Mallett, Regional Administrator, NRC Region IV, N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3 S. Y. Hsu, California Department of Health Services, Radiologic Health Branch Page 1 of 2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON COMPANY, ET AL. for a Class 103 License to Acquire, Possess, and Use A Utilization Facility as Part of Unit No. 2 of the San Onofre Nuclear Generating Station

)

)

)

Docket No. 50-361 Amendment Application No. 239 Supplement 1 SOUTHERN CALIFORNIA EDISON COMPANY, et al. pursuant to 10CFR50.90, hereby submit Supplement 1 to Amendment Application No. 239. This amendment application consists of Proposed Change Number (PCN) 521 to Facility Operating License NPF-10. Supplement 1 to PCN-521 transmits revised Technical Specification page 5.0-17.

State of California County of San Diego Brian Katz, Vice PresideW Subscribed and sworn to (or--ff-iaed) before me on this 3 0 "Hkday of

,ocV ei-be v-

, 2006, by-fVYlo~y k'ckcI-personally known to me e

d-t, me on the basi3 of zatisfactory evidenc to be the person who appeared before me.

Notary Public DAYM A. MMEMLL T;;t'7a'CAxwvdWw, # 1623106 NOWY PJWC - camwft L4 sm 01W CCU*

MVMvONM04:11 -NW2M Page 2 of 2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON COMPANY, ET AL. for a Class 103 License to Acquire, Possess, and Use A Utilization Facility as Part of Unit No. 3 of the San Onofre Nuclear Generating Station

))

)

)

Docket No. 50-362 Amendment Application No. 223 Supplement 1 SOUTHERN CALIFORNIA EDISON COMPANY, et al. pursuant to 10CFR50.90, hereby submit Supplement 1 to Amendment Application No. 223. This amendment application consists of Proposed Change Number (PCN) 521 to Facility Operating License NPF-15. Supplement 1 to PCN-521 transmits revised Technical Specification page 5.0-17.

State of California County of San Diego Brian Katz, Vice Presket Subscribed and sworn to (&r-a e

before me on this 3 day of tlJo Vifeiber, 2006, personally known to me oF provcd ta ma on-thc ba-k of s"i acor.......

to be the person who appeared before me.

Notary Public Cacmmbulo # 14623105 A.ROM

ENCLOSURE 2 ATTACHMENT A PCN-521 SUPPLEMENT 1 Revised Technical Specification page 5.0-17 Unit 2

Procedures,

Programs, and Manuals 5.5 5.5 Procedures,
Programs, and Manuals (continued) 5.5.2.12 Ventilation Filter Testing Program (VFTP)

This Program establishes the required testing of the Engineered Safety Feature filter ventilation system "Control Room Emergency Air Cleanup System."

The frequency of testing shall be in accordance with Regulatory Guide 1.52, Revision 2.

As a minimum the VFTP program shall include the following:

a.

Inplace testing of the high efficiency particulate air (HEPA) filters to demonstrate acceptable penetration and system bypass when tested at the appropriate system flowrate in accordance with Regulatory Guide 1.52, Revision 2, and ANSI N510-1975 (see Note 1); and

b.

Inplace testing of the charcoal adsorber to demonstrate acceptable penetration and system bypass when tested at the appropriate system flowrate in accordance with Regulatory Guide 1.52, Revision 2, and ANSI N510-1975 (see Note 1); and

c.

Laboratory testing of charcoal adsorber samples obtained in accordance with Regulatory Guide 1.52, Revision 2 and tested per the methodology of ASTM D3803-1989 at 30'C and 70%

relative humidity to show acceptable methyl iodide penetration; and

d.

Testing to demonstrate the pressure drop across the combined HEPA filters, the prefilters, and the charcoal adsorbers, when tested at the appropriate system flowrate.

Note 1:

Sample and injection points shall be qualified per ANSI N510-1975 unless manifolds have been qualified per ASME N510-1989.

HEPA testing will be conducted with DOP aerosol or suitable alternate.

(continued)

SAN ONOFRE--UNIT 2 5.0-17 Amendment No.

ENCLOSURE 2 ATTACHMENT B PCN-521 SUPPLEMENT 1 Revised Technical Specification page 5.0-17 Unit 3

Procedures,

Programs, and Manuals 5.5 5.5 Procedures, Programs, and Manuals (continued) 5.5.2.12 Ventilation Filter Testing Program (VFTP)

This Program establishes the required testing of the Engineered Safety Feature filter ventilation system "Control Room Emergency Air Cleanup System."

The frequency of testing shall be in accordance with Regulatory Guide 1.52, Revision 2.

As a minimum the VFTP program shall include the following:

a.

Inplace testing of the high efficiency particulate air (HEPA) filters to demonstrate acceptable penetration and system bypass when tested at the appropriate system flowrate in accordance with Regulatory Guide 1.52, Revision 2, and ANSI N510-1975 (see Note 1); and

b.

Inplace testing of the charcoal adsorber to demonstrate acceptable penetration and system bypass when tested at the appropriate system flowrate in accordance with Regulatory Guide 1.52, Revision 2, and ANSI N510-1975 (see Note 1); and

c.

Laboratory testing of charcoal adsorber samples obtained in accordance with Regulatory Guide 1.52, Revision 2 and tested per the methodology of ASTM D3803-1989 at 30'C and 70%

relative humidity to show acceptable methyl iodide penetration; and

d.

Testing to demonstrate the pressure drop across the combined HEPA filters, the prefilters, and the charcoal adsorbers, when tested at the appropriate system flowrate.

Note 1:

Sample and injection points shall be qualified per ANSI N510-1975 unless manifolds have been qualified per ASME N510-1989.

HEPA testing will be conducted with DOP aerosol or suitable alternate.

(continued)

SAN ONOFRE--UNIT 3 5.0-17 Amendment No.