December 1, 2006 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097
SUBJECT:
RESPONSE TO PERRY NUCLEAR POWER PLANT PERFORMANCE INDICATOR MID-QUARTER CORRECTION SUBMITTAL
Dear Mr. Pearce:
On November 29, 2006, the NRC staff received your letter dated November 28, 2006, which informed us that First Energy Nuclear Operating Company submitted a mid-quarter correction of the Perry Nuclear Power Plant NRC Performance Indicator (PI) data files for the second and third quarters of 2006. In your letter, you informed us that the correction was due to a revision to your Probabilistic Risk Analysis data to correct an error in your previous calculations. Your letter also informed us that as a result of this correction, the second quarter 2006 PI for Emergency AC Power that was originally categorized as Green was re-categorized as White, but returned to Green in the third quarter of 2006.
In response to this correction and the identification of a White PI in the Emergency AC Power area, we plan to conduct Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. This inspection procedure is conducted to provide assurance that the root cause(s) and contributing cause(s) of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence. The IP 95001 inspection will be conducted in addition to the baseline inspections currently scheduled. Based on information provided in your letter, as well as communications between your Perry Regulatory Assurance staff and our Perry Resident Inspection staff, we expect your corrective actions to be sufficiently complete to support this inspection during the first week of January 2007.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
L. Pearce If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan, Chief, Reactor Projects Branch 6 at (630) 829-9628 with any questions you may have regarding this letter.
Sincerely,
/RA/
Mark A. Satorius, Director Division of Reactor Projects Docket No. 50-440 License No. NPF-58 cc:
G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
L. Pearce If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan, Chief, Reactor Projects Branch 6 at (630) 829-9628 with any questions you may have regarding this letter.
Sincerely, Mark A. Satorius, Director Division of Reactor Projects Docket No. 50-440 License No. NPF-58 cc:
G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOCUMENT NAME:C:\\FileNet\\ML063380306.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N
N NAME EDuncan MSatorius DATE 11/30/06 12/01/06 OFFICIAL RECORD COPY
L. Pearce DISTRIBUTION:
DXC1 TEB SJC4 RidsNrrDirsIrib GEG KGO GLS MEF1 DRPIII DRSIII PLB1 TXN