ML062400430
| ML062400430 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/04/2005 |
| From: | Dominion, Dominion Nuclear Connecticut |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 25203-26017, Rev 50 | |
| Download: ML062400430 (1) | |
Text
NONE 84-024 RJC CHARGING SYSTEM I
2-CH-316 2-CH-317 2-CH-437 2-CH-314 4"-HCB-12 4"-HCB-12 1/2 "
HYDROSTATIC TEST PUMP CONNECTIONS PC 224 X
2"-HCB-12 SPEC.
CHG.
2-CH-315 1"-HSC-113 FLUSH CONN.
1 1/2 "-CCB 2"
L-11A P18A CHARGING PUMP PS TI LG 233 233 233 233 X
X X
X PI HS HS 2003 A
B 2003 C21 PAL 233 X
I 2-CH-319 2-CH-320 2-CH-438 4"-HCB-12 4"-HCB-12 1/2 "-HCB-12 1/2 "
SPEC.
CHG.
1"-HSC-113 PC 224 Y
2"-HCB-12 SPEC.
CHG.
2-CH-318 FLUSH CONN.
1 1/2 "-CCB L-11B P18B CHARGING PUMP PS TI LG 233 233 233 233 Y
Y Y
Y PI HS HS 2004 2004 PAL 233 Y
I 2-CH-917 2-CH-322 2-CH-323 2-CH-439 4"-HCB-12 4"-HCB-12 3/4 "-HCB-12 SPEC.
CHG.
3/4 "-HSC-113 1"-HSC-113 PC 224 Z
FLUSH CONN.
1 1/2 "-CCB L-11C P18C CHARGING PUMP PS TI LG 233 233 233 233 Z
Z Z
Z PI HS HS 2005 2005 PAL 233 Z
2"-CCB-6 SPEC.
CHG.
2-CH-706 1"
1/2 "-HSC-113 1"-HSC-113 4"-HCB-12 4"-HCB-12 4"-HCB-12 1/2 "-HSC-113 2"-CCB-6 32009 SH.40,41,42,43 SIAS STARTS CHARGING PUMP CONTROLS PRESS.
LEVEL CONTROLS 1/4 "
1/4 "
1/4 "
1/4 "
1" 1"
SPEC.
CHG.
2-CH-110 2-CH-502 2-CH-503 2-CH-107 2-CH-109 3/4 "-GBD-70 3/4 "-HBD-221 1"-HCC-39 2-CH-112 SPEC.
CHG.
1"-HRC-17 1/2 "-HRC-17 VENT TO WASTE GAS HEADER RWS 2-CH-105 3/4 "-HCC-39 2-CH-760 TE 225 ALM. IND.
VOLUME CONTROL TANK T-5 1"-HCC-32 AN 2-CH-104 2-CH-103 S
A/S FO 2-CH-102 FC HY HS 513 2513 ZS 513 2CH513 2-CH-100 SPEC.
CHG.
1/2 "-HCC-32 1/2 "-HRC-13 WASTE GAS HEADER RWS 9419 SPEC.
CHG.
I SPEC.
CHG.
FL SPEC.
CHG.
2-CH-116 AN 9418 1"-HCC-43 2-CH-117 2-CH-742 1"-HSC-114 1/2 "-HSC-35 2-CH-743 2-CH-446 3/4 "-HCC-25 PT 225 PA PI PAHL 225 225 225 2-CH-771 2-CH-114 2-CH-113 AN 9419 2-CH-715 SAMPLE SYSTEM 4"
SAMPLE SYSTEM 4"-HCC-30 3"
2-CH-115 4"
TI 2538 FE FE FI 501 501 501 A
B HS 2501 2501 A
HS SIAS CLOSES ZS 2CH501 501 2-CH-501 2-CH-118 HYDRAZINE SYSTEM 4"-HCB-12 212 FE 1/2 "
2 VENT 3/4 "
2-CH-709 I
FL 2-CH-429 HV ZS HS 2524 2524 2524 2CH429 M
DRAIN 2-CH-710 1"-CCB-6 2-CH-661 3/4 "-CCB-6 2-RC-71 DRAIN SPEC.
