Page 1 of 3 Oconee 08/30/2006 14:26:19 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 1, 2, 3 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/25/2006 09/29/2006 Baseline Inspections 1, 2, 3 IP 7111117B Permanent Plant Modifications 09/25/2006 09/29/2006 Baseline Inspections EB3-ISI - UNIT 1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections EB3SGISI - UNIT 1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/23/2006 10/27/2006 Baseline Inspections PSB1-RP - RP ACCESS CONTROL AND INSTRUMENTATION 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 10/30/2006 11/03/2006 Baseline Inspections 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/30/2006 11/03/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 11/19/2006 11/24/2006 Safety Issues PSB1-RP - RP PRE-INSP VISIT/ISFSI 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/19/2007 03/23/2007 Baseline Inspections OL RQ - REQUALIFICATION INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/26/2007 03/30/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 04/16/2007 04/20/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 04/16/2007 04/20/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 04/16/2007 04/20/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 04/16/2007 04/20/2007 Baseline Inspections EB3-ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB3SGISI - UNIT 2 STEAM GENERATOR ISI 2 2 IP 7111108P Inservice Inspection Activities - PWR 04/30/2007 05/04/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/06/2007 05/11/2007 Safety Issues PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK2 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 05/07/2007 05/11/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 05/07/2007 05/11/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 05/07/2007 05/11/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 05/07/2007 05/11/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 3 Oconee 08/30/2006 14:26:19 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PB1-PI&R - BIENNIAL PI&R INSPECTION 5 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/09/2007 07/13/2007 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/23/2007 07/27/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI RESIDENT INSPECTION 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine OL PREP - INITIAL EXAM PREPARATION 5 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 08/06/2007 08/10/2007 Not Applicable PS2-EP - EP INSP 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 08/06/2007 08/10/2007 Baseline Inspections OL EXAM - INITIAL EXAM WEEK 1 5 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 08/27/2007 08/31/2007 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 2 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 09/10/2007 09/14/2007 Not Applicable EB3-ISI - UNIT 3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/29/2007 11/02/2007 Baseline Inspections EB3SGISI - UNIT 3 STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 11/05/2007 11/09/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 01/14/2008 01/16/2008 Baseline Inspections EB1CDBI - COMPONENT DESIGN BASES INSPECTION 5 1, 2, 3 IP 7111121 Component Design Bases Inspection 02/11/2008 02/15/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 02/25/2008 02/29/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 03/24/2008 03/28/2008 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSP 4 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/03/2008 03/07/2008 Baseline Inspections 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/03/2008 03/07/2008 Baseline Inspections 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/03/2008 03/07/2008 Baseline Inspections 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 03/03/2008 03/07/2008 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 03/03/2008 03/07/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Oconee 08/30/2006 14:26:19 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2, 3 IP 7111401 Exercise Evaluation 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP01 Drill/Exercise Performance 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP02 ERO Drill Participation 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP03 Alert & Notification System 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.