ML062400426
| ML062400426 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/13/2005 |
| From: | Dominion, Dominion Nuclear Connecticut |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 25203-26014, Rev 30 | |
| Download: ML062400426 (1) | |
Text
OPERATIONS CRITICAL NOTES:
1.
FOR NOTES, SYMBOLS AND UNIT #2 FOR ALL OTHER ABBREVIATIONS SEE ANSI STANDARD Y1.1.
PIPING AND INSTRUMENTATION DIAGRAM MILLSTONE NUCLEAR POWER STATION - UNIT 2 REACTOR COOLANT SYSTEM NONE M. R. BIBISI 84-024 FO S
FO S
2-RC-005 FO I
S I
I S
S I
TE 116 1"
QUENCH TANK 3"
2-RC-004 2"
2-RC-401 FC 2"-HSC-58 A/S 3"
ZS 401 2RC401 HY 401 LT 116 HS 401 PRIMARY DRAIN HEADER 1"
2-RC-241 LI 116 LA 116 LAHL 116 3"-HSC-59 PDT & QT COOLER 1"
2-RC-240 T-38 PT 116 PI 116 PA 116 PAH 116 3/4 "-HCC-47 2-RC-400 FC SPEC CHG 3/4 "-HCC-47 3/4 "-HRC-15 A/S ZS 400 HY 400 HS 400 1 1/2 "-HCC-47 2-RC-242 SPEC CHG 2"-HRC-15 WASTE GAS HEADER 3/4 "
2-GR-100 DRAIN 18" 2"-HCC-48 2"-HCC-48 SPEC CHG 2-RC-243 2-PMW-1 2"-HCD-37 3/4 "-HCD-31 1 1/2 "-HCD-37 1 1/2 "-HCD-37 1 1/2 "-HCD-82 2-PMW-213 REACTOR VESSEL DECON. SYSTEM 1 1/2 "-HCD-82 2-PMW-315 2-PMW-313 2-PMW-314 1"
1" 1"
1" 2-PMW-302 1 1/2 "-HCD-82 2-PMW-301 2-PMW-306 2-PMW-304 2-PMW-303 1"
1" 1"
1" 2-PMW-307 2-PMW-308 2-PMW-309 1"
1" 1 1/2 "-HCD-82 1 1/2 "-HCD-82 1"
2-PMW-310 2-PMW-312 1"
1" 1"
2-PMW-316 3/4 "
VENT 2-PMW-2 2-PMW-3 SPEC CHG 2"-HCB-4 1
3/4 "
2-PMW-165 LC T.C.
ZS 7311 2PMW43 FC 2-PMW-43 SPEC CHG A/S HY 7311 HS 7311 CIAS CLOSES HV 7311 2"-HCD-37 VENT 2-PMW-318 LO 3/4 "
PRIMARY MAKE-UP WATER 10" SPEC CHG SPEC CHG 2-RC-41 2-RC-42 3"
2"-HCC-57 HPSI TEST LINE RELIEF PDT & QT COOLER 3"-HSC-22 3"
2" 2"
10"-ECC-1 AUXILIARY SPRAY 2"-CCA-12 25203-29199 SH.8 INDICATION & ALARM TE 108 PROPORTIONAL HEATER CONTROLS BACK UP HEATER CIRCUIT BREAKERS 12"-BCA-1 PRESSURIZER SURGE LINE 2-RC-209 LT 110 Y
LEVEL CONTROL PT 103 C-21 PI PI 103 103B PT 100 Y
PT 102 B
PT 102 B-1 PR 102 B-1 PT 102 D
1"-BCA 1"-BCA 1"-BCA 2-RC-205 2-RC-207 TE 109 TI 109 TE 101 T-37 4"-CCA-11 4"-BCA-4 4"-BCA-4 SPEC CHG 2 1/2 "
2 1/2 "
2-RC-201 2-RC-200 ZS 201 ZAH 201 6"-ECC-1 SPEC CHG ZAH 200 ZS 200 TE 107 TE 106 INDICATION & ALARM 6"-ECC-1 4"-ECC-1 4"-ECC-1 4"-BCA-2 3/4 "-BCA-5 2-RC-021 2-RC-421 3/4 "-BCA-3 AN 9782 2-RC-238 SPEC CHG 2-RC-66 3/4 "
T.C.
