ML062610064

From kanterella
Jump to navigation Jump to search

Acknowledgment of Request for Exemption from Certain Requirements of 10 CFR 74.19(b) and 10 CFR 74.19(c)
ML062610064
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/22/2006
From: Kristina Banovac
NRC/NMSS/DWMEP/DD
To: Berg W
Dairyland Power Cooperative
References
TAC L60560
Download: ML062610064 (2)


Text

September 22, 2006 Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

ACKNOWLEDGMENT OF REQUEST FOR EXEMPTION FROM CERTAIN REQUIREMENTS OF 10 CFR 74.19(B) AND 10 CFR 74.19(C) (TAC L60560)

Dear Mr. Berg:

I am responding to your letter dated July 26, 2006 (revised letter with corrected page numbers received August 22, 2006), which forwarded your request for exemption from certain requirements of 10 CFR 74.19(b) and 10 CFR 74.19(c). We have completed the initial processing of your request, which is an administrative review.

We have determined that the information provided in the document is sufficient to begin the technical review. Please note that the technical review may identify omissions in the submitted information or technical issues not identified during the administrative review that require additional information. The technical review will be completed 90 days from the date of this letter.

If you have any questions, please call me at (301) 415-5114 or klb@nrc.gov.

Sincerely, Kristina L. Banovac, Project Manager Reactor Decommissioning Section Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No.: 50-409 cc: See next page

September 22, 2006 Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

ACKNOWLEDGMENT OF REQUEST FOR EXEMPTION FROM CERTAIN REQUIREMENTS OF 10 CFR 74.19(B) AND 10 CFR 74.19(C) (TAC L60560)

Dear Mr. Berg:

I am responding to your letter dated July 26, 2006 (revised letter with corrected page numbers received August 22, 2006), which forwarded your request for exemption from certain requirements of 10 CFR 74.19(b) and 10 CFR 74.19(c). We have completed the initial processing of your request, which is an administrative review.

We have determined that the information provided in the document is sufficient to begin the technical review. Please note that the technical review may identify omissions in the submitted information or technical issues not identified during the administrative review that require additional information. The technical review will be completed 90 days from the date of this letter.

If you have any questions, please call me at (301) 415-5114 or klb@nrc.gov.

Sincerely,

/RA/

Kristina L. Banovac, Project Manager Reactor Decommissioning Section Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No.: 50-409 cc: See next page DISTRIBUTION:

DCD r/f NMSS/DWMEP r/f PLee/RIII JCameron/RIII GTuttle DOrlando ML062610064 OFC DCD:PM DCD:LA DCD:SC DCD:DD NAME KBanovac TMixon CCraig KMcConnell DATE 9/20/06 9/22/06 9/20/06 9/21/06 OFFICIAL RECORD COPY

La Crosse Boiling Water Reactor Service List cc:

Mr. Fritz Schubert, Esq.

Dairyland Power Cooperative 2615 East Avenue South La Crosse, WI 54601 Whieler, Van Sickle and Anderson Suite 801 25 W. Main Street Madison, WI 53703-3398 Mr. Roger Christians, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative P.O. Box 275 Genoa, WI 54632 Town Chairman Town of Genoa Route 1 Genoa, WI 54632 Mr. Jeffery Kitsembel Electric Division Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Mr. Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Wisconsin Division of Public Health P.O. Box 2659 Madison, WI 53701-2659 Mr. Michael Brasel, Project Engineer La Crosse Boiling Water Reactor Dairyland Power Cooperative P.O. Box 275 Genoa, WI 54632 Mr. Jeff McRill, Technical Support Engineer La Crosse Boiling Water Reactor Dairyland Power Cooperative P.O. Box 275 Genoa, WI 54632 Regional Administrator Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351