CHG.
0.0625 WALL TW 2022 2"-CCB-6 PP PP 2020 2021 3/4 "-HSC-5 3/4 "-HSC-5 SPEC.
CHG.
SPEC.
CHG.
2-CH-004 2-CH-003 1/2 "
2 1/2 "
2 X-21 3/4 "
2-CH-443 REGENERATIVE HEAT EXCH.
S FO ACCUM.
PCV PI HY HS ZS 2CH519 2519 519 519 9839 9839 SPEC.
CHG.
2"-CCB-4 2"
2" 2-CH-434 2-CH-435 LC 2-CH-519 FO 2-CH-433 3/4 "
2-CH-680 2-CH-679 VENT SPEC.
CHG.
2-CH-681 2-CH-682 1"-MSD-33 1"
2"-CCA-13 CHARGING TO LOOP 1A S
FO HY HS ZS L.O.
SPEC.
CHG.
FO 3/4 "
VENT SPEC.
CHG.
2-CH-686 1"-MSD-33 1"
2"-CCA-13 CHARGING TO LOOP 2A S
CHG.
3/4 "
VENT SPEC.
CHG.
1"-MSD-33 VENT 3/4 "
2-CH-714 2"
518 2518 518 2CH518 2-CH-518 2-CH-432 2-CH-685 2-CH-684 2-CH-683 FC 2CH517 517 2517 517 2-CH-517 2-CH-697 2-CH-698 1"-CCA-12 2-CH-752 2-CH-753 SPEC.
CHG.
DRAIN 2-CH-700 2-CH-699 2-CH-431 AUX. SPRAY 2"-CCA-12 S
M VENT WELL STUFFING BOX PLUNGER 1"
1/4 "
1 PAHL 234 X
PS PS PI 234 X
PI-234Y PI-234Z 1/2 "-HSC MANUAL FILL LI LS 234 234 X
X LI-234Y LI-234Z LS-234Y LS-234Z SUMP TANK 1"
1"-HSC-129 1"-HSC-129 WELL DRAIN FI 234 X
FI-234Y FI-234Z COOLANT WASTE RECEIVER TANK 3"-HSC-73 3
2-CH-513 2
H 2
N 3"-HCB-14 3"-HCB-19 1 1/2 "-HCB-12 3"-HCB-18 1"-HSC-113 TO CNTMT ENCL. BLDG. AND AUX BLDG. DRAIN SYSTEM TO CNTMT ENCL. BLDG. AND AUX BLDG. DRAIN SYSTEM TO CNTMT ENCL. BLDG. AND AUX BLDG. DRAIN SYSTEM TO REACTOR COOLANT PUMPS LOWER SEALS FROM PMW SH. 3 (J-11)
FROM BORIC ACID TANK SH. 3 (E-12)
FROM PMW SH. 3 (G-8)
FROM BORIC ACID PUMP DISCHARGE TO CNTMT ENCL. BLDG. AND AUX BLDG. DRAIN SYSTEM TO CNTMT ENCL. BLDG. AND AUX BLDG. DRAIN SYSTEM TI TT 229 229 TW/TE 229 TO CNTMT ENCL. BLDG. AND AUX BLDG. DRAIN SYSTEM 2"-CCB-4 M
TO CNTMT ENCL. BLDG. AND AU X BLDG. DRA IN SYSTEM CO2 CO2 CO2 CO2 CO2 CO2 SH.2 (J-11)
SH.2 (J-11)
CO2 CHARGING PUMP SEAL LUBRICATION SYSTEM CO2 CO2 SH. 3 ( H-10)
CO2 SBR SUPERSEDES 25203-26017 THRU REV. 20 C10 C10 C
I CO2 C21 HS HS 2005 2005 A
B A
C10 C02 C10 HS HS 2524 2524 B
