September 13, 2006
Mr. Paul A. Harden
Site Vice President
Nuclear Management Company, LLC
Palisades Nuclear Plant
27780 Blue Star Memorial Highway
Covert, MI 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT, INFORMATION REQUEST FOR AN NRC
BIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI)
Dear Mr. Harden:
On October 30, 2006, the NRC will begin a biennial baseline Component Design Bases
Inspection (CDBI) at the Palisades Nuclear Plant. A team of six inspectors will perform
this 3-week inspection. This inspection will be performed in accordance with revised NRC
Baseline Inspection Procedure (IP) 71111.21 and replaces the biennial Safety System Design
and Performance Capability Inspection.
The CDBI inspection focuses on components which have high risk and low margins. The
components to be reviewed during this baseline inspection will mainly be identified during an
information gathering visit and during the subsequent in-office preparation week. In addition, a
number of risk significant operator actions, modifications, and operating experience issues,
associated with the component samples, will also be selected for review.
The inspection will include 4-weeks on-site, including the information gathering site visit and the
3-weeks of on-site inspection. The inspection team will consist of six NRC inspectors, of which
five will focus on engineering and one on operations. The current inspection schedule is as
follows:
On-site Information gathering visit: Week of October 30 - November 3, 2006
On-site weeks: November 13 - 17, November 27 - December 1, and
December 11 - 15, 2006
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components, and operator actions. Additional information and
documentation needed to support the inspection will also be identified. A Region III Senior
Reactor Analyst will accompany the inspection team during the information gathering visit, to
review probabilistic risk assessment data and assist in identifying risk significant components,
which will be reviewed during the inspection.
P. Harden
-2-
Experience with previous baseline design inspections of similar depth and length has shown
that these type of inspections are extremely resource intensive, both for the NRC inspectors
and the licensee staff. In order to minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for information needed for
the inspection. The request has been divided into three groups. The first group lists
information necessary for a productive information gathering visit and for general preparation.
This information should be available to the Regional Office no later than October 16, 2006.
Insofar as possible, this information should be provided electronically to the lead inspector.
Since the inspection will concentrate on high risk/low margin components, calculations
associated with your list of high risk components should be available for the inspectors to
review during the information gathering visit to assist in our selection of components based on
available design margin. The team will attempt to narrow down the list of components prior to
the information gathering visit such that you will be able to focus your resources for document
retrieval to those components.
The second group of documents requested are those items which the team will need access to
after the selection of components. Additional information, such as operating experience
evaluations, procedures, condition reports, and modification packages will be requested as
those selections are completed. The third group lists information necessary to aid the
inspection team in tracking issues identified as a result of the inspection and reference material
necessary to conduct the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the on-site portions of the inspection. In
order to facilitate the inspection, we request that a contact individual be assigned to each
inspector to ensure information requests, questions, and concerns are addressed in a timely
manner.
The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that our
licensing contact for this inspection is Ms. Barbara Dotson of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact the
lead inspector at (301) 415-1082 or via e-mail at vpl@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
P. Harden
-3-
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
Enclosure:
Component Design Bases Inspection (CDBI) Document Request
cc w/encl:
J. Cowan, Executive Vice President
and Chief Nuclear Officer
R. Fenech, Senior Vice President, Nuclear
Fossil and Hydro Operations
D. Cooper, Senior Vice President - Group Operations
L. Lahti, Manager, Regulatory Affairs
J. Rogoff, Vice President, Counsel and Secretary
A. Udrys, Esquire, Consumers Energy Company
S. Wawro, Director of Nuclear Assets, Consumers Energy Company
Supervisor, Covert Township
Office of the Governor
State Liaison Office, State of Michigan
L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division
P. Harden
-3-
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
Enclosure:
Component Design Bases Inspection (CDBI) Document Request
cc w/encl:
J. Cowan, Executive Vice President
and Chief Nuclear Officer
R. Fenech, Senior Vice President, Nuclear
Fossil and Hydro Operations
D. Cooper, Senior Vice President - Group Operations
L. Lahti, Manager, Regulatory Affairs
J. Rogoff, Vice President, Counsel and Secretary
A. Udrys, Esquire, Consumers Energy Company
S. Wawro, Director of Nuclear Assets, Consumers Energy Company
Supervisor, Covert Township
Office of the Governor
State Liaison Office, State of Michigan
L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division
DOCUMENT NAME:E:\\Filenet\\ML062560527.wpd
G Publicly Available
G Non-Publicly Available
G Sensitive
G Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
RIII
RIII
RIII
NAME
AMStone for PLougheed: ls
AMStone
DATE
9/13/06
9/13/06
OFFICIAL RECORD COPY
P. Harden
-3-
ADAMS Distribution:
LMP
TEB
RidsNrrDirsIrib
GEG
KGO
JBG
JAE
CAA1
DRPIII
DRSIII
PLB1
TXN
ROPreports@nrc.gov
INFORMATION REQUEST FOR PALISADES NUCLEAR PLANT
COMPONENT DESIGN BASES INSPECTION (CDBI)
Enclosure
1
Assigned Inspection Report: 05000255/2006009(DRS)
Information Gathering Dates:
October 30 - November 3, 2006
Onsite Inspection Dates
November 13 - 17, November 27 - December 1, and
December 11 - 15, 2006
Inspection Procedure:
IP 71111.21, Component Design Bases Inspection
Lead Inspector:
Patricia Lougheed, Lead Inspector
(301) 415-1082 (through October 13)
(630) 829-9760 (October 16 onwards)
vpl@nrc.gov
I.
