August 22, 2006 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - CLOSEOUT OF LICENSEE'S RESPONSE TO GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1647)
Dear Mr. Venable:
By letter dated June 7, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061600210), Entergy Operations, Inc. (the licensee), responded to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations," for the Waterford Steam Electric Station, Unit 3 (Waterford 3). Under oath or affirmation, your response states that Waterford 3 relies on the Hemyc fire barrier system, and you have submitted documentation that you plan to disposition any nonconforming conditions in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.48(c) process. Also, compensatory measures will remain in place until nonconforming conditions have been resolved.
Your response also stated that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current Nuclear Regulatory Commission (NRC) guidance. The basis for your conclusion that these fire barriers have been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
This letter closes out the NRC staff review of your response to GL 2006-03 for Waterford 3. If you have any questions regarding this letter, please contact me at 301-415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc: See next page
August 22, 2006 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - CLOSEOUT OF LICENSEE'S RESPONSE TO GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1647)
Dear Mr. Venable:
By letter dated June 7, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061600210), Entergy Operations, Inc. (the licensee), responded to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations," for the Waterford Steam Electric Station, Unit 3 (Waterford 3). Under oath or affirmation, your response states that Waterford 3 relies on the Hemyc fire barrier system, and you have submitted documentation that you plan to disposition any nonconforming conditions in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.48(c) process. Also, compensatory measures will remain in place until nonconforming conditions have been resolved.
Your response also stated that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current Nuclear Regulatory Commission (NRC) guidance. The basis for your conclusion that these fire barriers have been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
This letter closes out the NRC staff review of your response to GL 2006-03 for Waterford 3. If you have any questions regarding this letter, please contact me at 301-415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc: See next page DISTRIBUTION PUBLIC LPLIV R/F RidsNrrLAJBurkhardt RidsNrrDorl (CHaney/CHolden)
RidsOgcRp RidsNrrPMBSingal RidsNrrDorlLpl4 (DTerao)
QNguyen, DPR RidsNrrDraAfpb RidsNrrPMMField CMoulton, DRA s DFrumkin, DRA RidsAcrsAcnwMailCenter RidsRegion4MailCenter (DGraves)
ADAMS Accession Number: ML062300315 OFFICE NRR/LPL4/PM NRR/LPL4/LA AFPB/BC NRR/LPL4/BC NAME MFields LFeizollahi SWeerakkody DTerao DATE 8/8/06 8/8/06 8/14/06 8/22/06 OFFICIAL RECORD COPY
May 2006 Waterford Steam Electric Station, Unit 3 cc:
Vice President Operations Support Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn LLP 1700 K Street, N.W.
Washington, DC 20006 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697 Richard Penrod, Senior Environmental Scientist State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497