October 20, 2006 Carolina Power and Light Company ATTN: Mr. C. J. Gannon, Jr.
Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
PUBLIC MEETING
SUMMARY
- CATEGORY ONE REGULATORY CONFERENCE MEETING - SHEARON HARRIS NUCLEAR POWER PLANT, DOCKET NO. 05000400
Dear Mr. Gannon :
This refers to the Regulatory Conference meeting conducted at your request at the Region II Office in Atlanta, Georgia on October 13, 2006. The purpose of the meeting was to discuss inadequate maintenance on the train A chiller of the essential services chilled water (ESCW) system, resulting in that component being inoperable for a period of time in excess of that permitted by your Technical Specifications at the Shearon Harris Nuclear Plant. Enclosed is a list of attendees and licensees presentation slides.
The discussions focused on the following topics: Event Background, Root Causes, Corrective Actions, Reliability Focus, Safety Significance, Harris Nuclear Plant Findings, and SDP Phase III Results. During the conference, Carolina Power and Light Company (CP&L) agreed that a violation of NRC requirements occurred and stated that corrective actions have been taken to prevent recurrence. CP&L stated its disagreement with the NRCs conclusion that the issue resulted in a preliminary White finding. CP&L presented a summary of their charging pump room heatup calculation and risk analysis results based on plant specific information. CP&L also stated that three additional PSA inputs (plant specific fire ignition frequency, loss of emergency bus frequency, and protected train assumption) that show risk reduction were not included in the NRC SDP analysis. Based on their evaluation, CP&L determined this to be a Green (very low safety significance) finding. CP&L committed to submit additional technical information to NRC for review. Results of NRCs review and decision based on review of the additional information provided by CP&L will be discussed in Inspection Report 05000400/2006009.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
CP&L 2
Should you have any questions concerning this meeting, please contact Mr. Son Ninh at (404) 562-4532.
Sincerely,
\\RA\\
Binoy B. Desai, Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.:
50-400 License No.:
Enclosures:
- 1. List of Attendees
- 2. Licensees Presentation Slides
_Pkg ML062930256 OFFICE RII:DRP SIGNATURE SON NAME SNinh DATE 10/ /2006 10/ /2006 10/ /2006 10/ /2006 10/ /2006 10/ /2006 10/ /2006 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
3 CP&L cc:w/encl:
Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company Electronic Mail Distribution Robert J. Duncan II Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Eric McCartney Plant General Manager--Harris Plant Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant Electronic Mail Distribution J. Wayne Gurganious Training Manager-Harris Plant Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center Electronic Mail Distribution Christos Kamilaris, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution David H. Corlett, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution David T. Conley Associate General Counsel - Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Chief, Radiation Protection Section N. C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Tommy Emerson, Chair Board of County Commissioners of Chatham County Electronic Mail Distribution Distribution (See page 4)
4 CP&L Letter to C. J. Gannon, Jr. from Binoy Desai dated October XX, 2006
SUBJECT:
PUBLIC MEETING
SUMMARY
- CATEGORY ONE REGULATORY CONFERENCE MEETING - SHEARON HARRIS NUCLEAR POWER PLANT, DOCKET NO. 05000400 Distribution w/encl:
C. Patel, NRR C. Evans (Part 72 Only)
L. Slack, RII EICS RIDSNRRDIRS OE Mail (email address if applicable)
PUBLIC
LIST OF ATTENDEES Nuclear Regulatory Commission C. Casto, Director, Division of Reactor Projects (DRP), Region II (RII)
J. Shea, Director, Division of Reactor Safety (DRS), RII R. Musser, Acting Chief, Reactor Projects Branch 4, DRP, RII W. Rogers, Senior Reactor Analyst, DRS, RII S. Sparks, Senior Enforcement Specialist, RII S. Ninh, Senior Project Engineer, DRP, RII R. Schin, Senior Reactor Inspector, DRS, RII NRC (via teleconference)
S. Wong, Senior Reactor Analyst, Office of Nuclear Reactor Regulation (NRR).
J. Circle, Senior Reliability & Risk Analyst, NRR H. Wagage, Senior Reactor Engineer, NRR J. McHale, Mechanical Engineer, NRR P. Bonnett, Senior Reactor Analyst, NRR.
L. Trocine, Senior Enforcement Specialist, Office of Enforcement.
Public (via audioconference)
J. Pardington, Chatham News/Record, NC J. Warren, Executive Director, NC WARN S. Sturgis, Independent Weekly newspaper in Durham, NC Shearon Harris Nuclear Plant N. Gannon, Vice President, Harris E. McCartney, Plant General Manager, Harris S. Saunders, Superintendent, Systems Engineering, Harris J. Dills, Superintendent, Electrical and I&C Maintenance, Harris B. Rishel, Supervisor, PSA, Harris D. Corlett, Supervisor, Licensing/Regulatory Programs, Harris N. Block, NAI, (licensee consultant)
J. Hans, Director, Communications, Harris*
- via audioconference