ML062840512
| ML062840512 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/12/2006 |
| From: | Kuo P NRC/NRR/ADRO/DLR |
| To: | Garrett T Wolf Creek |
| rodriguez v m, ADRO/DLR/RLRB, 415-3703 | |
| References | |
| Download: ML062840512 (6) | |
Text
October 12, 2006 Mr. Terry J. Garrett Vice President Engineering Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE WOLF CREEK GENERATING STATION, UNIT 1
Dear Mr. Garrett:
On October 4, 2006, the U.S. Nuclear Regulatory Commission (NRC) received the Wolf Creek Nuclear Operating Corporations application for renewal of operating license NPF-42 for the Wolf Creek Generating Station, Unit 1. We are currently performing an acceptance review for docketing in accordance with the requirements of Title 10 of the Code of Federal Regulations Section 2.101 (10 CFR 2.101), and will notify you of the results of our review. Should the NRC staff determine that the application is acceptable for docketing, a schedule for the review will then be provided to you.
We have enclosed for your information a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication.
I am pleased to announce the appointment of Verónica M. Rodríguez as the project manager for the safety review, and Christian Jacobs as the project manager for the environmental review of your license renewal application. Please forward copies of all license renewal correspondence to Ms. Rodríguez. Jack Donohew continues to remain responsible for the project management of all issues other than license renewal for Wolf Creek Generating Station, Unit 1.
If you have any questions on this matter, please contact Ms. Rodríguez by telephone at 301-415-3703 or via e-mail at VMR1@nrc.gov.
Sincerely,
/RA/
Pao-Tsin Kuo, Deputy Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosure:
Federal Register Notice cc w/encl: See next page
October 12, 2006 Mr. Terry J. Garrett Vice President Engineering Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE WOLF CREEK GENERATING STATION, UNIT 1
Dear Mr. Garrett:
On October 4, 2006, the U.S. Nuclear Regulatory Commission (NRC) received the Wolf Creek Nuclear Operating Corporations application for renewal of operating license NPF-42 for the Wolf Creek Generating Station, Unit 1. We are currently performing an acceptance review for docketing in accordance with the requirements of Title 10 of the Code of Federal Regulations Section 2.101 (10 CFR 2.101), and will notify you of the results of our review. Should the NRC staff determine that the application is acceptable for docketing, a schedule for the review will then be provided to you.
We have enclosed for your information a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication.
I am pleased to announce the appointment of Verónica M. Rodríguez as the project manager for the safety review, and Christian Jacobs as the project manager for the environmental review of your license renewal application. Please forward copies of all license renewal correspondence to Ms. Rodríguez. Jack Donohew continues to remain responsible for the project management of all issues other than license renewal for Wolf Creek Generating Station, Unit 1.
If you have any questions on this matter, please contact Ms. Rodríguez by telephone at 301-415-3703 or via e-mail at VMR1@nrc.gov.
Sincerely,
/RA/
Pao-Tsin Kuo, Deputy Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosure:
Federal Register Notice cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession no.: ML062840512 OFFICE PM:RLRB:DLR LA:DLR OGC BC:RLRB:DLR DD:DLR NAME VRodríguez IKing MZobler JZimmerman (DMerzke for)
PTKuo DATE 10/ 12 /06 10/ 12 /06 10/ 10 /06 10/ 12 /06 10/ 12 /06 OFFICIAL RECORD COPY
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION WOLF CREEK NUCLEAR OPERATING CORPORATION NOTICE OF RECEIPT AND AVAILABILITY OF APPLICATION FOR RENEWAL OF WOLF CREEK GENERATING STATION, UNIT 1 FACILITY OPERATING LICENSE NO. NPF-42 FOR AN ADDITIONAL 20-YEAR PERIOD DOCKET NO. 50-482 The U.S. Nuclear Regulatory Commission (NRC or Commission) has received an application, dated September 27, 2006, from Wolf Creek Nuclear Operating Corporation, filed pursuant to Section 103 of the Atomic Energy Act of 1954, as amended, and Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating license for the Wolf Creek Generating Station (WCGS), Unit 1. Renewal of the license would authorize the applicant to operate the facility for an additional 20-year period beyond the period specified in the current operating license. The current operating license for WCGS, Unit 1, (NPF-42),
expires on March 11, 2025. WCGS, Unit 1, is a pressurized water reactor designed by Westinghouse Electric Corporation that is located near Burlington, KS. The acceptability of the tendered application for docketing, and other matters including an opportunity to request a hearing, will be the subject of subsequent Federal Register notices.
Copies of the application are available to the public at the Commissions Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852 or through the internet from the NRCs Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room under Accession Number ML062770300. The ADAMS Public Electronic Reading Room is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html. In addition, the application is available at http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html. Persons who do not have access to the internet or who encounter problems in accessing the documents located in ADAMS should contact the NRCs PDR reference staff at 1-800-397-4209, extension 4737, or by e-mail to pdr@nrc.gov.
A copy of the license renewal application for the WCGS, Unit 1, is also available to local residents near the site at the Burlington Library, 410 Juniatta, Burlington, KS 66839.
Dated at Rockville, Maryland, this 12th day of October, 2006.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Pao-Tsin Kuo, Deputy Director Division of License Renewal Office of Nuclear Reactor Regulation
Letter to Terry Garrett from Veronica Rodriguez dated October 12, 2006
SUBJECT:
RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE WOLF CREEK GENERATING STATION, UNIT 1 HARD COPY DLR RF E-MAIL:
PUBLIC JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes VRodriguez CJacobs JDonohew CColleli RKWild JStorch RidsOpaMail RidsOcaMailCenter
Wolf Creek Generating Station cc:
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street, NW Washington, DC 20037 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-7005 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839 Chief Engineer, Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Thomas A. Conley, Section Chief Radiation and Asbestos Control Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant 8201 NRC Road Steedman, MO 65077-1032 Kevin J. Moles, Manager Regulatory Affairs Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Lorrie I. Bell, Project Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708