Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station to Present Main Steam and Feedwater Isolation System (Msfis) Controls Replacement Project
ML061810456
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/12/2006
From: Donohew J
NRC/NRR/ADRO/DORL/LPLIV
To:
Donohew J N, NRR/DLPM,415-1307
References
Download: ML061810456 (6)


Text

July 12, 2006 LICENSEE: Wolf Creek Nuclear Operating Corporation (WCNOC, the licensee)

FACILITIES: Wolf Creek Generating Station

SUBJECT:

MEETING WITH REPRESENTATIVES OF WOLF CREEK NUCLEAR OPERATING CORPORATION FOR WOLF CREEK GENERATING STATION A meeting was held on Wednesday, June 28, 2006, between the Nuclear Regulatory Commission (NRC) staff and representatives of WCNOC for Wolf Creek Generating Station (WCGS). The meeting was held at the request of the licensee for WCNOC to present its Main Steam and Feedwater Isolation System (MSFIS) Controls Replacement Project. This presentation is not part of any license amendment request submitted by the licensee to the NRC. The notice for the meeting was issued on June 14, 2006.

The licensee is intending to replace the existing (1) hydraulically-operated actuators for the main steam isolation valves (MSIVs) and main feedwater isolation valves (MFIVs), (2) MSIV and MFIV bodies, and (3) MSFIS controls in the refueling outage scheduled for the spring of 2008. The purpose of the meeting was to explain the project to the NRC, and when the license application requests (LARs) were likely to be submitted for NRC review and approval. This would include upgrading the existing MSFIS controls. is the list of attendees. Enclosure 2 is the material handed out by the licensee.

There was no handout from the NRC staff.

The agenda for the meeting is the following, which is the second page of Enclosure 2 (Agencywide Documents Access and Management System Accession No. ML061800029):

  • MSFIS Replacement Project (page 3 of Enclosure 2)
  • Current MSFIS Controls (pages 4 through 6)
  • Replacement MSFIS Controls (pages 7 and 8)
  • Advanced Logic System (pages 9 through 13)
  • Development Team and Development Process (pages 14 through 17)
  • Regulatory Process (pages 18 and 19)
  • Questions (page 20)

The slides for the licensee's presentation are given in Enclosure 2. The page numbers for the slides are given in the above agenda and Enclosure 2. An important part of the meeting was the presentation of the project milestones on page 17 of Enclosure 2, which shows the current schedule for submitting the MSFIS LAR in March 2007. This is about a year before the schedule to install the new MSFIS at WCGS. The licensee stated that it is currently in the early part of the Requirements Phase of the project, as shown on page 16 of Enclosure 2.

In the discussion on the MSFIS Controls Project Team, which is page 15 of Enclosure 2, the licensee stated that the lines on the page, between the Validation and Verification (V&V) and the Qualification functions and the project manager, represent information flow paths to the project manager and not that the people performing these functions in the MSFIS Replacement Project report to the project manager. The people would report to management separate from the project manager to prevent any conflicts of interests and provide independence between the project functions, and the V&V and quality assurance functions. The licensee stated that the slide of the organization chart on page 15 of Enclosure 2 was both misleading and incorrect in terms of who reports to the project manager for the MSFIS Controls Replacement Project. The lines on the slide were only to show how the project information from different technical areas flowed up to the project manager and was not to show who reported to whom. The licensee agreed to provide an updated slide of page 15's chart at the next meeting with the NRC staff.

The NRC staff completed its discussion of the licensee's presentation. There were no members of the public in attendance.

Please direct any inquires to me at 301-415-1307, or jnd@nrc.gov.

/RA/

Jack Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482

Enclosures:

1. List of Meeting Attendees
2. Licensee's Handout cc w/encls: See next page

In the discussion on the MSFIS Controls Project Team, which is page 15 of Enclosure 2, the licensee stated that the lines on the page, between the Validation and Verification (V&V) and the Qualification functions and the project manager, represent information flow paths to the project manager and not that the people performing these functions in the MSFIS Replacement Project report to the project manager. The people would report to management separate from the project manager to prevent any conflicts of interests and provide independence between the project functions, and the V&V and quality assurance functions. The licensee stated that the slide of the organization chart on page 15 of Enclosure 2 was both misleading and incorrect in terms of who reports to the project manager for the MSFIS Controls Replacement Project. The lines on the slide were only to show how the project information from different technical areas flowed up to the project manager and was not to show who reported to whom. The licensee agreed to provide an updated slide of page 15's chart at the next meeting with the NRC staff.

The NRC staff completed its discussion of the licensee's presentation. There were no members of the public in attendance.

Please direct any inquires to me at 301-415-1307, or jnd@nrc.gov.

/RA/

Jack Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482

Enclosures:

1. List of Meeting Attendees
2. Licensee's Handout cc w/encls: See next page DISTRIBUTION:

PUBLIC SO'Connor, EDO RIV LPLIV Reading RidsRgn4MailCenter RidsNrrDorl (CHaney/CHolden) RidsNrrDeEicb (AHowe)

RidsNrrDorlLpl4 (DTerao) PLoeser, EICB RidsNrrPMJDonohew PRebstock, EICB RidsNrrLALFeizollahi NCarte, EICB RidsOgcRp WKemper, IEEB RidsAcrsAcnwMailCenter MWaterman, IEEB RJasinski, NRR ADAMS ACCESSION NO. ML061810456 OFFICE LPL4/PM LPL4/LA EICB/BC LPL4/BC NAME JDonohew LFeizollahi AHowe DTerao DATE 07/12/06 07/12/06 7/11/06 07/12/06 OFFICIAL RECORD COPY

LIST OF ATTENDEES AT MEETING OF JUNE 28, 2006 WITH WOLF CREEK NUCLEAR OPERATING CORPORATION NAME AFFILIATION J. Donohew NRC/NRR/LPLIV A. Howe NRC/NRR/EICB P. Rebstock NRC/NRR/EICB P. Loeser NRC/NRR/EICB N. Carte NRC/NRR/EICB W. Kemper NRC/RES/IEEB M. Waterman NRC/RES/IEEB D. Hooper WCNOC S. Wideman WCNOC P. Guevel WCNOC G. Clarkson WCNOC S. Sorensen CS Innovations (WCNOC contractor)

T. Harris STARS Where: EICB = Instrumentation and Controls Branch IEEB = Instrumentation and Electrical Engineering Branch LPLIV = Plant Licensing Branch IV NRC = Nuclear Regulatory Commission NRR = Office of Nuclear Reactor Regulation RES = Office of Nuclear Regulatory Research STARS = Strategic Teaming and Resource Sharing WCNOC = Wolf Creek Nuclear Operating Corporation ENCLOSURE 1

LICENSEE'S HANDOUT FOR JUNE 28, 2006, MEETING ADAMS* ACCESSION NO. ML061800029 The licensee's handout (20 pages) contained the following:

1. Title (page 1)
2. Agenda (page 2)
3. Project Overview (page 3)
4. Current MSFIS** Controls (pages 4 through 6)
5. Replacement MSFIS Controls (pages 7 through 13)
6. Development Process (pages 14 through 17)
7. Regulatory Process (pages 18 and 19)
8. Questions (page 20)
  • = Agencywide Documents Access and Management System

ENCLOSURE 2

Wolf Creek Generating Station cc:

Jay Silberg, Esq. Vice President Operations/Plant Manager Pillsbury Winthrop Shaw Pittman LLP Wolf Creek Nuclear Operating Corporation 2300 N Street, NW P.O. Box 411 Washington, D.C. 20037 Burlington, KS 66839 Regional Administrator, Region IV Supervisor Licensing U.S. Nuclear Regulatory Commission Wolf Creek Nuclear Operating Corporation 611 Ryan Plaza Drive, Suite 400 P.O. Box 411 Arlington, TX 76011 Burlington, KS 66839 Senior Resident Inspector U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant P.O. Box 311 8201 NRC Road Burlington, KS 66839 Steedman, MO 65077-1032 Chief Engineer, Utilities Division Mr. Rick A. Muench Kansas Corporation Commission President and Chief Executive Officer 1500 SW Arrowhead Road Wolf Creek Nuclear Operating Corporation Topeka, KS 66604-4027 Post Office Box 411 Burlington, KS 66839 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 February 2006