ML062220027

From kanterella
Jump to navigation Jump to search
Notice of Meeting with SCE to Discuss Sampling Plan for Songs-1 Off-Shore Piping
ML062220027
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/10/2006
From: James Shepherd
NRC/NMSS/DWMEP/DD
To: Mcconnell K
NRC/NMSS/DWMEP/DD
Shepherd J, NMSS/DMWEP, 415-6712
References
Download: ML062220027 (7)


Text

August 10, 2006 MEMORANDUM TO:

Keith I. McConnell, Deputy Director Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards FROM:

James Shepherd, Project Engineer Decommissioning Directorate /RA/

Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards

SUBJECT:

MEETING WITH SCE TO DISCUSS SAMPLING PLAN FOR SONGS-1 OFF-SHORE PIPING DATE & TIME:

Tuesday August 22, 2006 1:00 p.m. - 4:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O6 B6 Rockville, Maryland Bridge line (800)638-8081 or (301)231-5539, pass code 4048#

PURPOSE:

Discuss Southern California Edisons Sampling Plan for the Former Intake and Discharge Piping for San Onofre Unit 1.

CATEGORY:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Material Safety and Safeguards (NMSS) and Region IV.

NRC SCE C. Craig D. Pilmer C. McKenney et. al.

J. Shepherd T. Youngblood et. al.

K. McConnell 2

Docket No. 50-206 cc: SONGS Service List MEETING CONTACT: J. C. Shepherd, NMSS/DWMEP, jcs2@nrc.gov, 301-415-6712

Enclosure:

Meeting Agenda

K. McConnell 2

Docket No. 50-206 cc: SONGS Service List MEETING CONTACT: J. C. Shepherd, NMSS/DWMEP, jcs2@nrc.gov, 301-415-6712

Enclosure:

Meeting Agenda DISTRIBUTION:

PUBLIC DCD R/F LCamper OPA DSpitzber, Region IV REvans, Region IV ML062220027 OFFICE DCD:PM DCD: SC NAME JShepherd CCraig DATE 08/10/2006 08/10/2006 OFFICIAL RECORD COPY

SONGS CC LIST:

Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA 92504 Eileen M. Teichert, Esq.

Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Raymond Waldo, Vice President, Nuclear Generation Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814 Douglas K. Porter, Esq.

Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Daniel P. Breig, Station Manager Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 A. Edward Scherer Southern California Edison San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Brian Katz, Vice President, Nuclear Oversight and Regulatory Affairs Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0

Enclosure AGENDA FOR SONGS MEETING 1:00 p.m. - 4:00 p.m. Aug. 22, 2006 One White Flint North Room 6-B6 TIME ITEM PRESENTERS 1:00 - 1:10 Introduction of Participants All 1:10 - 2:20 Sampling Plan - Off-Shore Piping SCE 2:20 - 3:45 Comments and Discussion on Proposed Sampling Plan All 3:45 - 4:00 Conclusion/Adjournment All