ML062560021
| ML062560021 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/25/2006 |
| From: | Goyette R - No Known Affiliation |
| To: | Dyer J Office of Nuclear Reactor Regulation |
| DUDLEY N, NRR, 415-1145 | |
| Shared Package | |
| ML062650256 | List: |
| References | |
| %dam200612, TAC MD2965, Y020060171 | |
| Download: ML062560021 (1) | |
Text
Original Due Date: 09/25/2006 Ticket Number: 020060171 Document Date: 08/25/2006 NRR Received Date: 09/11/2006 From:
TACs:
MD2965 Russell Goyette To:
J. E. Dyer For Signature of:
- YELLOW **
Routing:
Dyer Weber Davis Holahan Boger NRR Mailroom
==
Description:==
Concerns Relating to Response Letter Sent by Dyer 7/17/06 Assigned To:
Contact:
GILLESPIE, FRANK P Special Instructions:
Russell W. Goyette 7 Strathmere Street Waretown, NY 08 75 8 August 25, 2006 Mr. J. E. Dyer, Director Office of Nuclear Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Mr. Dyer:
This letter relates to your letter to me, dated July 17, 2006. In your letter you state "NRC licensing reviews are conducted to ensure protection of public health and safety and the environment." Apparently, this has not been so.
In its application review, the NRC apparently has ignored the following:
The real risk of terrorism, especially after 9/1l, and with a plant never designed to thwart terrorist attack.
0 The storage of highly dangerous radioactrive waste in a vulnerable location on plant grounds.
0 The absence of a realistic evacuation plan, jeopardizing the safety of thousands of people, especially seniors who have moved to the. area since initial plant approval.
0 The dry-wall liner, which protects the public from possible radiation, has suffered serious corrosion and will not receive adequate testing.
The data submitted to evaluate damage to nearby Barnegat Bay is 35 years old. How about something more current?
Public hearings simply do not take place. The absence of public hearings is undemocratic.
Responsible people, like the state governor, local elected officials, the DEP Commissioner, are shoved aside, for fear of what they might say and "to move the approval process" along for the nuclear industry.
The review process is clearly a sham. Public Safety? Not here!
Please respond.
Sincerely,