ML062190465

From kanterella
Jump to navigation Jump to search
Summary of the July 31, 2006, Public Meeting to Dscuss the Braidwood Unit 1 and 2 End-of-Cycle Plant Performance Assessment
ML062190465
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/02/2006
From: Richard Skokowski
NRC/RGN-III/DRP/RPB3
To:
References
Download: ML062190465 (5)


Text

August 2, 2006 LICENSEE: Exelon Generation Company, LLC FACILITY: Braidwood Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE JULY 31, 2006, PUBLIC MEETING TO DISCUSS THE BRAIDWOOD UNITS 1 AND 2 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 31, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Reed-Custer High School in Braidwood, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRCs assessment of Braidwood Unit 1 and 2s safety performance for the period from January 1 through December 31, 2005. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML061860739 and ML062140587, respectively. A list of NRC and licensee meeting participants and other attendees can be found in the attached Enclosure.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Braidwood Unit 1 and 2s performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter as ML060610281. As part of this regulatory performance meeting, Exelon briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and Exelon representatives.

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77

Enclosure:

As Stated See Attached Distribution

DOCUMENT NAME: E:\FileNET\ML062190465.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME LKillian:dtp RSkokowski

  • MAW for DATE 08/02/06 08/02/06 OFFICIAL RECORD COPY

Exelon Generation Company, LLC cc w/encl: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission

Exelon Generation Company, LLC ADAMS Distribution:

DXC1 RFK RidsNrrDirsIrib GEG KGO SPR DRPIII DRSIII PLB1 TXN

Enclosure Meeting Participants NRC R. Skokowski, Chief, Branch 3, Division of Reactor Projects S. Ray, Senior Resident Inspector, Braidwood G. Roach, Resident Inspector, Braidwood S. Orth, Division of Reactor Safety Health Physics Team Leader V. Mitlyng, Public Affairs Officer L. Killian, Reliability and Risk Engineer Exelon Generation Company K. Polson, Site Vice President G. Boerschig, Plant Manager D. Behyak C. Nesbit J. Odeen K. Rosen E. Port, RSSI-Excelon contract Illinois Emergency Preparedness Management Agency M. Perry, Resident Inspector Local Officials J. Zilm, Mayor of Braceville, IL J. Cosgrove, Godley Park District Director/Godley Public Water District B. Floyt, Water District D. Rozak, Will County Board District 6 B. Havre, Village of Godley Trustee T. Hogan, Consultant to Will County F. Blatteaux