ML062370283

From kanterella
Jump to navigation Jump to search

E-mail, Miller, NRR, to Okeefe, Fple, Requested Clarification of RAI Response
ML062370283
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/22/2006
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLB
To: O'Keefe M
Florida Power & Light Energy Seabrook
References
TAC MD1515
Download: ML062370283 (2)


Text

From:

Ed Miller To:

michael_okeefe@fpl.com Date:

08/22/2006 4:14:51 PM

Subject:

Clarification of RAI response

Mike, The following is a draft clarifying question I received from the reviewer. If needed, I can set up a conference call to discuss this further. This is not an official RAI and does not represent an NRC staff position.

In the response to the fourth request for additional information in their August 16, 2006 letter, FPLE indicated that the primary-to-secondary leak rate assumed in the dose consequence analyses conservatively bounds the expected actual leakage that is inclusive of operational leakage existing prior to the accident plus any increased leakage resulting accident induced changes in primary-to-secondary pressure differential. This wording (as proposed) goes beyond TSTF-449 and is not consistent with operating experience (in which the leakage from a tube can go from a relatively small amount (a few gallons per day) to several hundreds of gallons per minute during normal operation). As a result, please discuss your plans to remove this statement and make your submittal consistent with TSTF-449. The staff notes that the text on page 2 of Insert B3/4.4.5 and page 2 of Insert Bases 3.4.6.2 will need to be changed.

G. Edward Miller Project Manager Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission (301) 415-2481

Mail Envelope Properties (44EB65BB.8C9 : 9 : 35080)

Subject:

Clarification of RAI response Creation Date 08/22/2006 4:14:51 PM From:

Ed Miller Created By:

GXM@nrc.gov Recipients Action Date & Time fpl.com Transferred 08/22/2006 4:15:27 PM michael_okeefe (michael_okeefe@fpl.com)

Post Office Delivered Route fpl.com Files Size Date & Time MESSAGE 1791 08/22/2006 4:14:51 PM TEXT.htm 1689 Options Auto Delete:

No Expiration Date:

None Notify Recipients:

Yes Priority:

Standard ReplyRequested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard To Be Delivered:

Immediate Status Tracking:

Delivered & Opened