Report 22 - Inspection/Activity Plan for 09/01/2006 - 03/31/2008
ML062430271
Person / Time
Site: Oconee, 07200040  Duke Energy icon.png
Issue date: 08/31/2006
From: Ernstes M
NRC/RGN-II/DRP/RPB1
To: Brandi Hamilton
Duke Energy Carolinas, Duke Power Co
Shared Package
ML062403266 List:
References
Download: ML062430271 (3)


Text

Oconee Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2006 14:26:19 Report 22 1

2515/169

- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2, 3 2515/169 IP Mitigating Systems Performance Index Verification 3

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 09/25/2006 09/29/2006 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/25/2006 09/29/2006 1, 2, 3 7111117B IP Permanent Plant Modifications 1

EB3-ISI

- UNIT 1 INSERVICE INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1

7111108P IP Inservice Inspection Activities - PWR 1

EB3SGISI

- UNIT 1 STEAM GENERATOR ISI Baseline Inspections 10/23/2006 10/27/2006 1

7111108P IP Inservice Inspection Activities - PWR 2

PSB1-RP

- RP ACCESS CONTROL AND INSTRUMENTATION Baseline Inspections 10/30/2006 11/03/2006 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/30/2006 11/03/2006 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Safety Issues 11/19/2006 11/24/2006 1

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 PSB1-RP

- RP PRE-INSP VISIT/ISFSI Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 2

OL RQ

- REQUALIFICATION INSPECTION Baseline Inspections 03/26/2007 03/30/2007 1, 2, 3 7111111B IP Licensed Operator Requalification Program 3

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 04/16/2007 04/20/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/16/2007 04/20/2007 1, 2, 3 71151 IP Performance Indicator Verification 1

EB3-ISI

- UNIT 2 INSERVICE INSPECTION Baseline Inspections 04/23/2007 04/27/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

EB3SGISI

- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 04/30/2007 05/04/2007 2

7111108P IP Inservice Inspection Activities - PWR 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Safety Issues 05/06/2007 05/11/2007 2

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

2 PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 05/07/2007 05/11/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/07/2007 05/11/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 05/07/2007 05/11/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/07/2007 05/11/2007 1, 2, 3 71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Oconee Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2006 14:26:19 Report 22 5

PB1-PI&R

- BIENNIAL PI&R INSPECTION Baseline Inspections 07/09/2007 07/13/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 1

60855.1

- OPERATIONAL ISFSI RESIDENT INSPECTION Other Routine 07/09/2007 07/13/2007 1

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 5

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 08/06/2007 08/10/2007 1

V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1

PS2-EP

- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151 IP Performance Indicator Verification 5

OL EXAM

- INITIAL EXAM WEEK 1 Not Applicable 08/27/2007 08/31/2007 1

V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 2

OL EXAM

- INITIAL EXAM WEEK 2 Not Applicable 09/10/2007 09/14/2007 1

V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1

EB3-ISI

- UNIT 3 INSERVICE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 3

7111108P IP Inservice Inspection Activities - PWR 1

EB3SGISI

- UNIT 3 STEAM GENERATOR ISI Baseline Inspections 11/05/2007 11/09/2007 3

7111108P IP Inservice Inspection Activities - PWR 1

PSB1-RP

- RP PUBLIC PRE-INSP VISIT Baseline Inspections 01/14/2008 01/16/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 5

EB1CDBI

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 02/11/2008 02/15/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 03/24/2008 03/28/2008 1, 2, 3 7111121 IP Component Design Bases Inspection 4

PSB1-RP

- RP PUBLIC BASELINE INSP Baseline Inspections 03/03/2008 03/07/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/03/2008 03/07/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/03/2008 03/07/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 03/03/2008 03/07/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/03/2008 03/07/2008 1, 2, 3 71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oconee Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2006 14:26:19 Report 22 3

PS2-EP

- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.