Letter Sequence Other |
---|
|
|
MONTHYEARML0607605322006-03-0707 March 2006 Technical Specification Change of Interlock for a Reactor Trip on Turbine Trip Project stage: Other ML0608306282006-03-31031 March 2006 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0615202802006-06-0101 June 2006 DC Cook, RAI, Shifting the Reactor Trip on Turbine Trip Interlock from P-7 to P-8 Project stage: RAI ML0615200982006-06-0101 June 2006 Draft RAI Cook Proposed Amendment, P-7 to P-8 Project stage: Draft RAI ML0628401622006-10-30030 October 2006 License Amendments 297 and 278 Regarding Reactor Trip System Instrumentation Project stage: Other ML0630500862006-10-30030 October 2006 Tech Spec Pages for Amendments 297 and 278 Regarding Reactor Trip System Instrumentation Project stage: Other ML0714200712007-05-11011 May 2007 Technical Specification Change of Conditional Surveillance Frequency Project stage: Other 2006-03-07
[Table View] |
Similar Documents at Cook |
---|
Category:Technical Specification
MONTHYEARAEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22340A1602022-11-30030 November 2022 Technical Specifications Bases, List of Effective Pages ML22340A2022022-11-30030 November 2022 Technical Specifications Bases, List of Effective Pages AEP-NRC-2022-05, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-04-0707 April 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements AEP-NRC-2021-24, Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation2021-03-23023 March 2021 Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation AEP-NRC-2020-72, License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-12-14014 December 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-61, Unit 2, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable2020-10-27027 October 2020 Unit 2, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML20164A0452020-06-0808 June 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-10, Unit 2, Application to Revise Technical Specification to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2020-04-30030 April 2020 Unit 2, Application to Revise Technical Specification to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position AEP-NRC-2020-33, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues2020-04-30030 April 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues ML20126G4552020-04-30030 April 2020 Application to Revise Technical Specifications to Adopt Tstf-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position AEP-NRC-2020-09, Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable2020-04-0707 April 2020 Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable AEP-NRC-2020-01, License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System2020-04-0707 April 2020 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2019-39, Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition.2019-10-31031 October 2019 Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition. AEP-NRC-2019-33, Application to Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with TSTF-4212019-08-27027 August 2019 Application to Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with TSTF-421 AEP-NRC-2019-18, License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor Bank2019-06-27027 June 2019 License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor Bank AEP-NRC-2019-01, Application to Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2019-02-26026 February 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. AEP-NRC-2018-66, Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology2018-11-20020 November 2018 Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology AEP-NRC-2018-26, Application to Revise Technical Specifications to Adopt TFTF-529, Revision 4, Clarify and Use Application Rule2018-05-0404 May 2018 Application to Revise Technical Specifications to Adopt TFTF-529, Revision 4, Clarify and Use Application Rule ML16355A0992016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Unit 1 - Technical Specification (TS) Bases Update Summary AEP-NRC-2016-78, Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and ..2016-09-15015 September 2016 Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and .. AEP-NRC-2016-29, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 and to Request an Alternative to the ASME Code2016-07-21021 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 and to Request an Alternative to the ASME Code AEP-NRC-2016-07, License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force-523, Generic Letter 2008-01, Managing Gas Accumulation.2016-01-29029 January 2016 License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force-523, Generic Letter 2008-01, Managing Gas Accumulation. AEP-NRC-2016-09, Correction of Technical Specification Typographical Error2016-01-15015 January 2016 Correction of Technical Specification Typographical Error ML15328A4522015-11-19019 November 2015 Enclosures 6 - 11: CNP Units 1 & 2 TS Bases, TSTF-425 Versus CNP TS Cross-Reference, Proposed No Significance Hazards Consideration, Proposed Inserts and Regulatory Commitments AEP-NRC-2014-70, License Amendment Request Regarding Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.152014-12-17017 December 2014 License Amendment Request Regarding Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 AEP-NRC-2010-12, Exigent License Amendment Request Regarding Containment Distributed Ignition System2010-01-24024 January 2010 Exigent License Amendment Request Regarding Containment Distributed Ignition System AEP-NRC-2009-45, License Amendment Request for One-Time Extension of Technical Specification Completion Times for Inoperable Train of Reactor Trip System and Engineered Safety Feature Actuation System2009-07-17017 July 2009 License Amendment Request for One-Time Extension of Technical Specification Completion Times for Inoperable Train of Reactor Trip System and Engineered Safety Feature Actuation System AEP-NRC-2009-18, License Amendment Request for Adoption TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-19019 March 2009 License Amendment Request for Adoption TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0805303952008-02-13013 February 2008 Response to Request for Additional Information Regarding Proposed Amendment to Reduce Maximum Ventilation System Filter Pressure Drop ML0719103542007-06-27027 June 2007 Donald C. Cook, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Associated with Generic Letter 2004-02 ML0717300472007-06-13013 June 2007 License Amendment Request to Reduce Maximum Ventilation System Hepa/Charcoal Pressure Drop Allowed by Technical Specifications ML0630500862006-10-30030 October 2006 Tech Spec Pages for Amendments 297 and 278 Regarding Reactor Trip System Instrumentation ML0626905002006-09-15015 September 2006 Technical Specification Change for Reactor Trip on Low Turbine Oil Pressure ML0627103092006-09-15015 September 2006 Technical Specification Change to Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation ML0615701572006-05-26026 May 2006 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0607605322006-03-0707 March 2006 Technical Specification Change of Interlock for a Reactor Trip on Turbine Trip ML0522803072005-08-0505 August 2005 Correction of Administrative Error for Improved Technical Specifications ML0405505362004-02-14014 February 2004 Application for Amendment to Delete Surveillance Requirements for Power Range, Intermediate Range, and Source Range Neutron Flux Monitors ML0405505612004-02-14014 February 2004 Application for Amendment to Technical Specifications Regarding Containment Requirements During Movement of Recently Irradiated Fuel Assemblies ML0325108672003-08-27027 August 2003 License Amendment Request to Revise Technical Specification 4.0.3: Missed Surveillance Time Allowance ML0319704522003-07-0202 July 2003 Supplement to License Amendment Request for Removal of Obsolete And/Or Expired License Conditions from the Unit 1 and Unit 2 Operating Licenses, Editorial Changes to the Unit 1 and Unit 2 Operating Licenses, and Administrative Changes.... ML0234604582002-12-10010 December 2002 License Amendment Request for Unit 1 Reactor Coolant System Pressure - Temperature Curves, & Request for Exemption from Requirements in 10 CFR 50.60(a) & 10 CFR 50, Appendix G ML0224901272002-08-30030 August 2002 License Amendment Request to Extend Reactor Trip System & Engineered Safety Features Actuation System Surveillance Time Requirements as Evaluated in WCAP-15376 ML0201702612002-01-16016 January 2002 Technical Specifications Amendments 261 & 244 Deleting TS 6.8.3 Requiring a Program for Post Accident Sampling ML0726900832001-09-21021 September 2001 Tech Spec Page for Amendment 281 Regarding Reactor Trip on Low Turbine Oil Pressure 2023-01-26
[Table view] Category:Amendment
MONTHYEARAEP-NRC-2021-24, Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation2021-03-23023 March 2021 Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation AEP-NRC-2020-72, License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-12-14014 December 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency ML20164A0452020-06-0808 June 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-33, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues2020-04-30030 April 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues AEP-NRC-2019-39, Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition.2019-10-31031 October 2019 Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition. AEP-NRC-2019-33, Application to Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with TSTF-4212019-08-27027 August 2019 Application to Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with TSTF-421 AEP-NRC-2018-66, Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology2018-11-20020 November 2018 Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology