Technical Specifications, Reissuance of Several TS Pages That Had Errors as a Result of Dominion Nuclear Connecticut, Inc. (DNC) Processing and Software Issues
ML062750183
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/27/2006
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Nerses V
Shared Package
ML062610048 List:
References
TAC MD2958, TAC MD2959
Download: ML062750183 (5)


Text

March 16, 2006 TABLE 3.3-1 (ContinueA TABLE NOTAITON

  • With the protective system trip breakers in the closed position and the CEA drive system capable of CEA withdrawal.

(a) Trip may be bypassed below 5% of RATED THERMAL POWER; bypass shall be automatically removed when THERMAL POWER is;> 5% of RATED THERMAL POWER.

(b) Trip may be manually bypassed when steam generator pressure is < 800 psia and all CEAs are fully inserted; bypass shall be automatically removed when steam generator pressure is > 800 psia.

(c) Trip may be bypassed below 15% of RATED THERMAL POWER; bypass shall be automatically removed when THERMAL POWER is > 15% of RATED THERMAL POWER.

(d) Trip does not need to be OPERABLE if all the control rod drive mechanisms are de-energized or if the RCS boron concentration is greater than or equal to the refueling concentration of Specification 3.9.1. -

(e) DELETED (I) AT Power input to trip may be bypassed below 5% of RATED THERMAL POWER; bypass shall be automatically removed when THERMAL POWER is >5% of RATED THERMAL POWER.

ACTION STATEMENTS ACTION 1 - With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in HOT STANDBY within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and/or open the protective system trip breakers.

ACTION 2 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may continue provided the following conditions are satisfied:

a. The inoperable channel is placed in either the bypassed or tripped condition within I hour. The inoperable channel shall either be restored to OPERABLE status, or placed in the tripped condition, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
b. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, all functional units receiving an input from the inoperable channel are also declared inoperable., and the appropriate actions are taken for the affected functional units.
c. The Minimum Channels OPERABLE requirement is met; however, one additional channel may be removed from service for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, provided one of the inoperable clbmmds is placed in the tripped condition.

MILLSTONE - UNIT 2 3/4 3-4 Amendment No. 9, 4, 1Z, 446, 41-39,

, -226,280, 291

k March 16,2006 REACTOR COOLANT SYSTEM COOLANT LOOPS AND COOLANT CIRCULATION STARTUP AND POWER OPERATION LIMITING CONDITION FOR OPERATION 3.4.1.] Two reactor coolant loops shall be OPERABLE and in operation.

APPLICABILITY: MODES 1 and 2.

ACTION:

With the requirements of the above specification not met, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS" 4.4.1.1 The above required reactor coolant loops shall be verified to be in operation at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MILLSTONE - UNIT 2 3/4 4-1 Amendment No. 60, 69, 30, -249,291

March 16,2006

.PLANT SYSTEMS MAIN FEEDWATER ISOLATION COMPONENTS (MFICs)

LIMITING CONDITION FOR OPERATION (Continued)

b. With two or more of the feedwater isolation components inoperable in the same flow path, either:
1. Restore the inoperable component(s) to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> until ACTION 'a' applies, or
2. Isolate the affected flow path within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and verify that the inoperable feedwater isolation components are closed.or isolated/secured once per 7 days, or
3. Be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.6 Each feedwater isolation valve/feedwater pump trip circuitry shall be demonstrated OPERABLE at least once per 18 months by:

a. Verifying that on 'A' main steam isolation test signal, each isolation valve actuates to its isolation position, and
b. Verifying that on 'B' main steam isolation test signal, each isolation valve actuates to its isolation position, and C. Verifying that on 'A' main steam isolation test signal, each feedwater pump trip circuit actuates, and
d. Verifying that on 'B' main steam isolation test signal, each feedwater pump trip cirduit actuates.

h1ILLSTONE - UNIT 2 3/4 7-9b Amendment No. 49-8, 291

REACTIVITY CONTROL SYSTEMS CONTROL ROD INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.6 The control banks shall be limited in physical insertion as specified in the CORE OPERATING LIMITS REPORT (COLR). I APPLICABILITY: MODES 1*and 2****

ACTION:

With the control banks inserted beyond the insertion limits specified in the COLR, except for surveillance testing pursuant to Specification 4.1.3.1.2:

a. Restore the control banks to within the limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or
b. Reduce THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the insertion limits specified in the COLR, or
c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.6 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when the rod insertion limit monitor is inoperable, then verify the individual rod positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

  • See Special Test Exceptions Specifications 3.10.2 and 3.10.3.
    • With Keff greater than or equal to 1.

MILLSTONE - UNIT 3 314 1-27 Amendment No. 40, 60, 229