McGuire Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:32:19 Report 22 1
2515/169
- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 2
PSB1-RP
- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/18/2006 09/22/2006 1, 2 71151 IP Performance Indicator Verification 1
EB3TI150
- 2515/150 U-2: RPV & VHP NOZZLES Safety Issues 09/25/2006 09/29/2006 2
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB3-ISI
- UNIT 2 INSERVICE INSPECTION Baseline Inspections 09/27/2006 10/06/2006 2
7111108P IP Inservice Inspection Activities - PWR 2
PSB1-RP
- RP BASELINE OCCUPATIONAL WK2 Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/02/2006 10/06/2006 1, 2 71151 IP Performance Indicator Verification 1
PS2-EP
- EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/23/2006 10/27/2006 1, 2 71151 IP Performance Indicator Verification 6
EB2-TFP
- FIRE PROTECTION-TRIENNIAL PRE INSP VISIT Baseline Inspections 10/31/2006 11/02/2006 1, 2 7111105T IP Fire Protection [Triennial]
5 EB2-TFP
- FIRE PROTECTION-TRIENNIAL Baseline Inspections 11/27/2006 12/01/2006 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 12/11/2006 12/15/2006 1, 2 7111105T IP Fire Protection [Triennial]
4 PB1-PI&R
- BIENNAL PI&R INSPECTION Baseline Inspections 01/22/2007 01/26/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 02/05/2007 02/09/2007 1, 2 71152B IP Identification and Resolution of Problems 3
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 02/12/2007 02/16/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 02/12/2007 02/16/2007 1, 2 7111117B IP Permanent Plant Modifications 3
OL PREP
- INITIAL EXAM PREPARATION Not Applicable 02/26/2007 03/02/2007 1
V23263 MCGUIRE/MARCH 2007 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
McGuire Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:32:19 Report 22 4
OL EXAM
- INITIAL EXAM Not Applicable 03/19/2007 03/30/2007 1
V23263 MCGUIRE/MARCH 2007 EXAM AT POWER FACILITIES 1
EB3-ISI
- UNIT 1 INSERVICE INSPECTION Baseline Inspections 03/26/2007 03/30/2007 1
7111108P IP Inservice Inspection Activities - PWR 1
EB3TI150
- 2515/150 U-1: RPV & VHP NOZZLES Safety Issues 04/02/2007 04/06/2007 1
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Safety Issues 04/08/2007 04/13/2007 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
2 EB3-HS
- HEAT SINK Baseline Inspections 05/07/2007 05/11/2007 1, 2 7111107B IP Heat Sink Performance 2
EB3-MR
- MAINTENANCE RULE EFFECTIVENESS Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111112B IP Maintenance Effectiveness 1
60855.1
- OPERATIONAL ISFSI INSP. BY RESIDENT Other Routine 07/09/2007 07/13/2007 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 3
PS2-EP
- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/15/2007 10/19/2007 1, 2 71151 IP Performance Indicator Verification 1
PSB1-RP
- RP PUBLIC PRE-INSP/ISFSI Baseline Inspections 11/05/2007 11/07/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4
PSB1-RP
- RP PUBLIC BASELINE INSPECTION Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 11/26/2007 11/30/2007 1, 2 71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.