|
---|
Category:License-Operator
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] |
Text
November 15,2006 Mr. Kelly Clayton USNRC Region IV Texas Health Resources Tower 61 1 Ryan Plaza, Suite ## 400 Arlington, TX 776011-4005
Dear Mr. Clayton:
This letter is to inform you that for the 2006 NRC initial license exam our position is to not challenge any part of the exam as provided by NUREG 1021.
Please contact me at (949) 368-8362 with any questions.
Alan Hagemeyer Supervisor Operator Licensing San Onofre Nuclear Generating Station
Subtesr Class Report On 5 X C l Instructor: Hampron Desc;iption:
TennFear:
Overall Subtest Criteria Must pass our o f f suoiests Records Based on 'ieid Conienrs 411 Siuaentr Toral No. of Student: 15 Subtesr Name. RC SRS
\o oflterns 75 25 Possible Poinrs: 1 75 00 25.00 h4inlmUm Yo to ?ass. 1 80.00% 1Q ,.our, Required to Pass:
Average 9%.
I I
YF?s 67 47%
Yes 8 3.y%
fiighes YO: I 9T.33% 92.000;.
Lowes; ",o: I 76.00% 1 c P 0%
I I I I I
~-
7 I j j 68.00 j 90.674', j 22.00 1 88.00% 1 2 i 1 I 1 i I Page 1 11/03/06
~~ ~ __
Roster Report O n -4Jl Test Categories c
Page 1 11/03/06
i I
I I
I 1 l i I
I
- I -
i I
- - . I -
-' I -
C 11 Y
1
I 01 I I 1 1 I 10 11 101- It. 0 100 / %ooos 1 %OO si j%LO 99 1 s I a3vl I I I 1 I Io lo istz IO I 0 loo0 I 9/,00001 I %00001 1%00001 I E I awl I I i I I lo !si= Io lo i 3 I 00'0 I %OO~OOi. I %00'001 j%00~001 ~ 5
90/EO/ i L a6ed I
I a1 I I I I I lo Ip. lot- ~t I 9 I zs.0 I Yo00 sz I Yo00 001 '%L9.99 I I I 2vl I 1 I I I ltrt, lo It Io I C 1 ii 0 1 %OO 001 I YoOO'OOL /'%&E E6 I E h
i ai I I I I ! IO IZL/Z It I u I avo j ?~OO'QS 1 o/oo~oot I?~OO'ORi zt
90/EO/ 1L E aBed I j sm'p I eavl I I i I I /o iL lo I0 I si t i I %00.0 I %GO OOL l?~o/oiO.3P1 8E I aal I I I I I IO /E lo IP, I V I zzz I %OO'O i %OO.SL I%L9'9Z ~ 16
3 The question asks the examinee to identify the alignment of the shutdown cooling purification system. The correct answer identifies that purification comes from upstream of the letdown heat exchanger. The distracters that were chosen by 9 of the 15 examinees identifies incorrectly that the purification comes from downstream of the letdown heat exchanger, which is incorrect. The distracter chosen by 6 of those 9 examinees also identified that the flow was controlled by the letdown flow control valves. In the shutdown condition the flow is controlled by the backpressure control valves.
38 This question challenged the examinees to determine the operation of the waste gas system with off normal conditions. The examinees are to answer the questions by knowing setpoints of the waste gas compressors and operational characteristics of the waste gas surge tank pressure control valve. Due to the even spread of the answers by the candidates it is apparent that a fundamental lack of knowledge of system operating characteristics exists.
70 Identification of proper actions is required to stabilize power when a positive iTC exists. In this condition the correct method is to move CEAs to stabilize reactor power. The distractor chosen by 6 of the 15 examinees was to increase steaming to stabilize reactor power from rising. This would be an incorrect action due to the adverse affect on other plant parameters.
79 On a loss of a vital inverter the candidate is tasked with determining the tech spec time limit for return to service. A general feeling by the examinees, 6 of the 7 SROs, was that this type of action would require a 1 hr time limit for return to service of the bus. In actuality the tech specs give 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for powering the bus from the alternate power supply which accommodates the time necessary to transfer power supplies but is timely enough for the RTS of such a vital piece of equipment.
96 Administrative question inquiring as to the requirements for 1OCRF50.59 screening pertaining to procedure change which will result in performance NOT in accordance with the UFSAR. Students selected all four options which indicated weakness in this area by all students. The requirement for this situation is to perform satisfactory completion of a 10CFR50.59 evaluation without contacting the NRC. Contacting the NRC is not required for this instance and is stated so in SONGS admin procedures.