SOUTH TEXAS PROJECT UNITS 3 & 4 Presentation to the NRC October 18, 2006 1

Agenda o Objectives &

Opening Remarks Mark McBurnett o Project Progress &

Licensing Schedule Greg Gibson o Engineering Steve Thomas o Concluding Remarks Greg Gibson 2

Objectives and Opening Remarks I

Mark McBurnett Vice President Reg ulatory Affairs and Oversig ht 3

Objectives o Update progress since the July 27 presentation o Provide status of major activities D Identify issues and initiate discussions 4

Project Organization o Since July, STPNOC has developed infrastructure GE - COLA contractor Bechtel - Site characterization work MacTec - Geotechnical (core borings)

Tetra Tech NUS - Environmental report work Baker/Botts - Environmental permits Hitachi - Modularization construction consultant TEPCO - Operating experience consultant 5

STP Organization Quality Supervisor Marion Smith Regulatory Affairs 9 Manager Greg Gibson PRA i

Supervisor Supervisor Bill Stillwell 6

GE Organization 7

Bechtel Organization Quality Services I

Raj Jolly 8

Processes o Procedures on COLA section preparation, review, and approval being finalized by GE and STP o Quality Assurance Program

" Operational Quality Assurance Program and Corrective Action Program Station Procedure revisions for U 1, 2, 3, 4 o Project Design Review Board (PDRB) - DCWG procedure approved 9¸

Site Work Commencing o Site characterization

  • ] Meteorology analysis underway Soil and hydrology studies initiated October 9
  • ] Core Boring Plan approved
  • ] Borings under base mats first
  • ] October through January 2007 10

S~ummary o Infrastructure being established o Onsite work initiated 11

Project Progress and Licensing Schedule Greg Gibson Manager Regulatory Affairs I

12

Agenda - Projmect Progress

& Licensing Schedule Review COLA and Schedule o Licensing Topical Reports o Optimizing the Regulatory Process Permits o Anticipated Interactions 13

Review

-July 27 Meeting ABWR attributes:

m Design certification approved m FOAKE complete N ABWR Family - Significant Operating Experience o]

4 operating ABWRs o1 3 ABWRs now under construction 0

12 additional ABWRs (including STP Units 3 and 4) planned for operation by 2017 14

Review - July 27 Meeting Strategy:

m Minimize departures from DCD Utilize NEI templates m Optimize the application process 15

Maximize Certified Design Percent of FSAR Section Type Sections 25%

Match DCD with no changes or additions; 30 %

Standard for all ABWR COL applications (identical).

Use NEI templates 13 %

Standard with a limited amount of site-specific information 12 %?

S$>~

miiadard withi a mnoderate am110L1 oun of site-specific 20~t %

Site Specific; 100%

16

COLA o Submittal of COLA 4Q07 o Critical path is geotechnical analyses Soil characterization Probabilistic seismic hazards analysis o Working to Optimize schedule and path reduce critical 17

COLA Schedule Acivt Activiy j ID.

Deschiptionl GE423D01D~ Pefiahe Comywentaissue F~il FS~AR AIn - Doartltitol Enaror~noii(Genr'ttcomom c~1~

Our 2~ 05F~B~

Elsoy' Eany ORG Total Otait 1`1111h

.I'.ý.fei T

EVW GE

.57 2MIN 2007

._ II A I:

I f"I II I 11.t 1 I F I LI I,A I M I IiI Ii I Il I I pI1 1

'M I I

.II I

I I

I I

I I

r,,,,,,,,

GE42DI031 0 F5AJRI.11-Cpera~iOlaIExcorenoe (GmEneiCrmnm 15E' [1 SEP06 2-,9D XRN GE 15 l

C-E-42041140D IPrpia Draft I

11f1 MMEFr.,

I

,2%AIl

_-GE 1 15 GE*1* 111501:1 __W__-_

2U109oS&R:7

,3mAjrl IA-L 1,Ž K~

7J 4R 1 I

r WalIl I fO~4eia I I

.1 1 I I I 91mn1~nt I,

On~I ~qx II II II II

.1e~ueFbi rIBI*c9 I IC-~1542l J0 Raoloa Carnrr,&su IFw FS.t T oaPVISDAI-TMA~fi MalkftluI~

I

23102AFM7 27Afl PRO Iz a I-Il

- 4-i-

+ -

+ 4-.--.'-

+

+ -

C-E420132fl-JFSARlA -Reepofte to TMII Re-toad Iftefs 155 1 5SEP06 j 27APR137 GE IB GE2I2K12-:1 PrepweDraf!e 11 I SEFO-T rO-.2-ARd,7 GE 1

--E4201210-CDL Item 1.8 R

R Ilures f RS vafres 25 1VSEF05' mo..TOE GE 109

-E42111211fl COL Item 1.10;-

RmtorReac.kVenln 35 1S5SEPO5 r,5NOVE6

-GE 9-IýO

-to-I t.4.

