(Fnp) Units 1 and 2 - Administrative Change to Facility Operating License. Revisions to Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan
ML063110486
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/30/2007
From: Cotton K
NRC/NRR/ADRO/DORL/LPLII-1
To: Sumner H
Southern Nuclear Operating Co
Cotton K R, NRR/DORL, 301-415-1438
Shared Package
ML063120231 List:
References
TAC MD2224, TAC MD2225
Download: ML063110486 (6)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION May 30, 2007 Mr. H. L. Sumner Vice President - Farley Project Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT (FNP), UNITS 1 AND 2 -

ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE NOS.

NPF-2 AND NPF-8 IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS. MD2224 AND MD2225)

Dear Mr. Sumner:

By letter to the Nuclear Regulatory Commission (NRC) dated May 15, 2006, Southern Nuclear Company (SNC), submitted its revised plans and confirmed the full implementation at FNP of Order EA-06-037 regarding an updated adversary characteristic of the design basis threat (DBT).

The NRC staff has completed its review of the changes related to implementation of Order EA-06-037. As discussed in the enclosed safeguards evaluation (Enclosure 2), the NRC staff has determined that SNCs changes to the security plans meet the requirements of the NRC Order and Title 10 of the Code of Federal Regulation (10 CFR) Part 73 requirements and are, therefore, acceptable. The effectiveness of these security provisions will continue to be the subject of NRC review and inspection.

Consistent with the Order, an administrative license change is being made to Facility Operating License Nos. NPF-2 and NPF-8 to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I. Please replace Page 5 of the FNP Facility Operating Licenses NPF-2 and NPF-8 with the enclosed pages (Enclosure 1). Enclosure 2 to this letter is designated exempt from public disclosure under 10 CFR 2.390(d)(l).

NOTICE: Enclosure 2 contains Security-Related Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION H. Sumner If you have any questions, please contact me at (301) 415-1438.

Sincerely,

/RA/

Karen Cotton, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosures:

1. Revised Page 5 of License Nos. NPF-2 and NPF-8
2. Safeguards Evaluation cc w/encls 1 and 2: L. Hogg, Site Security Manager, S. Shaeffer, Region II cc w/encl 1 only: See next page OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

- Package: ML063120231 ADAMS Accession No. - Letter and Enclosure 1: ML063110486 ADAMS Accession No. - Enclosure 2: ML063120125 OFFICE NRR/LPL2-1/PM NRR/LPLI-1/LA DSP/RSB DSP/RSB NSIR/RSB/BC LPL2-1/BC NAME K. Cotton S. Little D. Cardenas A. Frazier S. Morris E. Marinos DATE 5/30/07 5/30/07 5/21/07 5/21/07 5/21/07 5/30/07

6. A procedure identifying the authority responsible for the interpretation of the data and the sequence and timing of administrative events required to initiate corrective action.

(h) The Additional Conditions contained in Appendix C, as revised through Amendment No. 146, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the additional conditions.

(i) Deleted per Amendment 152 (4) Fire Protection Southern Nuclear shall implement and maintain in effect all provisions of the approved fire protection program as described on the Final Safety Analysis Report for the facility, which implements the fire protection requirements of 10 CFR 50.48 and 10 CFR 50 Appendix R. Southern Nuclear may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown.

D. Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, submitted May 15, 2006.

E. This license is subject to the following additional conditions for the protection of the environment:

(1) Southern Nuclear shall operate the facility within applicable Federal and State air and water quality standards and the Environmental Technical Specifications which include nonradiological and radiological monitoring programs, limits on effluent releases, and appropriate comprehensive ecological surveillance study, and reporting requirements.

Farley - Unit 1 Revised by letter dated October 29, 2004 Revised by letter dated May 30, 2007

(22) Additional Conditions The Additional conditions contained in Appendix C, as revised through Amendment No. 137, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the additional conditions.

D. Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, submitted May 15, 2006.

E. Deleted per Amendment 144 F. Alabama Power Company shall meet the following antitrust conditions:

(1) Alabama Power Company shall recognize and accord to Alabama Electric Cooperative (AEC) the status of a competing electric utility in central and southern Alabama.

(2) Alabama Power Company shall offer to sell to AEC an undivided ownership interest in Units 1 and 2 of the Farley Nuclear Plant. The percentage of ownership interest to be so offered shall be an amount based on the relative sizes of the respective peak loads of AEC and Alabama Power Company (excluding from the Alabama Power Company's peak load that amount imposed by members of AEC upon the electric system of Alabama Power Company) occurring in 1976. The price to be paid by AEC for its proportionate share of Units 1 and 2, determined in accordance with the foregoing formula, will be established by the parties through good faith negotiations. The price shall be sufficient to fairly reimburse Alabama Power Company for the proportionate share of its total costs related to the Units 1 and 2 including, but not limited to, all costs of construction, installation, ownership and licensing, as of a date, to be agreed to by the two parties, which fairly accommodates both their respective interests. The offer by Alabama Power Company to sell an undivided ownership interest in Units 1 and 2 may be conditioned, at Alabama Power Company's option, on the agreement by AEC to waive any right of partition of the Farley Plant and to avoid interference in the day-to-day operation of the plant.

Farley - Unit 2 Revised by letter dated October 29, 2006 Revised by letter dated May 30, 2007

Joseph M. Farley Nuclear Plant, Units 1 & 2 cc w/o encl 2:

Mr. J. R. Johnson General Manager Southern Nuclear Operating Company, Inc.

P.O. Box 470 Ashford, AL 36312 Mr. B. D. McKinney, Licensing Manager Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm P.O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Mr. J. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201 State Health Officer Alabama Department of Public Health 434 Monroe St.

Montgomery, AL 36130-1701 Chairman Houston County Commission P.O. Box 6406 Dothan, AL 36302 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company, Inc.

P.O. Box 470 Ashford, AL 36312 Monticello Nuclear Generating Plant