ML062260123

From kanterella
Jump to navigation Jump to search

Exemption from the Requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix
ML062260123
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/09/2006
From: Milano P
NRC/NRR/ADRO/DORL/LPLI-1
To: Spina J
Calvert Cliffs
Milano P, NRR/DORL/LPLA, 415-1457
References
TAC MC9615, TAC MC9616
Download: ML062260123 (9)


Text

November 9, 2006 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 -

EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.46 AND 10 CFR PART 50, APPENDIX K (TAC NOS. MC9615 AND MC9616)

Dear Spina:

The Commission has approved the enclosed exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.46 and Appendix K, for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 during the next operating cycle, which is cycle 19 for Unit No. 1 and cycle 17 for Unit No. 2. This action is in response to your application dated January 19, 2006, that requested a temporary exemption to allow the re-insertion of up to four lead test assemblies (LFAs) in either Unit 1 or Unit 2 core. Two of the LFAs were manufactured by Westinghouse Electric Company and contain a limited number of fuel rods clad with advanced zirconium-based alloys. The other two LFAs were manufactured by Framatome ANP, Inc. with fuel rod cladding material as M5 alloy. These LFAs were originally inserted into the Unit 2 core in April of 2003 (operating cycles 15 and 16).

A copy of the exemption is enclosed. The exemption has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Patrick D. Milano, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Exemption cc w/encl: See next page

November 9, 2006 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 -

EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.46 AND 10 CFR PART 50, APPENDIX K (TAC NOS. MC9615 AND MC9616)

Dear Spina:

The Commission has approved the enclosed exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.46 and Appendix K, for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 during the next operating cycle, which is cycle 19 for Unit No. 1 and cycle 17 for Unit No. 2. This action is in response to your application dated January 19, 2006, that requested a temporary exemption to allow the re-insertion of up to four lead test assemblies (LFAs) in either Unit 1 or Unit 2 core. Two of the LFAs were manufactured by Westinghouse Electric Company and contain a limited number of fuel rods clad with advanced zirconium-based alloys. The other two LFAs were manufactured by Framatome ANP, Inc. with fuel rod cladding material as M5 alloy. These LFAs were originally inserted into the Unit 2 core in April of 2003 (operating cycles 15 and 16).

A copy of the exemption is enclosed. The exemption has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Patrick D. Milano, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Exemption cc w/encl: See next page DISTRIBUTION:

PUBLIC S. Little RidsNrrLASLittle LPL1-1R/F S. Wu R. Laufer RidsNrrDorlLplI-1 B. McDermott RidsRgn1MailCenter F. Akstulewicz RidsNrrDssSnpb OGC RidsOgcRp P. Milano RidsNrrPMPMilano ACRS RidsAcrsAcnwMailCenter Accession Number: ML062260123 OFFICE LPLI-1/PM LPLI-1/PM LPLI-1/LA SNPB/BC OGC LPLI-1/BC DORL/D NAME BSingal PMilano SLittle FAkstulewicz MBarkman RLaufer CHaney DATE 08/14/06 11/06/06 11/08/06 07/14/06 10/18/06 11/8/06 11/ 9/06 OFFICIAL RECORD COPY

Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 cc:

President Ms. Patricia T. Birnie, Esquire Calvert County Board of Co-Director Commissioners Maryland Safe Energy Coalition 175 Main Street P.O. Box 33111 Prince Frederick, MD 20678 Baltimore, MD 21218 Mr. Carey Fleming, Esquire Mr. Roy Hickok Sr. Counsel - Nuclear Generation NRC Technical Training Center Constellation Generation Group, LLC 5700 Brainerd Road 750 East Pratt Street, 17th floor Chattanooga, TN 37411-4017 Baltimore, MD 21202 Mr. Louis Larragoite Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. R. I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Department of Natural Resources 580 Taylor Avenue (B wing, 3rd floor)

Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Ms. Kristen A. Burger, Esquire Maryland People's Counsel 6 St. Paul Centre Suite 2102 Baltimore, MD 21202-1631

7590-01-P UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION CALVERT CLIFFS NUCLEAR POWER PLANT, INC.

CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-317 AND 50-318 EXEMPTION

1.0 BACKGROUND

Calvert Cliffs Nuclear Power Plant, Inc. (the licensee), is the holder of Renewed Facility Operating License Nos. DPR-53 and DPR-69, which authorize operation of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (Calvert Cliffs 1 and 2), respectively. The license provides, among other things, that the facility is subject to all rules, regulations, and orders of the Nuclear Regulatory Commission (NRC, the Commission) now or hereafter in effect.

The facility consists of two pressurized-water reactors located in Calvert County in Maryland.

2.0 REQUEST/ACTION Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, requires, in part, that each boiling or pressurized light-water nuclear power reactor fueled with uranium oxide pellets within cylindrical zircaloy or ZIRLO cladding must be provided with an emergency core cooling system (ECCS) that must be designed so that its calculated cooling performance following postulated loss-of-coolant accidents [LOCAs] conforms to the criteria set forth in paragraph (b) of this section. Appendix K, ECCS Evaluation Models, to

10 CFR Part 50 requires, in part, that the rate of energy release, hydrogen generation, and cladding oxidation from the metal/water reaction shall be calculated using the Baker-Just equation. The Baker-Just equation assumes that the cladding material is composed of either zircaloy or ZIRLO.

By letter dated January 19, 2006, the licensee requested an exemption from the requirements of 10 CFR 50.46 and Appendix K to 10 CFR Part 50 to allow the use of fuel rods clad with advanced zirconium-based alloys from Westinghouse Electric Company and M5 alloy from Framatome ANP, Inc. The advanced zirconium-based and M5 alloys are proprietary alloys and are chemically different from zircaloy or ZIRLO fuel cladding materials, which are approved for use.

The licensee has requested the exemption to support the re-insertion of up to four lead fuel assemblies (LFAs) in the core of either Calvert Cliffs 1 or Calvert Cliffs 2 during the next operating cycle, which is cycle 19 for Unit 1 and cycle 17 for Unit 2. The NRC staff has previously approved the irradiation of 8 LFAs for 2 operating cycles (cycles 15 and 16) in Calvert Cliffs 2, as documented in NRC letter dated April 11, 2003. The licensee has indicated that the LFAs placed back in the core for a third cycle will not exceed the peak fuel rod burnup limitation of 60,000 MWD/MTU and will meet all applicable reload design criteria. The LFAs will be placed in low duty cycle locations on the core periphery to assess the grid-to-rod fretting performance. The other four LFAs will be discharged to the spent fuel pool for detailed post-irradiation examinations. Because the core design is not complete yet, the licensee indicated that, if the Calvert Cliffs 2 cycle 17 core cannot accommodate the LFAs, then the planned alternative is to design the Calvert Cliffs 1 cycle 19 core so that the LFAs can be inserted.

In summary, 10 CFR 50.46 and 10 CFR Part 50, Appendix K make no provisions for use of fuel rods clad in a material other than zircaloy or ZIRLO. Since the material specifications of

the advanced zirconium-based and M5 alloys differ from the specification for Zircaloy or ZIRLO, a plant-specific exemption is required to support the use of the four LFAs in Unit 1 or 2.

3.0 DISCUSSION Pursuant to 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 50, when (1) the exemptions are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security; and (2) when special circumstances are present. Under Section 50.12(a)(2), special circumstances include, among other things, when application of the specific regulation in the particular circumstance would not serve, or is not necessary to achieve, the underlying purpose of the rule.

Authorized by Law This exemption would allow the licensee to re-insert up to four LFAs, which contain some fuel rods clad with advanced zirconium-based and M5 alloys that do not meet the definition of Zircaloy or ZIRLO as specified by 10 CFR 50.46, in either Calvert Cliffs 1 or 2. As stated above, 10 CFR 50.12 allows the NRC to grant exemptions from the requirements of 10 CFR Part 50. The NRC staff has determined that granting of the licensees proposed exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, or the Commissions regulations. Therefore, the exemption is authorized by law.

No Undue Risk to Public Health and Safety The underlying purposes of 10 CFR 50.46 is to establish acceptance criteria for ECCS performance. Previously, the Westinghouse safety evaluation (WCAP-15874-NP, Revision 0, Safety Analysis Report for Use of Improved Zirconium-based Cladding Materials in Calvert Cliffs Unit 2 Batch T Lead Fuel Assemblies, dated April 2002) and approved Framatome ANP topical report (BAW-10227P-A, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Framatome Cogema Fuels, February 2000) demonstrated the

acceptability of the advanced zirconium-based and M5 cladding under LOCA conditions. The unique features of the LFAs were evaluated for effects on the LOCA analysis. The results showed that the LFAs would not adversely affect the ECCS performance. Since the current four LFAs will be located at non-limiting core locations, the licensee concludes that the LOCA safety analyses will remain bounding for these LTAs for Calvert Cliffs Units 1 and 2.

Paragraph I.A.5 of Appendix K to 10 CFR Part 50 states that the rates of energy, hydrogen concentration, and cladding oxidation from the metal-water reaction shall be calculated using the Baker-Just equation. Since the Baker-Just equation presumes the use of zircaloy clad fuel, strict application of the rule would not permit use of the equation for the advanced zirconium-based and M5 alloys for determining acceptable fuel performance. The underlying intent of this portion of the Appendix, is to ensure that analysis of fuel response to LOCAs is conservatively calculated. The Westinghouse safety evaluation and approved Framatome ANP topical report show that due to the similarities in the chemical composition of the advanced zirconium-based and M5 alloys and zircaloy, the application of the Baker-Just equation in the analysis of the advanced zirconium-based and M5 clad fuel rods will continue to conservatively bound all post-LOCA scenarios. Thus, application of Appendix K, Paragraph I.A.5 is not necessary for the licensee to achieve its underlying purpose in these circumstances.

Based on the above, no new accident precursors are created by the exemption to allow use of advanced zirconium-based and M5 alloy clad fuel, thus, the probability of postulated accidents is not increased. Also, based on the above, the consequences of postulated accidents are not increased. Therefore, there is no undue risk [since risk is probability x consequences] to public health and safety.

Consistent with Common Defense and Security The proposed exemption would allow the use of LFAs with advanced cladding materials.

This change to the plant core configuration has no relation to security issues. Therefore, the common defense and security is not impacted by this exemption.

Special Circumstances Special circumstances, in accordance with 10 CFR 50.12(a)(2)(ii), are present whenever application of the regulation in the particular circumstances is not necessary to achieve the underlying purpose of the rule. The underlying purpose of 10 CFR 50.46 and Appendix K to 10 CFR Part 50 is to establish acceptance criteria for ECCS performance. The licensee stated that the wording of the regulations renders the criteria of 10 CFR 50.46 and Appendix K inapplicable to the advanced zirconium-based cladding, even though the Westinghouse safety evaluation and the approved Framatome ANP topical reports show that the intent of the regulations are met. Therefore, since the underlying purpose of 10 CFR 50.46 and Appendix K to 10 CFR Part 50 is achieved with the use of the advanced zirconium-based cladding, the special circumstances required by 10 CFR 50.12(a)(2)(ii) for granting of an exemption from 10 CFR 50.46 and Appendix K exist.

4.0 CONCLUSION

Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12(a), the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security. Also, special circumstances are present. Therefore, the Commission hereby grants the licensee an exemption from the requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix K with respect to the use of LFAs with advanced zirconium-based alloy cladding (already irradiated for two cycles at Calvert Cliffs 1 during cycle 19 or Calvert Cliffs 2 during cycle 17).

Pursuant to 10 CFR 51.32, the Commission has determined that the granting of this exemption will not have a significant effect on the quality of the human environment (71 FR 64747).

This exemption is effective upon issuance.

Dated at Rockville, Maryland, this 9th day of November 2006.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation