ML062430634

From kanterella
Jump to navigation Jump to search
Midcycle Performance Review and Assessment Plan - Arkansas Nuclear One
ML062430634
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/31/2006
From: Graves D
NRC/RGN-IV/DRP/RPB-E
To: Forbes J
Entergy Operations
References
Download: ML062430634 (6)


Text

UNITED STATES NUCLEAR REGULATORY C O M M I S S I O N REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 31, 2006 Jeffrey S. Forbes Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72801-0967

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

ARKANSAS NUCLEAR ONE

Dear Mr. Forbes:

On August 9, 2006, the NRC staff completed its performance review of Arkansas Nuclear One for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIS)for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security Related Information will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIS indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition we also plan on conducting several other inspections which include Temporary Instructions and Inspection Procedure 50003, Pressurizer Replacement Inspection.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to minimize the resource impact on your staff and to allow for the early resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

Entergy Operations, Inc. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams. html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.

Sincere1y ,

E#--

David N. Graves, Chief Project Branch E Division of Reactor Projects Dockets: 50-313 50-368 Licenses: DPR-51 NPF-6

Enclosure:

Arkansas Nuclear One InspectionlActivity Plan cc w/enclosure:

Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 County Judge of Pope County Pope County Courthouse 100 West Main Street Russellville, AR 72801

Entergy Operations, Inc. Winston & Strawn LLP 1700 K Street, N.W.

Washington, DC 20006-3817 Bernard Bevill Radiation Control Team Leader Division of Radiation Control and Eme rgency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, AR 72205-3867 James Mallay Director, Regulatory Affairs Framatome ANP 3815 Old Forest Road Lynchburg, VA 24501 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339 Chairperson Denton Field Office Chemical and Nuclear Preparedness and Protection Division Office of Infrastructure Protection Preparedness Directorate Dept. of Homeland Security 800 North Loop 288 Federal Regional Center Denton, TX 76201-3698

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (BSMI )

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJCI)

Senior Resident Inspector (RWD)

Branch Chief, DRP/E (DNG)

Senior Project Engineer, DRPlE (VGG)

Team Leader, DRP/TSS (RLNI)

RlTS Coordinator (KEG)

V. Dricks, PA0 (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPSI)

B. Wetzel, Chief, TRPS, OED0 (BAW)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

D. Holland, NRR Project Manager for AN0 (DGHI)

SUNS1 Review Completed: -DNG ADAMS: J Y e s 0 No Initials: -DNG-J Publicly Available CI Non-Publicly Available Cl Sensitive J Non-Sensitive OFFICIAL RECORD COPY T=Te lepho ne E=E-mail F=Fax

m c m m m m m u ) m c C C K K K K c

0 ._

c 0 .P e - -

.P .P .P

.I2 e

.o c

0 0 0 0 0 0 0 0

- a, a, a, m a l a , m a , a l a , a,

.Kl a m m Q a, 0 0) a a a m E a an. a a, m m m a, o m m

- 8 -c - c 3 m

3 m

K K K 3 m -8 .$

._ -= - = -C

0. a, a, - - a a a , - 0)

QE, m a ,

.-= .- =

a,

.- -ca, -a a- .E -

-cn - -

K .E .E K a

I1 - c x c x x 88 -

a, a, a, a , c a, m a , a, 0) e (0 m c c m m m c c m m 0 m m m m m m m m 0 0 m m m z m m VI 0 m m m z z m m m (D (D (D (D (D ( D ( D ( D (D br- r - b b br- b 0

0 N .

0 0

N 0

0 N

0 0

N 0

0 N

0 0

0 0

0 0

0 0

N 0

0 e

0 0

??

0 0

0 0

e e e 0

0 0

0 0

0 0

0 e

m b

0 2

b 0

r Q

m 0

m Q!

m 0

7 N

0 7

Q Q Q

? E ?

0 7

7 T-m ( D P

- N 0

r 0

2 2 2 z z z 2

- 0 1 0

8 0

Y N

0 (D (D (D (D (D co r-r- b b b 0

0 N

E 0

0 e

0 0

. . e. 2.

0 T-Q!

m N

0 0

7 N

0 0

(D 7

0 0

N 0

m 0

0 22 Q Q 0

0 0

0 e

0 0

9 0

0 e

N r

b r- m m m 0 - N - N N 0 0 0 0 0 7 0 0 0 0 0 C U m C U r F 4

4 d

0 0

N IT F

W

-J 0

U W

z W

CS 0

IT z a, m

Y m 0

0 K zi 0 m ._0 a  ?! I G a Y L

.-m0 cn C L I

K ._

0 3 m m m0 a, L E aE

- - 'c s z m W C

m cn

.Kl P P a a cn c

m c

c LL -

-x c c -x 8 a v) m0 -

.-m m

e 0

c 0

c .-8 -m0 8 .-

0 .-

0 m cL z - 0 1

C -00 C s

c c c

0 m 0 .-0 I3

._ 0 0 a, U m 0 0

0) -0 IT I- m c a, a, z m U IT 73 L

dU m IT U 0

U K m

z a, 0 0 I e

- m c

U K

U K I- - .-m c

K P ._ m m U c K

c K

C 0 .-

c 0 n Y c P C c

m U

N a,

dz 0 0

a c

.-8 .-

e m0 v) 0 0

L L z L

3 m 6 m a m 0 0 a

0, IT e K

I K Y a, U 8 4 8 5a 0

a 2 I-z a a,

12 12 a,

z v) 3 I-0 0

0 4z

, I I m m n 2 .(D (D

7-m 0

7 N

N m

N 4v) 5:

m m N

%?

N 0

7 2

In N

a a 7

T-7 b

Q) co r

N 52 Qn i;:

am a am In 7

T-r- i;x v)

U 9

n N

7 T-b a

F a W W a

m m m m c c c c

.o .o

+ - + -

.o .o

+ - + A 0 0 0 0 m a , m a , ala, a

m m n 0.0.

m m ZiE C C -c - c m m a l a , a , @ _ .o

.o Q E

.E .E

- - .E .E

- - Q Q m a ,

m m a l a ,

m m a a

+.I.-

m a a m 0 0 m m m m z z b b b b b b b b b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F N N 2 % e U J N 2  %$!

l- Nl-5 s 9 9 e??

$ 2 2 0 0 0 0 - z z T - N

- 7 b I - b b b b b b b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e?? e?!

2 N

? $ $

0 0 N

0 c%?

z s 9 2 0 -

7 - 0 1 E ?

e N P S z 2 7- 7 I- (D m 0)

.-C

.I.-

m a,

I-UC 0

m e

...u c P C

.-0 0 K .I.-

0 0 C a,

.-0 0 .I.-

.I 0

m m

?!

2 al a ti 0 2 2 0 2 ii ii P

w N m UJ N I-0 d

7 0

d 7

e 0

7 z

l N

0 7

N 7 7 E T-7 T-7 7-7 T-7 7-7 7-7 E b b b I- b b 0) 0 a a a a a n a a a in W a