MONTHYEARIR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick IR 05000400/20243012023-05-15015 May 2023 Notification of Licensed Operator Initial Examination 05000400/2024301 ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 2024-01-30
[Table view] |
Text
Brunswick Nuclear Plant P.O. Box 10429 CP&L Southport N.C. 28461 May 21, 2001 Sergeant Mark Dalton Hazardous Material Coordinator North Carolina State Highway Patrol Research and Planning 4702 Mail Service Center Raleigh, NC 27699 - 4702
Dear Sergeant Dalton:
In accordance with 10 CFR73.37, the following information is provided concerning a forthcoming shipment of irradiated nuclear reactor fuel by CP&L.
- 1. Name, Address, and Telephone Number of Shipper. Carrier, and Receiver:
- a. Shipper: Brunswick Nuclear Plant Docket Nos. 50-325 and 50-324 P.O. Box 10429 Southport, NC 28461 (910) 457-2375
- b. Carriers: CSX Transportation U.S. Army Chief Dispatcher Military Ocean Terminal 3019 Warrington St. Sunny Point Jacksonville, FL 32205 Southport, NC 28461-5000 (904) 381-2780 (910) 341-8315
- c. Receiver: Harris Nuclear Plant Docket No. 50-400 5413 Shearon Harris Rd.
New Hill, NC 27562 (919) 362-2157
- 2. Description of Shipment - Radioactive material in IF-300 series shipping cask(s):
Cask ID No. USA/9001/B( )F; s/n IF-303, s/n IF-304.
- a. Cask(s) Used This Shipment: IF-303, IF-304
- b. Proper Shipping Name: Radioactive Material, Fissile, N.O.S., (7)RQ
- c. DOT Hazard Class: Radioactive Material, Fissile
- d. DOT ID No.: UN2918
- e. DOT Subtype: Highway Route Controlled Quantity
- f. Mode of Shipment: Rail
- g. Physical Form: Solid
- h. Chemical Form: Plutonium Oxide and Uranium Oxide
- i. Radionuclides: Am-241, Pu-238, Pu-241, Pu-240, Cm-244, Pu-239, Sr-90
- j. Original Enrichment: IF-303: 3.00 IF-304: 2.12
- k. Hazardous Material Quantity: IF-303: 10,251 Lbs. Estimated IF-304: 10,251 Lbs. Estimated
!. Total Becquerel / Curie Content: IF-303: 5.703E4 TBq 1.542E6 Curies IF-304: 1.833E4 TBq 4.955E5 Curies 3L4,OS( RA.L&Z eIr4 0 rips: A 1
'flS506 &JI,
Brunswick Nuclear Plant P.O. Box 10429 Southport N.C. 28461 Sergeant Mark Dalton 2 05/21/2001
- m. Transport Index: IF-303: 30 Estimated IF-304: 30 Estimated
- n. Category of Label: Radioactive Yellow III
- o. Type of Reactor: BWR
- 3. Route Within the State of North Carolina
- a. Brunswick Nuclear Plant to Leland, NC: Sunny Point Military Ocean Terminal Railroad
- b. Leland, NC to Hamlet, NC: CSX Railroad
- c. Hamlet, NC to Harris Nuclear Plant: CSX Railroad By copy of this correspondence, the Nuclear Regulatory Commission is provided notification of this shipment.
In accordance with IOCFR73.21 and IOCFR73.37, the information on the attachment is designated as safeguards information and shall be protected in accordance with the provisions of IOCFR73.2 1.
Bn c KNS.per Pan t
ý Brunswick Nuclear Plant DBH/dbh Attachment cc: (1) U.S. Nuclear Regulatory Commission (3) U.S. Nuclear Regulatory Commission Spent Fuel Project Office Director, Division of Industrial and Medical 11555 Rockville Pike Nuclear Safety Rockville, MD 20852-2738 11545 Rockville Pike Rockville, MD 20852-2738 (2) Harris Nuclear Plant Denny Braund Harris Security 5413 Shearon Harris Rd.
New Hill, NC 27562