C10 C10 HS HS 2004 2004 A
B I
C D
PMW C10 C10 HS HS 2519 2519 A
B I
I HS 2517 HS 2517 A
B C10 C10 D
CO2 C21 PIPING & INSTRUMENTATION DIAGRAM 10-14-86 CM SBR 4-13-87 4-13-87 JGR 4-7-87 4-13-87 BACK-UP BOTTLE AIR SYSTEM BACK-UP BOTTLE AIR SYSTEM BACK-UP BOTTLE AIR SYSTEM 26024 SH.1 (B-5) 26024 SH.1 (B-5) 26024 SH.1 (B-5) 26024 SH.1 (C-13) 26024 SH.1 (C-13) 26021 SH.2 (F-6) 26021 SH.2 (F-6) 26024 SH.3 (C-3) 26024 SH.3 (J-9) 26020 SH.2 (D-10) 26024 SH.3 (K-9) 26014 SH.3 (C-2) 26014 SH.1 (B-11) 26014 SH.1 (H-3) 26014 SH.2 (H-3) 26022 SH.1 (K-13)
OPERATIONS CRITICAL SH. 3 ( F-11)
SH. 3 (C-1) 1/2 "-HCB-22 26031 SH.1 (F-1) 26035 (E-5) 26033 (G-5) 26009 SH.6 (E-7) 26009 SH.6 (E-7) 26009 SH.6 (E-7) 26025 SH.1 (K-10) 26025 SH.4 (E-7)
L 234X H
234X PS-234Y-L PS-234Y-H PS-234Z-L PS-234Z-H PAHL-234Y PAHL-234Z Q.A.
3/4 "
3/4 "
D WATERFORD, CT 2-IA-694 2-IA-692 2-IA-693 LC 2"
4"X2" ECCENTRIC REDUCER 3/4 "
2"X1 1/2 "
4"X2" ECCENTRIC REDUCER 3/4 "
2"X1 1/2 "
2" 4"X2" ECCENTRIC REDUCER 3/4 "
2" 2-CH-068(A) 2-CH-069(B) 2-CH-070(C) 2-CH-943(A) 2-CH-944(B) 2-CH-945(C) 2-CH-946(A) 2-CH-947(B) 2-CH-948(C) 2-CH-940(A) 2-CH-941(B) 2-CH-942(C) 2-CH-076(C) 2-CH-075(B) 2-CH-074(A) 2-CH-965(A) 2-CH-966(B) 2-CH-967(C) 2-CH-938(B) 2-CH-937(C) 2-CH-939(A) 2-CH-930(A) 2-CH-931(B) 2-CH-932(C) 2-CH-949(A) 2-CH-950(B) 2-CH-951(C) 2-CH-095(A) 2-CH-093(C) 2-CH-094(B) 2-CH-952(A) 2-CH-954(B) 2-CH-956(C) 2-CH-953(A) 2-CH-955(B) 2-CH-957(C) 2-CH-959(A) 2-CH-961(B) 2-CH-963(C) 1" 1"
PUMP "A" ONLY SPEC.
CHG.
INSTRUMENTATION:
"A" CHARGING PUMP LABEL HAS SUFFIX "X" "B" PUMP SUFFIX = "Y" "C" PUMP SUFFIX = "Z" VALVES:
VALVE LABELS ARE LISTED WITH:
"A" CHARGING PUMP-TOP "B" CHARGING PUMP-MIDDLE "C" CHARGING PUMP-BOTTOM 1/2 " HSC 1/2 "
1" X 1/2 "
3/4 "
VENT 3/8 " O.D. SST 2-CH-717 3/8 " O.D. SST 3/8 " O.D. SST 3/8 "
1/2 " X 3/8 " RED. (TYP) 1/2 "
1" 1/2 " X 3/8 " RED. (TYP) 1" 1"
1" SPEC.
CHG.
