ML061700072

From kanterella
Jump to navigation Jump to search
Init Exam - 03/2006 - Draft Operating Outline
ML061700072
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/23/2005
From: Gody A
Operations Branch IV
To: Muench R
Wolf Creek
References
50-482/06-301, ES-301, Rev 9, ES-301-2 50-482/06-301
Download: ML061700072 (8)


Text

ES-301,Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 System / JPM Title Type Code* Safety Function

a. Establish Alternate High Injection using EMG FR-C2 (ESF) S-I NAS 2
b. Re-energize Safety Related Bus NB02 using OFN NB-030 S-2 NS 6
c. Control Room Not Habitable, Control at Aux Shutdown Panel S-3 MSAL 4 SRO f.

g.

h.

1 Implant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Perform local actions for Emergency Boration (2001 Exam) P-I DEARP 1 j.
k. Align Fire Protection System to the Condensate Storage Tank P-3 DE 8
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 14-6 I 2-3 (C)ontrol room (D)irect from bank 19/18/24 (E)mergency or abnormal in-plant 2 1 I2 1 / 2 1 (L)ow-Power / Shutdown 2 1/21/ 2 l (N)ew or (M)odified from bank including 1(A) 22/22/21 (P)revious 2 exams 1 3 / 2 3 I 1 2 (randomly selected)

(WA 21/21/21 (S)imulator

Appendix D, Rev. 9 Scenario Outline Form ES-D-I

/I Facility: Wolf Creek Generatina Station Examiners:

Scenario No.: 1 (New)

Operators:

Op-Test No.: 1 1 Initial Conditions: 55% Dower, B Main Feed PumD (MFP) rollina at 1100 rDm

/ Turnover: Place 2dMFP on line, maintain current Dower for flux maD I I Malf. No. Event Type*

Event Description 1 1 1 NIA N-BOP I Place 2dMFP on line 2 mPCS02A R-ATC Turbine Impulse Pressure AC PT-505 fails low causing control rod insertion.

3 mMSSOlC2 I-BOP C SG Pressure Instrument fails low, affecting Steam Flow indication and MFP Speed Control.

4 mCCW 18B C-ATC Component Cooling Water System (CCW) Leak in the B Train Safety C-BOP Loop. Requires removing ByTrain CCW and ECCS pumps from service.

5 mRCS07B M Small Break LOCA, Safety Injection mCCW06A C-ATC A Train CCW pump A trips on SI and the C pump fails to autostart.

r 19064B C-BOP Containment Isolation Phase A fails to automatically actuate

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D, Rev. 9 Scenario Outline Form ES-D-1 Facility: Wolf Creek Generatina Station Scenario No.: 2 l M o d l Op-Test No.: 1:

Examiners: Operators:

(1 Initial Conditions: 10Oo/o Dower, Normal Ouerations Turnover: , A Emeraencv Diesel Generator (EDG) is Out of Service.

Severe Thunder Storm Watch in Effect for Coffev Countv.

Event Malf. No. Event Event No. Type* Description 1 mWAT06 R-ATC Circ Water Pump A trips causing a Main Turbine Setback to 80%.

I A I I I mPRSO1A I I-ATC I Pressurizer Pressure Instrument fails high 3 P24100C C-ATC Instrument Air to Containment,KA HV-29, fails closed causing a loss of P24 1OOD normal charging and letdown.

4 mRCS02A M 330 gpm Steam Generator Tube Rupture on A Both Essential Service Water Pumps fail to automatically start on Safety P19028B Injection Block Valve BB HV-8000B fails to open, affecting RCS depressurization.

Requires entry into contingencyprocedure EMG C-33 for SGTR with Loss of Pressure Control.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D,Rev. 9 Scenario Outline Form ES-D-1 Facility: Wolf Creek Generatina Station Scenario No.: B/U (Bank) Op-Test No.: 1.

Examiners: Operators:

Initial Conditions: 100% Dower, Normal operations Turnover: Normal Charaina PumD and A AFW Dump are out of service Event Description 1 mPRSO1B I-ATC Pressurizer Pressure Channel for lower selected channel fails high, affects only one PORV and not the Master Pressure Controller mFWMO5 C-BOP A Main Feed Pump speed controller fails low A

Small Break LOCA 1 4 I various I C-ATC Automatic Safety Injection fails to actuate on both trains, Manual available

~ ~~

A and B Charging pumps trip on safety injection, A and B Safety Injection P17027B pumps fail to start automatically. This results in no High Head or mCVC13A Intermediate Head Injection. The Safety Injection pumps may be manually mCVC 13B started.

A Steam Generator Atmospheric Relief valve fails open post trip.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

ES-301, Rev. 9 Administrative Topics Outline Form ES-301-1 Facility: Wolf Creek Generatincl Station Date of Examination: 03/06/2006 Examination Level: RO I Administrative Topic (seeNote) ~

Type Code*

Describe activity to be perFormed Conduct of Operations Perform Surveillance STS BG-001, Boron Injection Flow 2.1.20 NS Path Verification, on the Simulator.