2-RC-062 2-RC-003 FC HV 1060 ZS 1060 2RC003 A/S HY 1060 CIAS CLOSES HS 1060 FO 3/4 "-CCB-10 SPEC CHG 2-RC-405 HS 1405 ZS 405 2RC405 M
M 2-RC-403 2RC403 HS 1403 ZS 403 2 1/2 "-BCA-2 2-RC-404 FC ZAH 404 ZS 404 1/2 "-ECC-1 2-RC-023 VENT 3/4 "
PRESSURIZER PRESSURE SAFETY CHANNEL SPEC CHG SPEC CHG 2 1/2 "-BCA-2 ZS 402 ZAH 402 FC 2-RC-402 1/2 "-ECC-1 4"
4"-ECC-1 4"-ECC-1 2-RC-025 VENT 3/4 "
1"-BCA 1"-BCA 2-RC-204 2-RC-206 PT 102 C
SAFETY CHANNELS WITH INDICATION PRESSURE CONTROL SAFETY CHANNELS WITH INDICATION PRESSURE CONTROL PRESSURIZER PT 102 A
PT 100 X
C-21 1"-BCA 2-RC-208 LT 110 X
LEVEL CONTROL 6-29-87 6-29-87 S
2-PMW-319 26020 SH. 5 (F-6) 26021 SH. 2 (C-3) 26023 SH. 1 (H-11) 26020 SH. 5 (C-9) 26024 SH. 1 (E-10) 26020 SH. 5 (A-6) 26017 SH. 1 (F-13)
PI 102 B-1 PCA5 C-02 C-10 LT 103 LI 103-1 LI 103 PCA-5 C-03 SH. 1 (H-8) 26015 SH. 3 (J-11) 26020 SH. 5 (D-11)
I I
HS 1402 HS 1404 HS HS C03F C03F 1402 A
C70A 10"-ECC-1 10"-ECC-1 4"-ECC-1 4"-ECC-1 DRAIN REMOVABLE SPOOL S
S S
S SPEC.
CHG.
SPEC.
CHG.
SPEC.
CHG.
SPEC.
CHG.
TE 421 2-RC-423 2-RC-422 1"-CCA-19 FC FC FC FC 1"-CCA-19 2-RC-425 2-RC-424 HS 1422 HS 1423 CO3 CO3 CO3 CO3 HS 1425 HS 1424 ZS 1422 ZS 1423 ZS 1425 ZS 1424 3/4 "-BCA-5 2-RC-428 2-RC-429 1"-BCA-5 PRESSURIZER SPRAY LINE NITROGEN SUPPLY SUPERSEDES 25203-26014 THRU REVISION 22 S.REINHARDT 26015 SH.3 (G-5,D-10,B-10) 26015 SH.3 (F-4,F-10,H-10)
GC/FAD 11-12-87 SBR 11-12-87 C70B 1404 A
HS HS 1402B 1404B C03F C03F I
I 26014 SH. 1 (G-9)
HS 304C 304C IE 304C IE 404A 404A 404A HS I I I I CO3F CO3F CO3F CO3F 26014 SH. 1 (H-4)
ATWS AMSAC ATWS AMSAC 1/2 "-ECC-1 1/2 "-ECC-1 1/2 "-ECC-1 1/2 "-ECC-1 1/2 "-ECC-1 1"-ECC-1 1/2 "-ECC-1 1/2 "-ECC-1 1/2 "-ECC-1 1/2 "-ECC-1 1/2 "-ECC-1 SH.1 (J-11)
TE421 SPEC.
CHG.
1"-ECD-6 1"-CCD-2 SH. 1 (K-6) 26030 SH. 1 (E-3)
SPEC CHG INSTR.
CL. C-4 3/4 " S.S.
TUBE TO EBFS MANUAL VENT 3/4 " ECD Q.A.
S HV 7690 ZS 7690 2RC45 A/S HY 7690 SPEC CHG 26025 SH. 1 (K-13) 21 2-RC-431 2-RC-432 26074 SH. 1 (H-9) 2-RC-98 X-64 P.A.S.S.
DELAY COIL 2-RC-65 3/8 " SS O.D.