3/4 "
3/8 " O.D. SST 2-CH-108 1"
1" PCV 2-CH-624(A) 2-CH-627(B) 2-CH-628(C)
SPEC.
CHG.
3/8 " O.D. SST 3/8 " O.D. SST SPEC.
CHG.
SPEC.
CHG.
SPEC.
CHG.
3/8 " O.D. SST 3/8 " O.D. SST 1/2 "-HCB-12 SPEC.
CHG.
1/2 "
1/2 " P X 3/8 " T ADAPT (TYP) 1/2 " P X 3/8 " T ADAPT (TYP) 1/2 " P X 3/8 " T ADAPT (TYP) 3/8 " O.D. SST 3/8 " O.D. SST 3/8 " O.D. SST SPEC.
CHG.
3/8 " O.D. SST 3/8 " O.D. SST 3/8 " O.D. SST 1/2 " SS O.D. SST 1/2 " O.D. SST 3/8 " O.D.
SST (TYP)
PCV 2"x1 1/2 "
26009 SH.8 (F-7) 3/8 " 0.D. SST 26009 SH.8 (F-7) 3/8 " 0.D. SST 26009 SH.8 (F-7) 1"-HSC-129 1/2 "-HSC-129 1/2 "-HSC-129 P-97A STRAINER (TYP FOR P-97B,C) 3/8 "Px 3/8 "T 1/4 "Px 3/8 "T 1/4 " HSC 1/4 " HSC 3/8 " SST 1/4 " HSC 1/4 " HSC 2-CH-958 (PUMP A) 2-CH-960 (PUMP B) 2-CH-962 (PUMP C)
=
=
=
T229
=
=
=
P225 LC I/A I/A I/A LC LC LC LC LC LC 2-CH-002 LC 2-CH-001 LC CO2 CO2 CO2 NOTE 3 1"-HSC-35 3/4 "-CCB-6 2-CH-986 HSC CCB 2-SSP-219 3/4 "-HSC-35 26024 SH. 3 (H-10)
CCA CCB 1"
3/8 " O.D. SST LO T-126 2-IA-787 3/8 " O.D. SST 3/8 " O.D. SST ACCUM.
T-125 2-IA-788 PCV PI 9996 9996 ACCUM.
T-127 PCV PI 9997 9997 3/8 " O.D. SST 2-IA-789 LC LC LC LO 2-CH-987(A) 2-CH-988(B) 2-CH-989(C)
FROM PMW/RWST 2-IA-785 3/8 "
2-IA-786 3/8 "
2-IA-790 3/8 "
FSAR FIGURE SAFETY EVALUATION MAYBE REQUIRED PRIOR TO CHANGES 2"-MSD-10(PUMP B) 4"-MSD-10(PUMP A & C)
(SEE NOTE 5)
TO CNTMT ENCL. BLDG.
AND AUX BLDG. DRAIN SYSTEM 1/2 "
3/4 "X 1/2 "
1"X 1/2 "
1"X 3/4 "
1"-HSC-113 SPEC.
CHG.
1"-HSC-35 1"-HSC-113 1"-HSC-113 2"X 1/2 "
3/4 "-HSC-113 SPEC.
CHG.
L349B SUCTION STABILIZER 2-CH-901 2-CH-904 SPEC.
CHG.
3/4 "
SPEC.
CHG.
3/4 "-HCB-12 2-CH-911 2-CH-918 3/4 "X 1/2 "
1/2 "
1"X3/4" 1"X 1/2 "
1" 1"-HSC-113 3/4 "-HSC-113 SPEC.
CHG.
SUCTION STABILIZER SPEC.
CHG.
3/4 "
SPEC.
CHG.