I (A1.a)

Conduct of Operations Determine Time to Boil and Core Uncovery based on a 2.1.25 PR loss of Shutdown Cooling.

(A1.b) (2001 SRO Admin)

Equipment Control Prepare a Clearance Order to remove a leaking pump 2.2.13 NR from service.

Radiation Control Given a Radiological Survey Map and Radiation Work 2.3.1 MR Permit determine the Radiological conditions and controls (A31 required.

Emergency Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (I 3 for ROs; 5 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 1)

(P)revious 2 exams ( I 1; randomly selected)

ES-301, Rev. 9 Administrative Topics Outline Form ES-301-1 Facility: Wolf Creek Generatincl Station Date of Examination: 03/06/2006 Examination Level: SRO Operating Test Number: 2 Administrative Topic Type Describe activity to be performed Code*

Conduct of Operations One licensed operator had to leave shift. Determine from 2.1.5 NR a list which operators could be called in without getting (A1.a) permission for exceeding work hour limitations.

Conduct of Operations Determine Time to Boil and Core Uncovery based on a 2.1.25 PR loss of Shutdown Cooling.

(A1.b) (2001 SRO Admin) l Equipment Control NR Review a Clearance Order for approval and identify the errors.

Radiation Control MR Given a Radiological Survey Map and Radiation Work 2.3.1 Permit determine the Radiological conditions and controls (A31 required.

Emergency Plan After completing a dynamic scenario on the simulator, 2.4.41 MS make the correct Emergency Plan Classification for the (A41 events.

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

~ _ _ _ _ _

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (I 3 for ROs; I 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 1)

(P)revious 2 exams (I 1; randomly selected)

ES-301,Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Exam Level: RO Operating Test No.: 1 Control Room Systems@(8 for RO); (7 for SRO-I); ( 2 or 3 for SRO-U, including 1ESF)

System / JPM Title Type Code* Safety Function

a. Establish Alternate High Injection using EMG FR-C2 S-I NAS 2
b. Re-energize Safety Related Bus NB02 using OFN NB-030 S-2 NS 6
c. Increase ECCS Accumulator Pressure (2001 Exam) S-3 DSLP 3
d. Rad Monitors Re-27/28 alarm, FBlS fails to actuate S-4 NALS 7
e. Start up a Containment Mini-Purge S-5 DS 8
f. Recover a mis-aligned rod using OFN SF-011. S-6 NS 1
g. Swap Containment Spray pumps to Containment Sumps S-7 NAS 5 I
h. Feed SGs with the Start Up Feed Pump using EMG FR-HI S-8 NAS 4 Secondary 1 ~ n - ~ ~Systems@

ant (3 for RO);(3 for SRO-I); (3 or 2 for SRO-U)

~ i. Perform local actions for Emergency Boration (2001 Exam) P-I I DEARP I 1 1 j. Control Room Evacuation for Turbine Building Actions P-2 I ME I 4 1 k. Align Fire Protection System to the Condensate Storage Tank P-3 I DE I 8

  • Type Codes Criteria for RO / SRO-I / SRO-U

~

(A)lternate path 4-6 14-6 12-3 (C)ontrol room (D)irect from bank 59/18/14 (E)mergency or abnormal in-plant 2 1 I 2 1/ 2 1 (L)ow-Power / Shutdown 2.1121121 (N)ew or (M)odified from bank including I(A) 22/22/21 (P)revious 2 exams I3 1 I3 / 5 2 (randomly selected)

(R)CA 2 1 I 2 11 2 1 (S)imulator

ES-301,Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 System / JPM Title Type Code* Safety Function

a. Establish Alternate High Injection using EMG FR-C2 S-I NAS 2
b. Re-energize Safety Related Bus NB02 using OFN NB-030 S-2 NS 6
c. Control Room Not Habitable, Control at Aux Shutdown Panel S-3 MSAL 4 SRO
d. Rad Monitors Re-27/28 alarm, FBlS fails to actuate S-4 NALS 7 1 e. Start up a Containment Mini-Purge S-5 I DS 8 1 f. Recover a misaligned rod using OFN SF-011. S-6 I NS 1 1 g. Swap Containment Spray pumps to Containment Sumps S-7 I NAS 5
i. Perform local actions for Emergency Boration (2001 Exam) P-I DEARP 1
j. Control Room Evacuation for Turbine Building Actions P-2 ME 4
k. Align Fire Protection System to the Condensate Storage Tank P-3 DE 8 I

II I

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 14-6 12-3 (C)ontrol room (D)irect from bank 19/58/14 (E)mergency or abnormal in-plant 2 1121I > 1 (L)ow-Power / Shutdown 2 1 121I 2 1 (N)ew or (M)odified from bank including I(A) 22/22/21 (P)revious 2 exams 13 I 1 3 I 5 2 (randomly selected)

( R P 2 1121/ 2 1 (S)imulator