Additional Information Supporting the Third Ten-Year Inservice Inspection Interval Relief Request ISI-3-22 for Alternative to ASME Code Rules for the Inside Diameter Structural Weld Overlay Repair Process for CEDM 56
ML062980205
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/20/2006
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ISI-03-22
Download: ML062980205 (2)


Text

ISOUTHERN CALIFORNIA EDISON

,An EDISON INTERNATIONAL Company A. Edward Scherer Manager of Nuclear Regulatory Affairs October 20, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Reference:

Docket No. 50-362 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-22 for Alternative to ASME Code Rules for the Inside Diameter Structural Weld Overlay Repair Process for Control Element Drive Mechanism (CEDM) #56 San Onofre Nuclear Generating Station, Unit 3 Letter from A. E. Scherer to the U. S. Nuclear Regulatory Commission dated May 11, 2006;

Subject:

Docket No. 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-22 Request for Alternative to ASME Code Rules for the Inside Diameter Structural Weld Overlay Repair Process for Control Element Drive Mechanism (CEDM)

  1. 56, San Onofre Nuclear Generating Station, Unit 3

Dear Sir or Madam:

By letter dated May 11, 2006 (referenced), Southern California Edison (SCE) submitted Inservice Inspection (ISI) Relief Request ISI-3-22. In support of the NRC staff's review of Relief Request ISI-3-22, SCE is making the following commitment:

SCE will provide:

1) a comparison of the proposed inspection technique to the technique used in the Electric Power Research Institute (EPRI) Material Reliability Program (MRP)-89 demonstration report, and
2) the results of the Westinghouse technical justification analysis of the capability to monitor the residual indication and detect future growth in a manner consistent with the original EPRI - MRP demonstration.

P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575 6ý7

Document Control Desk October 20, 2006 If you have any questions or would like additional information concerning this subject, please contact Ms. Lynn Pressey at (949) 368-6351.

Sincerely, cc:

B. S. Malleft, Regional Administrator, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3