Inspection/Activity Plan, 09/01/2006 - 03/31/2008
ML062430393
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/30/2006
From:
NRC/RGN-II/DRP/RPB1
To:
Duke Energy Carolinas, Duke Power Co
Shared Package
ML062430389 List:
References
Download: ML062430393 (2)


Text

Page 1 of 2 McGuire 08/30/2006 13:32:19 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues PSB1-RP - RP BASELINE OCCUPATIONAL WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections EB3TI150 - 2515/150 U-2: RPV & VHP NOZZLES 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 09/25/2006 09/29/2006 Safety Issues EB3-ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/27/2006 10/06/2006 Baseline Inspections PSB1-RP - RP BASELINE OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/02/2006 10/06/2006 Baseline Inspections PS2-EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL PRE INSP VISIT 6 1, 2 IP 7111105T Fire Protection [Triennial] 10/31/2006 11/02/2006 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL 5 1, 2 IP 7111105T Fire Protection [Triennial] 11/27/2006 12/01/2006 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 12/11/2006 12/15/2006 Baseline Inspections PB1-PI&R - BIENNAL PI&R INSPECTION 4 1, 2 IP 71152B Identification and Resolution of Problems 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/05/2007 02/09/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 02/12/2007 02/16/2007 Baseline Inspections OL PREP - INITIAL EXAM PREPARATION 3 1 V23263 MCGUIRE/MARCH 2007 EXAM AT POWER FACILITIES 02/26/2007 03/02/2007 Not Applicable This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 08/30/2006 13:32:19 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM 4 1 V23263 MCGUIRE/MARCH 2007 EXAM AT POWER FACILITIES 03/19/2007 03/30/2007 Not Applicable EB3-ISI - UNIT 1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/26/2007 03/30/2007 Baseline Inspections EB3TI150 - 2515/150 U-1: RPV & VHP NOZZLES 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 04/02/2007 04/06/2007 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 04/08/2007 04/13/2007 Safety Issues EB3-HS - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 05/07/2007 05/11/2007 Baseline Inspections EB3-MR - MAINTENANCE RULE EFFECTIVENESS 2 1, 2 IP 7111112B Maintenance Effectiveness 06/04/2007 06/08/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI INSP. BY RESIDENT 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine PS2-EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 10/15/2007 10/19/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/15/2007 10/19/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/15/2007 10/19/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/05/2007 11/07/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSPECTION 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/26/2007 11/30/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.