-~ oJ Ite II T 1-1

.5 p

~olo I I II II I

~e~T~IF

~I I

II

  • 1 I

II II Ii II eIa~.dI GE42312111:

C0L Item 1. 11 - Te'-t "-V & -Isr:arge-Pine 35j I1SEP05 E3.NOVt6 C-E42M 12112 C-L Item 1. 12 -.RCIC B)p3s.arl Sy TE-Et 541 ISEF06" rlEQ.E E

5 It41 tE2E-E81

-t a?

,l_________________________

_i I

rd~,

i I

I I E42aI 210- C31 Item-1.5 -I Ermrg Pro, & TrItngPi GE r

I7EF

'bq GE 57 CW C-E4231210E CCDL fler 1.75-RE'NptMn Pmr foT &R Sng 97 1i5SEF0t' 2EV E107 ci w1 tm 91, oPeM oF 1

~o:

Y GE42012107 C-OL Iteni 1. - M-pamMc Rad ft S-Il S1t e 97 1SSEFCOS E.ZEE07 GE 3'

an R90 A~ a?4t ling S G-142T12103 001 Item 1.9 - RcpWt on ECCS-Curag~s 97 11SSEFOS-02FEWO E

Cj trf~R rý.S1 n'-s:

II G421250M Reviw DraM 2,3Me0 a

20MAR07 ALL I

I I

I I

I I

I I

~pn 9~n4nI Ia I 1Ftn u01 1 *1 IGE42312WOfl RE501-e CaT'rV*e&ItI*&Je FIal 20 IOAPFf7 27APE07 18

Potential Topical Reports COL Item Closure Detailed Design Implementation Process (COL Item 1.1, DCD Section 1.1.11) 1Q07 Life Cycle Management Program (COL Item 1.1 a, DCD Section 1.2.3) 2Q07 Onsite Meteorological Measurements Program (COL Item 2.10, DCD Section 2.3.2)

TBD ABWR Internals Vibration Assessment Program Results (COL Item 3.27, DCD Section 3.9.7) 2Q07 Fuel Design Stabiit yopliane(COL Item 4.1, in DCD ýSection4.3.5) 2Q07 Surveillance Program (COL Item 5.5, DCD Section 5.3.4) 2Q07 Alternate Hydrogen Control (COL Item 6.2, DCD Section 6.2.7) 2Q07 Fuel Bundle MAPLHGR, Peak Cladding Temp and Oxidation Fraction (COL Item 6.6, DCD:Section 6.3.6) 4Q06 P Fuel Bundle Limiting Break (COL Item 6.7a, DCD SectiOn 6.3.6) 4Q06

APRM OscillafionMonitoriLogic (COL Item 7.2 DCD Section 7.6.3) 2Q07 Fuel Inspection Stand Installation (COL Item 9.5, DCD Section 9.1.6) 1Q07 List and Properties of Cranes, Hoists, Elevators (COL Item 9.6, DCD Section 9.1.6) 1Q07 Spent Fuel Racks Structural Evaluation (COL Item 9.7, DCD Section 9.1.6) 1Q07 Spent Fuel Rack Thermal-Hydraulic Analysis (COL Item 9.8, DCD Section 9.1.6) 1Q07 Plant Operating Procedures Development Plan (COL Item 13.3, DCD Section 13.5.3)

TBD Emergency Procedures Writers Guide (COL Item 13.4, DCD Section 13.5.3)

TBD Plant Operating Procedures Development Plan Implementation (COL Item 13.5, DCD Section 13.5.3)

TBD Preoperational Test Specification, Startup Test Specification, and Test Plan (COL Item 14.1, DCD Section 14.2.13) 2Q07 Operational Reliability Assurance Program (COL Item 17.4, DCD Section 17.4) 2Q07 19

Potential Topical Reports Desi2n Acceptance Criteria Safety System Logic and Control/Reactor Trip and Isolation Functions Hardware/Software Specification 2Q07 DCIS Software Management Plan 1Q07 DCIS Software Configuration Management Plan 4Q06 DCIS Software Safety Plan 1Q07 DCIS Software V&V Plan 1Q07 DCIS Installation Review Plan 2Q07 Electromagnetic Compliance Implementation Plan 1Q07 DCIS Factory Acceptance Test Plan 2Q07 HFE Design Implementation Plan 2Q07 20

Potential Topical Reports DCD Departures/Site-Specific Design Information

GESTAR TBD

' GE**Fuel Assembly. Mechanical DesignReport4Q6

  • GEx Futel Rd Ther~mal-'Mechanical.Design Report 4Q06

" GExx Pressure Drop Chaacteristics 4Q06 GExx Nucledr Desigf Report 2Q07 ax*

GExCritical -Power Correlation, Uiieertaif and OLMCPRDevelopment 2Q07

.Control Rod Nuclear DesignReport 2007

. Con*trolRod Mechanictl Design Repot 2Q07 Reactor Internals Flow Induced Vibration 2Q07 Two RWCU Pumps 4Q06 Weir-Type RCIC Pumps 4Q06 Hydrogen Recombiner Deletion 2Q07 Plant Electrical System 2Q07 Fiber Optic Links 1 Q07 Ultimate Heat Sink TBD Control Building Annex - Relocation of MG Sets 2Q07 Shared Common Equipment (e.g., fire pump) 2Q07 21