AEP-NRC-2018-26, Application to Revise Technical Specifications to Adopt TFTF-529, Revision 4, Clarify and Use Application Rule2018-05-0404 May 2018 Application to Revise Technical Specifications to Adopt TFTF-529, Revision 4, Clarify and Use Application Rule AEP-NRC-2016-78, Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and ..2016-09-15015 September 2016 Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and .. AEP-NRC-2010-12, Exigent License Amendment Request Regarding Containment Distributed Ignition System2010-01-24024 January 2010 Exigent License Amendment Request Regarding Containment Distributed Ignition System AEP-NRC-2009-45, License Amendment Request for One-Time Extension of Technical Specification Completion Times for Inoperable Train of Reactor Trip System and Engineered Safety Feature Actuation System2009-07-17017 July 2009 License Amendment Request for One-Time Extension of Technical Specification Completion Times for Inoperable Train of Reactor Trip System and Engineered Safety Feature Actuation System AEP-NRC-2009-18, License Amendment Request for Adoption TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-19019 March 2009 License Amendment Request for Adoption TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0805303952008-02-13013 February 2008 Response to Request for Additional Information Regarding Proposed Amendment to Reduce Maximum Ventilation System Filter Pressure Drop ML0719103542007-06-27027 June 2007 Donald C. Cook, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Associated with Generic Letter 2004-02 ML0630500862006-10-30030 October 2006 Tech Spec Pages for Amendments 297 and 278 Regarding Reactor Trip System Instrumentation ML0626905002006-09-15015 September 2006 Technical Specification Change for Reactor Trip on Low Turbine Oil Pressure ML0627103092006-09-15015 September 2006 Technical Specification Change to Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation ML0615701572006-05-26026 May 2006 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0522803072005-08-0505 August 2005 Correction of Administrative Error for Improved Technical Specifications ML0405505612004-02-14014 February 2004 Application for Amendment to Technical Specifications Regarding Containment Requirements During Movement of Recently Irradiated Fuel Assemblies ML0405505362004-02-14014 February 2004 Application for Amendment to Delete Surveillance Requirements for Power Range, Intermediate Range, and Source Range Neutron Flux Monitors ML0325108672003-08-27027 August 2003 License Amendment Request to Revise Technical Specification 4.0.3: Missed Surveillance Time Allowance ML0319704522003-07-0202 July 2003 Supplement to License Amendment Request for Removal of Obsolete And/Or Expired License Conditions from the Unit 1 and Unit 2 Operating Licenses, Editorial Changes to the Unit 1 and Unit 2 Operating Licenses, and Administrative Changes.... ML0234604582002-12-10010 December 2002 License Amendment Request for Unit 1 Reactor Coolant System Pressure - Temperature Curves, & Request for Exemption from Requirements in 10 CFR 50.60(a) & 10 CFR 50, Appendix G ML0224901272002-08-30030 August 2002 License Amendment Request to Extend Reactor Trip System & Engineered Safety Features Actuation System Surveillance Time Requirements as Evaluated in WCAP-15376 ML0201702612002-01-16016 January 2002 Technical Specifications Amendments 261 & 244 Deleting TS 6.8.3 Requiring a Program for Post Accident Sampling ML0726900832001-09-21021 September 2001 Tech Spec Page for Amendment 281 Regarding Reactor Trip on Low Turbine Oil Pressure 2021-03-23
[Table view] |
Text
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION, REQUIRED ACTION COMPLETION TIME J. One train inoperable. J.1 ---------- NOTE-------
One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing, provided the other train is OPERABLE.
Restore train to OPERABLE 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> status.
K. One RTB train K.1 ----------- NOTE -------
inoperable. One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing, provided the other train is OPERABLE.
Restore train to OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> status.
L. One or more channels L.1 Verify interlock is in required 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, state for existing unit conditions.
M. One trip mechanism M.1 Restore inoperable trip 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable for one RTB. mechanism to OPERABLE status.
N. Required Action and N.1 Reduce THERMAL POWER 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion to < P-7.
Time of Condition D not met for Function 8.a, 9, 10, 11, 12, or 13.
Cook Nuclear Plant Unit 1 3.3.1-4 Amendment No. 29;, 297
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
- 0. Required Action and 0.1 Reduce THERMAL POWER 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion to < P-8.
Time of Condition D not met for Function 16.a or 16.b.