3/4 "-HCB-12 2-CH-913 2-CH-900 2-CH-903 2-CH-919 L349A 2-CH-746 3/4 "X 1/2 "
TO CNTMT ENCL. BLDG. AND AUX BLDG. DRAIN SYSTEM 26024 SH.3 (J-9) 1"-HSC-113 1"-HSC-113 SH. 2 (K-8)
FROM LETDOWN HEAT EXCHANGE INLET PIPING DRAIN 1"X 3/4 "
1/2 "-HSC-113 1"X 1/2 "
2-CH-747 1"-HSC-113 1"-HSC-113 2"X 1/2 "
3/4 "-HSC-113 3/4 "-HSC-113 LO LO LC LC 25203-28500 SH. 224 SH. 3 ( K-11) 3" HCC-33 3" HCC-25 SH. 2 ( C-10) 2" 3/8 " O.D. SST 1"-HSC-129 A-10 T-130C LEAKOFF DRAIN COLLECTION TANK 26024 SH.3 (C-3)
AREA DRAINS SYSTEM 3/4 "
VENT 1" TYGON TUBING 26024 SH.3 (C-3)
AREA DRAINS SYSTEM VENT 1 1/2 "
DRIP PAN DRAIN 1"-HSC-129 1"-HSC-129 C-9 C-9 T-130A (PUMP A)
T-130B (PUMP B)
OIL SEPARATOR 2"X1" 2"X1" SIGHT GLASS 1"-HSC-129 1 1/2 "
CHANGES MADE TO THIS P&ID MUST ALSO BE REFLECTED ON THE INSERVICE INSPECTION PROGRAM DRAWING 25203-26700 SH. 14 NOTES:
FOR ALL OTHER ABBREVIATIONS SEE ANSI STANDARD Y1.1.
ABBREVIATIONS SEE 26001 SH. 1, 2, & 3.
- 1. FOR NOTES, SYMBOLS AND UNIT #2
- 3. VALVE 2-CH-435 NO LONGER FUNCTIONS AS A CHECK VALVE. PART NO.4 (PISTON DISC)
AND PART NO. 7 (SPRING) WERE REMOVED.
- 2. DELETED (BY DCN DM2-00-0762-97)
- 4. CONTROLOTRON MODEL 994 PORTABLE FLOW COMPUTER CONNECTED TO THE TRANSDUCER DURING PERIODIC TESTING.
A STAINLESS STEEL FUNNEL IS LOCATED AT THE OUTLET OF 1" DRAIN LINE (1"-HSC-129)
FROM THE "B" CHARGING PUMP SEAL LUBRICATION SYSTEM PIPE OUTLET FEEDING INTO THE FLOOR DRAIN 5.
- 6. RAD WASTE LINES DESIGNATED AS HSC-35, HSC-113, AND HSC-114 AS SHOWN ON THIS DRAWING ARE NOT PART OF THE ISI PROGRAM. RAD WASTE LINES DESIGNATED AS HSC-35, HSC-113, AND HSC-114 WHICH ARE ASME SECTION III CODE CLASS 3 LINES AS SHOWN ON THIS DRAWING ARE DOWNGRADED TO ANSI B31.1 PER REG GUIDE 1.143 REV. 1 "DESIGN GUIDANCE FOR RADIOACTIVE WASTE MANAGEMENT SYSTEMS, STRUCTURES, AND COMPONENTS INSTALLED IN LIGHT WATER NUCLEAR POWER PLANTS". PIPE CLASSES FOR THE LINE NUMBERS WILL REMAIN THE SAME FOR HISTORICAL PURPOSES. ALL NEW PIPING SHALL BE INSTALLED TO THE APPLICABLE ANSI B31.1 PIPE CLASS, WITH A (R) FORTH LETTER CODE FOR RAD WASTE QA. PER DCN DM2-00-0216-03.
CHARGING PUMP #1 1"
2-CH-993 TO ATMOS LO NOTE 7 1"-HSC-113 1"
7.
1"-HSC-113 2-CH-339 2-CH-328 2-CH-340 DRAIN 2-CH-440 2"-CCB-2 1"
2-CH-326 SPEC.
CHG.
2-CH-337 2-CH-331 2-CH-325 SPEC.
CHG.