Information Requested Prior to the Information Gathering Visit
The following information is requested by October 16, 2006, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the team leader as soon as possible. (Please provide the information electronically in
pdf files, Excel, or other searchable formats, preferably via e-mail or on CDROM. The
files should be called by descriptive names, and, if on CDROM, should be indexed and
hyperlinked to facilitate ease of use. Information in lists should contain enough
information to be easily understood by someone who has a knowledge of pressurized
water reactor technology.)
1.
Risk ranking of top 100 components from your site specific probabilistic safety
analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for
Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)
(as applicable);
2.
Provide a list of the top 500 cut-sets from your PSA;
3.
Risk ranking of operator actions from your site specific PSA sorted by RAW.
Provide copies of your human reliability worksheets for these items;
4.
If you have an External Events or Fire PSA Model, provide the information
requested in Items 1 and 2 for external events and fire. Provide narrative
description of each coded event (including fire, flood zone description);
5.
Any pre-existing evaluation or list of components and associated calculations
with low design margins, (i.e., pumps closest to the design limit for flow or
pressure, diesel generator close to design required output, heat exchangers
close to rated design heat removal etc.);
INFORMATION REQUEST FOR PALISADES NUCLEAR PLANT
COMPONENT DESIGN BASES INSPECTION (CDBI)
Enclosure
2
6.
List of available design margins for valves in the motor-operated valve (MOV)
and air-operated valve (AOV) programs;
7.
List of high risk Maintenance Rule systems/components based on engineering
or expert panel judgement;
8.
Structures, systems, and components (SSCs) in the Maintenance
Rule (a)(1) category;
9.
Site top 10 issues list (if applicable);
10.
A list of operating experience evaluations for the last 3 years;
11.
A list of modifications sorted by the components identified in item 1;
12.
Information of any common cause failure of components experienced in the last
5 years at your facility;
13.
A list of the design calculations which provide the design margin information for
components included in item 1. (Calculations should be available during the
information gathering visit. The team will attempt to narrow down the list of
components that will be reviewed prior to the information gathering visit such
that you will be able to focus your resources for document retrieval to those
components.);
14.
List of Root Cause Evaluations associated with component failures or design
issues initiated/completed in the last 5 years; and
15.
Current management and engineering organizational chart.
II.
Information Requested to be Available after Selection of Components
(Week of November 6, 2006)
1.
List of condition reports (corrective action documents) associated with each of
the selected components for the last 4 years;
2.
The corrective maintenance history associated with each of the selected
components for the last 4 years;
3.
Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files. Please review the calculations and
also provide copies of referenced material (such as drawings, engineering
requests, vendor letters);
INFORMATION REQUEST FOR PALISADES NUCLEAR PLANT
COMPONENT DESIGN BASES INSPECTION (CDBI)
Enclosure
3
4.
Copies of operability evaluations associated with each of the selected
components and plans for restoring operability, if applicable;
5.
Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable;
6.
Copies of any open temporary modifications associated with each of the selected
components, if applicable;
7.
Trend data on the selected electrical/mechanical components performance for
last 3 years (For example, pumps performance including in-service testing, other
vibration monitoring, oil sample results, etc., as applicable);
8.
A copy of any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection;
9.
A copy of engineering/operations related audits completed in the last 2 years;
and
10.
Provide list of PRA assumptions regarding operator actions and the associated
procedures.
III.
Information Requested to be Provided Throughout the Inspection
1.
Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection;
2.
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member);
3.
One complete set of P and IDs and one line electrical drawings (paper copies);
and
4.
Reference materials (make available if needed during all on-site weeks):
IPE/PRA report;
Procurement documents for components selected (verify retrievable);
Plant procedures (normal, abnormal, emergency, surveillance, etc.);
Technical Specifications;
Updated Final Safety Analysis Report; and
Vendor manuals.