P. Required Action and P.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.
Q. Required Action and Q.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.
OR Required Action and associated Completion Time of Condition C not met.
OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3.a, 3.b, 6, 7, 8.b, 14, or 15.
OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.
Cook Nuclear Plant Unit 1 3.3.1-5 Amendment No. 24ý7, 297
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME R. Required Action and R.1 Initiate action to fully insert Immediately associated Completion all rods.
Time of Condition B not met in MODE 3, 4, or 5. AND OR R.2 Place the Rod Control 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> System in a condition Required Action and incapable of rod withdrawal.
associated Completion Time of Condition L not met in MODE 3, 4, or 5 for Function 18.a.
OR Required Action and associated Completion Time of Condition I not met.
SURVEILLANCE REQUIREMENTS
NOTE ----------------------------------------------------------
Refer to Table 3.3.1-1 to determine which SRs apply for each RTS Function.
SURVEILLANCE FREQUENCY SR 3.3.1.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Cook Nuclear Plant Unit 1 3.3.1-6 Amendment No. 2-97-, 297
RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 3 of 6)
Reactor Trip System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS ALLOWABLE VALUE
- 15. SG Water Level - Low 1,2 2 D(f) SR 3.3.1.1 >9.7%
(per SG) SR 3.3.1.11 SR 3.3.1.13 Coincident with Steam 1,2 2 D(f) SR 3.3.1.1 5 0.73E6 lb/hr Flow/Feedwater Flow SR 3.3.1.11 steam flow at RTP Mismatch (per SG) SR 3.3.1.13
- 16. Turbine Trip
- a. Low Fluid Oil Pressure 1 (h) 3 D SR 3.3.1.13 ->750 psig SR 3.3.1.18
- b. Turbine Stop Valve 1 (h) 4 D SR 3.3.1.13 > 1% open Closure (per train) SR 3.3.1.18
- 17. Safety Injection (SI) Input 1,2 2 trains J SR 3.3.1.6 NA from Engineered Safety SR 3.3.1.19 Feature Actuation System (ESFAS)
- 18. Reactor Trip System Interlocks
- a. Intermediate Range 2 (d), 3(a), 4(a), 5(a) 2 L SR 3.3.1.14 >6E-1 1 amp Neutron Flux, P-6 SR 3.3.1.16
- b. Low Power Reactor 1 1 per train L SR 3.3.1.5 NA Trips Block, P-7
- c. Power Range Neutron 1 4 L SR 3.3.1.14 <31% RTP Flux, P-8 SR 3.3.1.16
- d. Power Range Neutron 1,2 4 L SR 3.3.1.14 > 9% RTP and Flux, P-10 SR 3.3.1.16 < 11% RTP
- e. Turbine First Stage 1 2 L SR 3.3.1.1 < 37 psig Pressure, P-13 SR 3.3.1.13 SR 3.3.1.16 (a) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
(d) Below the P-6 (Intermediate Range Neutron Flux) interlock.
(f) Separate condition entry is allowed per SG for only 1 of the 4 total Reactor Trip System Instrumentation Function 15 channels inoperable on each SG (i.e., for only 1 of 2 SG Water Level - Low channels or 1 of 2 Steam Flow/Feedwater Flow Mismatch channels inoperable on each SG). Any combination of 2 or more inoperable Reactor Trip System Instrumentation Function 15 channels on any SG requires immediate entry into LCO 3.0.3.
(h) Above the P-8 (Power Range Neutron Flux) Interlock.
Cook Nuclear Plant Unit 1 3.3.1-13 Amendment No. 297-, 297
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME J. One train inoperable. J.1 ---------- NOTE --------------
One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing, provided the other train is OPERABLE.
Restore train to OPERABLE 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> status.
K. One RTB train K.1 ----------- NOTE -------
inoperable. One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing, provided the other train is OPERABLE.
Restore train to OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> status.
L. One or more channels L.1 Verify interlock is in required 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, state for existing unit conditions.
M. One trip mechanism M.1 Restore inoperable trip 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable for one RTB. mechanism to OPERABLE status.
N. Required Action and N.1 Reduce THERMAL POWER 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion to < P-7.
Time of Condition D not met for Function 8.a, 9, 10, 11, 12, or 13. I Cook Nuclear Plant Unit 2 3.3.1-4 Amendment No. 2-6.9, 278
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
- 0. Required Action and 0.1 Reduce THERMAL POWER 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion to < P-8.
Time of Condition D not met for Function 16.a or 16.b.
P. Required Action and P.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.
Q. Required Action and Q.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.
OR Required Action and associated Completion Time of Condition C not met.
OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3.a, 3.b, 6, 7, 8.b, 14, or 15.
OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.
Cook Nuclear Plant Unit 2 3.3.1-5 Amendment No. 26-9, 278
RTS Instrumentation 3.3.1
^CT-.- (continued)
CONDITION REQUIRED ACTION COMPLETION TIME R. Required Action and R.1 Initiate action to fully insert Immediately associated Completion all rods.
Time of Condition B not met in MODE 3, 4, or 5. AND OR R.2 Place the Rod Control 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> System in a condition Required Action and incapable of rod withdrawal.
associated Completion Time of Condition L not met in MODE 3, 4, or 5 for Function 18.a.
OR Required Action and associated Completion Time of Condition I not met.
SURVEILLANCE REQUIREMENTS
NOTE ------------------------------
Refer to Table 3.3.1-1 to determine which SRs apply for each RTS Function.
SURVEILLANCE FREQUENCY SR 3.3.1.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Cook Nuclear Plant Unit 2 3.3.1-6 Amendment No. 249, 278
RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 3 of 6)
Reactor Trip System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS ALLOWABLE VALUE
- 15. SG Water Level - Low 1,2 2 D( SR 3.3.1.1 >Ž25.0%
(per SG) SR 3.3.1.11 SR 3.3.1.13 Coincident with Steam 1,2 2D(f) SR 3.3.1.1 < 1.56E6 lb/hr Flow/Feedwater Flow SR 3.3.1.11 steam flow at RTP Mismatch (per SG) SR 3.3.1.13
- 16. Turbine Trip
- a. Low Fluid Oil Pressure 1 (h) 3 D SR 3.3.1.13 Ž57 psig SR 3.3.1.18
- b. Turbine Stop Valve 1 (h) 4 D SR 3.3.1.13 - 1% open Closure (per train) SR 3.3.1.18
- 17. Safety Injection (SI) Input 1,2 2 trains J SR 3.3.1.6 NA from Engineered Safety SR 3.3.1.19 Feature Actuation System (ESFAS)
- 18. Reactor Trip System Interlocks
- a. Intermediate Range 2 (d), 3(a), 4(a), 5(a) 2 L SR 3.3.1.14 > 6E-11 amp Neutron Flux, P-6 SR 3.3.1.16
- b. Low Power Reactor 1 1 per train L SR 3.3.1.5 NA Trips Block, P-7
- c. Power Range Neutron 1 4 L SR 3.3.1.14 < 31% RTP Flux, P-8 SR 3.3.1.16
- d. Power Range Neutron 1,2 4 L SR 3.3.1.14 >9% RTP and Flux, P-10 SR 3.3.1.16 < 11% RTP
- e. Turbine First Stage 1 2 L SR 3.3.1.1 < 51 psig Pressure, P-13 SR 3.3.1.13 SR 3.3:1.16 (a) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
(d) Below the P-6 (Intermediate Range Neutron Flux) interlock.
(f) Separate condition entry is allowed per SG for only 1 of the 4 total Reactor Trip System Instrumentation Function 15 channels inoperable on each SG (i.e., for only 1 of 2 SG Water Level - Low channels or 1 of 2 Steam Flow/Feedwater Flow Mismatch channels inoperable on each SG). Any combination of 2 or more inoperable Reactor Trip System Instrumentation Function 15 channels on any SG requires immediate entry into LCO 3.0.3.
(h) Above the P-8 (Power Range Neutron Flux) Interlock.
Cook Nuclear Plant Unit 2 3.3.1-13 Amendment No. 2-6.9, 278