1"-HSC-113 2-CH-336 2-CH-334 2-CH-335 2-CH-745 SPEC.
CHG.
2-CH-324 2"-CCB-6 2"-CCB-6 FP FE 9869 B
NOTE 4 FE 9869 A
2-CH-332 SPEC.
CHG.
SPEC.
CHG.
2-CH-329 1"-HSC-113 2-CH-338 LC LC 2-CH-996 2-CH-997 1"-CCB-6 2-CH-669 HYDROSTATIC TEST PUMP CONNECTIONS 2-CH-707 HPSI HEADER 26015 SH.2 (H-9)
CHARGING PUMP #3 CHARGING PUMP #2 1"-HSC-113 SPEC.
CHG.
1" 2-CH-995 TO ATMOS 2-CH-321 1"-HSC-113 1"
2" X 3/4 "
2"-HCB-12 1"-HSC-113 LO NOTE 7 SPEC.
CHG.
1"-HSC-113 3/4 "-HSC-113 SPEC.
CHG.
L349C SUCTION STABILIZER 2-CH-902 2-CH-905 SPEC.
CHG.
3/4 "
SPEC.
CHG.
3/4 "-HCB-12 2-CH-912 3-WAY VALVES 2-CH-993, 2-CH-994, & 2-CH-995 ARE ALIGNED AND LOCKED OPEN TO CLEAN WASTE.
1" 2-CH-994 TO ATMOS LO NOTE 7 1"-HSC-113 1"-HSC-113 1"
7/8 " S.S.
FLEX HOSE 2-CH-428 212 FT 212 FAL CO2 3/4 "
3/4 "
3/8 " O.D S.S.
LO LO 3/8 " O.D. S.S.
2-CH-427 CCB (TYP)
C-2 212 CO2 F212 FI 2-CH-025 3/4 "
3/8 " O.D.
PT 2037 NOTE 8 C-2 CCB PULSATION DAMPENER 2-CH-026 3/4 "
3/8 " O.D.
PT 2036 NOTE 8 PULSATION DAMPENER C-2 CCB 2-CH-027 3/4 "
3/8 " O.D.
PT 2035 NOTE 8 C-2 CCB PULSATION DAMPENER PT PI 212 212 P212 C-2 212A PT NOTE 8 3/8 " O.D.
2-CH-425 CCB 3/4 "
PI 2035 PI 2036 PI 2037 MONITORING OF SYSTEM.
- 8. WHERE NOTED, INSTRUMENT AVAILABLE FOR MANUAL 25203-26017 SH. 1 OF 3 50 1 1/2 "-HCB-12 226 LIT LY SPEC.
CHG.
C02 226 C02R SPEC.
CHG.
LAHL 226 C02 L226 LI 226 C02 25203-28500 SH 226 MAKEUP CONTROLS 25203-29203 SH.4,7 1/2 " O.D. SST DRAIN SH. 2 ( E-10) 26020 SH. 4 (F-4)
TO HV-9008 SH. 3 ( H-9)
LC 227 50 JSJ INCORP. DCN DM2-00-0213-04 5-4
-05 DED MP WBZ MILLSTONE NUCLEAR POWER STATION-UNIT 2 REV w:\\mpcad\\cadadmin\\users\\mich652-it\\pdf\\Batch_1\\C260171.DGN 10/31/2005 A
C E
D F
G H
J 3
4 1
2 5
6 7
8 9
10 11 12 13 K
B NO.
DATE REVISIONS BY CHK.
APP.
APP.
REVISIONS DURING CONSTRUCTION BY DATE SCALE CHKD.
DATE APP.
DATE DWG. NO.
APP.
DATE TITLE A
C E
D F
G H
J K
B 5
6 7
8 9
10 11 12 13 NOTE:
MANUAL REVISIONS TO THIS DOCUMENT WHEN AS-BUILT ARE PROHIBITED.
CAD Dominion Nuclear Connecticut, Inc.
Millstone Power Station R