26020 SH.5 (E-9)
SH. 1 (G-10)
SH. 1 (B-10)
PRESSURIZER SURGE LINE REACTOR COOLANT 3/8 "-CCB-10 3/8 "-CCB-10 WATERFORD, CT SAMPLING I
HS 7690 3/4 "
3/8 "-S.S. TUBING 3/4 "
2" TEE (TYP) 2"X1" RED (TYP) 1/2 " O.D. S.S.
1"X 3/4 " RED (TYP) 2"X 1/2 " RED (TYP)
SPEC.
CHG.
SPEC.
CHG.
1/2 " O.D. S.S.
SPEC.
CHG.
SPEC.
CHG.
1/2 " O.D. S.S.
1/2 " O.D. S.S.
1 1/2 "
2"X1" RED (TYP) 1/2 " O.D. S.S.
SPEC.
CHG.
2"X 1/2 " RED 3/8 " O.D. S.S.
1/2 " O.D. S.S.
SPEC.
CHG.
ABBREVIATIONS SEE 26001 SH. 1, 2 & 3.
1" 1"
1"-HCD-37 TO 2-RC-408 3/8 " O.D. SST 3/8 " O.D. SST 1/2 "x 3/8 "
2-PMW-420 2-PMW-421 2-PMW-422 SH. 3 (H-1) 3/8 " O.D.
PRIMARY DRAINS & QUENCH TANKS COOLING LINE SAMPLE 25203-29199 SH.4 25203-29199 SH.5 2-SI-652, 634, 644 25203-29199 SH.6 25203-29199 SH.6 25203-29199 SH.8 SH.1 (J-10) 25203-29199 SH.4 25203-29199 SH.5 2-SI-651, 624, 614 25203-29199 SH.6 25203-29199 SH.5,6 25203-29199 SH.4 TT-115 TT-125 T-105 P-28 3/8 " SS O.D.
1/2 "-CCB-10 2-RC-434 2-RC-435 CONTAINMENT SUMP 3/4 "X 3/8 "
3/8 " SST 3/8 " SST TT 116 TI 116 TA 116 TAH 116 T116 C03
=
L116 P116
=
=
=
P103-1
=
=
P102B1 P103 L103 T109 T101 C03F C13 C72 CIAS CLOSES LC LC 2-RC-45 FC NOTE 3 (SH. 1) 2-RC-440 L.O.
L.C.
2-RC-239 L.O.
F 2-S-739 2-S-738 2-S-737 L-737 1" X 3/8 "
2-S-740 DR.
1" X 3/8 "
N/A 28 FSAR FIGURE SAFETY EVALUATION MAY BE REQUIRED PRIOR TO CHANGES VENT 2-RC-430 3/4 "-HCC-48 HCD HCC SPEC CHG HCC HCD T
2-GR-153 WT-13 CONTAINMENT SUMP SPEC. CHG.
HSD HRD HRD HRC 3/4 "-HRD-8 CHANGES MADE TO THIS P&ID MUST ALSO BE REFLECTED ON THE INSERVICE INSPECTION PROGRAM DRAWING 25203-26700 SH. 10 TIT 101 C03F INCORP. DCN DM2-00-0376-03 MBR DLW CSJ DED 11-21
-03 N/A 29 INCORP. DCN DM2-00-0129-04 DWJ 25203-26014 SH.2 OF 3 DLW 7-13 04 ASK DNT N/A 30 INCORP. DCN DM2-00-0215-05 EAL 30 5-13
-05 RFL WBZ MP REV w:\\mpcad\\cadadmin\\users\\mich652-it\\pdf\\Batch_1\\C260142.DGN 10/31/2005 A
C E
D F
G H
J 3
4 1
2 5
6 7
8 9
10 11 12 13 K
B NO.
DATE REVISIONS BY CHK.
APP.
APP.
REVISIONS DURING CONSTRUCTION BY DATE SCALE CHKD.
DATE APP.
DATE DWG. NO.
APP.
DATE TITLE A
C E
D F
G H
J K
B 5
6 7
8 9
10 11 12 13 NOTE:
MANUAL REVISIONS TO THIS DOCUMENT WHEN AS-BUILT ARE PROHIBITED.
CAD Dominion Nuclear Connecticut, Inc.
Millstone Power Station R