ML063340592

From kanterella
Jump to navigation Jump to search
PSEG Letter Regarding the Status of Safety Conscious Work Environment Commitments at Salem and Hope Creek Generating Stations
ML063340592
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 11/29/2006
From: David Lew
Division Reactor Projects I
To: Levis W
Public Service Enterprise Group
Gray M, RI/DRP/Br3 610-337-5209
References
Download: ML063340592 (3)


Text

November 29, 2006 Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

PSEG LETTER REGARDING THE STATUS OF SAFETY CONSCIOUS WORK ENVIRONMENT COMMITMENTS AT SALEM AND HOPE CREEK GENERATING STATIONS

Dear Mr. Levis:

This letter acknowledges receipt of your letter dated October 31, 2006, which provided the status of PSEG's commitments to the NRC regarding the safety conscious work environment at the Salem and Hope Creek Generating Stations. In your letter, you listed your commitments and stated that you considered all of them completed, with the exception of an action to periodically perform cultural surveys to monitor the work environment at the stations until February 28, 2009.

My staff reviewed your commitments described in PSEG's letter to the NRC, dated June 25, 2004, [ML041810062] and the NRC's letter to PSEG, dated July 30, 2004,

[ML042120284]. We independently concluded that your commitments, with the exception of the periodic cultural surveys described above, have been completed. The NRC verified completion of your commitments through inspection activities, document reviews, and public meetings between the NRC and PSEG. With the exception of the periodic cultural surveys to be performed through February 2009, we consider these commitments to be closed.

As previously stated in our mid-cycle performance review letters dated August 31, 2006

[ML062430651 and ML062430643], we will continue to monitor your progress in improving the work environment at the stations through normal Reactor Oversight Process baseline inspections. For example, we plan to review corrective or improvement actions you may take in response to your periodic cultural survey results through biennial problem identification and resolution inspections.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Mr. W. Levis 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David C. Lew, Director Division of Reactor Projects Docket No: 50-272, 50-311, 50-354 License No: DPR-70, DPR-75, NPF-57 cc:

G. Barnes, Site Vice President T. Joyce, Site Vice President - Salem D. Winchester, Vice President - Nuclear Assessments W. F. Sperry, Director - Business Support M. Massaro, Hope Creek Plant Manager C. J. Fricker, Salem Plant Manager J. J. Keenan, General Solicitor, PSEG M. Wetterhahn, Winston and Strawn, LLP Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania L. A. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director of Radiation Protection and Release Prevention, State of New Jersey K. Tosch, Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection H. Otto, Ph.D., Administrator, Interagency Programs, DNREC Division of Water Resources, State of Delaware N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance

Mr. W. Levis 3 Distribution:

S. Collins, RA M. Dapas, DRA R. Blough, DRS M. Gamberoni, DRS D. Lew, DRP J. Clifford, DRP M. Gray, DRP B. Welling, DRP G. Malone, DRP, Senior Resident Inspector D. Schroeder, DRP, Senior Resident Inspector K. Venuto, DRP, Resident OA Region I Docket Room (with concurrences)

DOCUMENT NAME: C:\FileNet\ML063340592.wpd SUNSI Review Complete: MKG (Reviewers Initials)

After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME BWelling/BDW MGray/MKG DLew/DCL DATE 11/07/06 11/14/06 11/29/06 OFFICIAL RECORD COPY