L-2006-213, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from ML063250350)
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML063250350
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/09/2006
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2006-213, RIS-06-015
Download: ML063250350 (2)


Text

0 FPL

.. V 0 9 20N6 L-2006-213 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2006-15, "Preparation and Scheduling of Operator Licensing Examinations," issued August 14, 2006, enclosed find the Operator Licensing Examination data, NRC Form 536, for Turkey Point Nuclear Plant.

Should there be any questions, please contact Greg Laughlin at (305) 246-6274.

Very truly yours, Terry 0. Jones Vice President Turkey Point Nuclear Plant Enclosure SM cc: Regional Administrator, Region HI,USNRC Senior Resident Inspector, USNRC, Turkey Point Plant K 005 an FPL Group company

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53). U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001. or by interne e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. if a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Florida Power and Light Company Turkey Point Units 3 and 4 Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 6 12 16 16 OPERATORS NUMBER OF SENIOR REACTOR 6 6 8 8

.OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 04/23/2007 11/10/2008 10/06/2009 ALTERNATE DATE 05/07/2007 12/01/2008 11/03/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSEDJU NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 25 25 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER