ML061810093
| ML061810093 | |
| Person / Time | |
|---|---|
| Site: | Crane (DPR-050) |
| Issue date: | 01/19/2007 |
| From: | Farideh Saba NRC/NRR/ADRO/DORL/LPLI-2 |
| To: | Crane C AmerGen Energy Co |
| SABA F, NRR/DORL/LPLI-2, 415-1453 | |
| References | |
| GL-06-003, TAC MD1641 | |
| Download: ML061810093 (4) | |
Text
January19, 2007 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RECEIPT OF AMERGEN RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1641)
Dear Mr. Crane:
The Nuclear Regulatory Commission (NRC) acknowledges receipt of AmerGen Energy Company, LLCs (AmerGen or the licensee) response to Generic Letter (GL) 2006-03 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML053620142), Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. In the response, dated June 6, 2006 (ADAMS Accession No. ML061640343), AmerGen stated that neither Hemyc nor MT fire barrier materials are used at Three Mile Island, Unit 1 (TMI-1).
AmerGen stated that TMI-1 uses fire barriers other than Hemyc or MT. All fire barriers used to separate redundant safe shutdown trains located within the same fire area at TMI-1 are described in the licensees responses to GL 92-08 (ADAMS Accession No. ML031134250),
Thermo-Lag 330-1 Fire Barriers. AmerGens letters dated December 30, 1999, and March 12, 2000 (ADAMS Accession Nos. ML003676460 and ML003693928, respectively), state that TMI-1's corrective actions associated with GL 92-08 have been completed and that these barriers are rated as required by the licensing basis. The basis for stating that these other fire barriers have been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please do not hesitate to contact me.
Sincerely,
/RA/
Farideh E. Saba, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: See next page
Three Mile Island Nuclear Station, Unit 1 cc:
Site Vice President - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Senior Vice President - Nuclear Services AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Operations, Mid-Atlantic AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Senior Resident Inspector (TMI-1)
U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Plant Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057 Ronald Bellamy, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Michael A. Schoppman Framatome ANP Suite 705 1911 North Ft. Myer Drive Rosslyn, VA 22209 Vice President, General Counsel and Secretary AmerGen Energy Company, LLC 2301 Market Street, S23-1 Philadelphia, PA 19101
Three Mile Island Nuclear Station, Unit 1 cc:
Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Eric Epstein TMI Alert 4100 Hillsdale Road Harrisburg, PA 17112 Correspondence Control Desk AmerGen Energy Company, LLC P.O. Box 160 Kennett Square, PA 19348 Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Assistant General Counsel AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348
ML061640343), AmerGen stated that neither Hemyc nor MT fire barrier materials are used at Three Mile Island, Unit 1 (TMI-1).
AmerGen stated that TMI-1 uses fire barriers other than Hemyc or MT. All fire barriers used to separate redundant safe shutdown trains located within the same fire area at TMI-1 are described in the licensees responses to GL 92-08 (ADAMS Accession No. ML031134250),
Thermo-Lag 330-1 Fire Barriers. AmerGens letters dated December 30, 1999, and March 12, 2000 (ADAMS Accession Nos. ML003676460 and ML003693928, respectively), state that TMI-1's corrective actions associated with GL 92-08 have been completed and that these barriers are rated as required by the licensing basis. The basis for stating that these other fire barriers have been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please do not hesitate to contact me.
Sincerely,
/RA/
Farideh E. Saba, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: See next page DISTRIBUTION:
PUBLIC RidsRgn1MailCenter RidsNrrDorl LPL1-2 R/F RidsNrrDorlLpl1-2 RidsNrrPMFSaba AFPB RidsRgn1MailCenter RidsNrrLACRaynor RidsAcrsAcnwMailCenter ADAMS ACCESSION NUMBER: ML061810093 OFFICE LPL1-2\\PM LPL1-2\\LA AFPB\\BC LPL1-2\\BC NAME FSaba CRaynor SWeerakkody HChernoff DATE 01/11/07 01/09/07 01/11/07 1/19/07