Optimize Application Process o Identify issues where application process can be optimized o

Quality COLA - Level of Detail; Follow DG-1145 &

SRP o]

Early discussion on issues o]

RAI responses submitted quickly o Discuss issues, options, and resolutions with NRC Staff in public meetings 22

Example Issue: Fuel Selection o GE P8x8R fuel used in certified design (8 x 8)

No longer manufactured No longer supported o GE14 fuel (10x

10) currently available but very likely will not be the actual fuel used (we will use fuel design circa 2011) 23

Example Issue: Fuel Selection o Changing COLA fr "8% of FSAR and om GE P8x8R to GE 12 LTRs 14 impacts o Most work from GE P8x8R to GE14 must be redone when GEx is selected, and license amendments performed circa 2012 o Changing COLA from GE P8x8R to GE14 expends resources with little value 24

Example Issue: Fuel Selection o Potential resolution:

Use GE P8x8R fuel - no DCD departures for fuel related-issues o1 No departures from DCD Chapters 4, 12, 15, 19 for fuel-related issues at this time o

No departures from DCD subsections 1C, 2.3.2.9, 2.3.2.10, 2A, 31, 5.2.2, 6.3, and 11.1 for fuel related issues at this time o]

Deferred LTR submittals for fuel-related issues Commit in COLA submittal letter to submit standard fuel change amendment o Benefit: No duplicated NRC review and no wasted STPNOC & NRC resources 25

Permits and Authorizations o Developing permit schedules o Meet with applicable agencies in 4Q06 o Begin application process in 1Q07 o Anticipate involvement of 10 agencies, 23 permits and authorizations involving 26

Anticipated Interactions o

NRC to observe site boring work o Continue periodic meetings with next meeting early December o Expect NRC public meeting at site in early 2007 27

Engineering Steve Thomas Manager, Engineering 28

Agenda

- Engineering o Site Plan o Boring Plan o Site Work StatuS o Design Ce nter Working Group -

Project Design Review Board 29

30

31

32

Site 1-- Plan I

I j*

33

Boring Plan 34

poring Pian Reactor/Turbine Buildings 35

Borings

- Detail BORINGS (125 total) 2 to 600 feet 25 to 200 feet 14 to 150 feet 37 to 100 feet' 11 to 75 feet 3 to 50 feet 2 to 40 feet Observation Wells (30 15 to 125 feet total) 15 to 50 feet CPTs (35 total) 13 to 100 feet, including 5 seismic cones 7 to 50 feet 15 to 40 feet Test Pits (20 total) 20 pits 10 feet Downhole Geophysical Perform borehole logging and suspension P-S logging in both the 600 ft holes and in 8 of the 200 ft holes Field Electrical Resistivity 2 tests - each test has 10 electrode "A" spacing up to 300 ft.

36

Site Work o

MacTec onsite Work October through.January 37

Site Soil Characterization 38

DCWG/ PDRB o Established DCWG STPNOC Amarillo Power [Pending]

o Established PDRB

  • ] Charter Two meetings Scheduled to complete review identified Tier 1, Tier 2*,

and significant Tier 2 issues by 12/31/06 39

Potential Design Changes 0 Tier 1 Changes:

RCIC Weir Turbine Pump [improves reliability]

STP Flood Level [site requirement]

Hydrogen Recombiner Removal [Industry standard]

Eliminate MSL Rad Monitor Scram & MSIV Closure

[improves reliability/safety]

  • ] 110.% Bypass Capability [improves reliability]

40

Potential Design Changes o Tier 2* Changes:

n Fuel m ACI 349 - 1990 edition m Fiber Optic Links (Not formal ANSI FDDI Standard) o Significant Tier 2 Changes o Other Tier 2 changes will be evaluated using process "similar to 50.59" Appendix A to Part 52 using the criteria in 41

PDRB Reviewed Changes o Removal of SCRAM and MSIV automatic closure on MSLRM alarm o Weir-type turbine RCIC pump in turbine pump o 110% Bypass Capability lieu of Terry o Provide two 2% RWCU pumps instead of two 1%/

RWCU pumps o Medium voltage electrical distribution 0 Control building addition 42

Concluding Remarks Greg Gibson Manager Regulatory Affairs f

43

Next Meeting o Propose o Possible meeting early Dece muber topics m COLA and LTR schedules

" Resolution of DAC items

" Creating-a quality COLA

" Units 3 & 4 Quality Assu rance n Site characterization work status n Engineering and design-status/schedule m Emerging issues 44

Projmect -overview o

Key contracts in place.

Major component contracts in 2Q07 to lock in forging slots o Begin site preparations in 2008 D Unit 3 start-up in 2014/2015 o Infrastructure in place o Site characterization work proceeding o COLA 4Q07 and permit applications 1Q07 o DCWG established and PDRB active 45