ML061700072
ML061700072 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 09/23/2005 |
From: | Gody A Operations Branch IV |
To: | Muench R Wolf Creek |
References | |
50-482/06-301, ES-301, Rev 9, ES-301-2 50-482/06-301 | |
Download: ML061700072 (8) | |
Text
ES-301,Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 System / JPM Title Type Code* Safety Function
- a. Establish Alternate High Injection using EMG FR-C2 (ESF) S-I NAS 2
- b. Re-energize Safety Related Bus NB02 using OFN NB-030 S-2 NS 6
- c. Control Room Not Habitable, Control at Aux Shutdown Panel S-3 MSAL 4 SRO f.
g.
h.
1 Implant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Perform local actions for Emergency Boration (2001 Exam) P-I DEARP 1 j.
- k. Align Fire Protection System to the Condensate Storage Tank P-3 DE 8
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 14-6 I 2-3 (C)ontrol room (D)irect from bank 19/18/24 (E)mergency or abnormal in-plant 2 1 I2 1 / 2 1 (L)ow-Power / Shutdown 2 1/21/ 2 l (N)ew or (M)odified from bank including 1(A) 22/22/21 (P)revious 2 exams 1 3 / 2 3 I 1 2 (randomly selected)
(WA 21/21/21 (S)imulator
Appendix D, Rev. 9 Scenario Outline Form ES-D-I
/I Facility: Wolf Creek Generatina Station Examiners:
Scenario No.: 1 (New)
Operators:
Op-Test No.: 1 1 Initial Conditions: 55% Dower, B Main Feed PumD (MFP) rollina at 1100 rDm
/ Turnover: Place 2dMFP on line, maintain current Dower for flux maD I I Malf. No. Event Type*
Event Description 1 1 1 NIA N-BOP I Place 2dMFP on line 2 mPCS02A R-ATC Turbine Impulse Pressure AC PT-505 fails low causing control rod insertion.
3 mMSSOlC2 I-BOP C SG Pressure Instrument fails low, affecting Steam Flow indication and MFP Speed Control.
4 mCCW 18B C-ATC Component Cooling Water System (CCW) Leak in the B Train Safety C-BOP Loop. Requires removing ByTrain CCW and ECCS pumps from service.
5 mRCS07B M Small Break LOCA, Safety Injection mCCW06A C-ATC A Train CCW pump A trips on SI and the C pump fails to autostart.
r 19064B C-BOP Containment Isolation Phase A fails to automatically actuate
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D, Rev. 9 Scenario Outline Form ES-D-1 Facility: Wolf Creek Generatina Station Scenario No.: 2 l M o d l Op-Test No.: 1:
Examiners: Operators:
(1 Initial Conditions: 10Oo/o Dower, Normal Ouerations Turnover: , A Emeraencv Diesel Generator (EDG) is Out of Service.
Severe Thunder Storm Watch in Effect for Coffev Countv.
Event Malf. No. Event Event No. Type* Description 1 mWAT06 R-ATC Circ Water Pump A trips causing a Main Turbine Setback to 80%.
I A I I I mPRSO1A I I-ATC I Pressurizer Pressure Instrument fails high 3 P24100C C-ATC Instrument Air to Containment,KA HV-29, fails closed causing a loss of P24 1OOD normal charging and letdown.
4 mRCS02A M 330 gpm Steam Generator Tube Rupture on A Both Essential Service Water Pumps fail to automatically start on Safety P19028B Injection Block Valve BB HV-8000B fails to open, affecting RCS depressurization.
Requires entry into contingencyprocedure EMG C-33 for SGTR with Loss of Pressure Control.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D,Rev. 9 Scenario Outline Form ES-D-1 Facility: Wolf Creek Generatina Station Scenario No.: B/U (Bank) Op-Test No.: 1.
Examiners: Operators:
Initial Conditions: 100% Dower, Normal operations Turnover: Normal Charaina PumD and A AFW Dump are out of service Event Description 1 mPRSO1B I-ATC Pressurizer Pressure Channel for lower selected channel fails high, affects only one PORV and not the Master Pressure Controller mFWMO5 C-BOP A Main Feed Pump speed controller fails low A
Small Break LOCA 1 4 I various I C-ATC Automatic Safety Injection fails to actuate on both trains, Manual available
~ ~~
A and B Charging pumps trip on safety injection, A and B Safety Injection P17027B pumps fail to start automatically. This results in no High Head or mCVC13A Intermediate Head Injection. The Safety Injection pumps may be manually mCVC 13B started.
A Steam Generator Atmospheric Relief valve fails open post trip.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
ES-301, Rev. 9 Administrative Topics Outline Form ES-301-1 Facility: Wolf Creek Generatincl Station Date of Examination: 03/06/2006 Examination Level: RO I Administrative Topic (seeNote) ~
Type Code*
Describe activity to be perFormed Conduct of Operations Perform Surveillance STS BG-001, Boron Injection Flow 2.1.20 NS Path Verification, on the Simulator.
I (A1.a)
Conduct of Operations Determine Time to Boil and Core Uncovery based on a 2.1.25 PR loss of Shutdown Cooling.
(A1.b) (2001 SRO Admin)
Equipment Control Prepare a Clearance Order to remove a leaking pump 2.2.13 NR from service.
Radiation Control Given a Radiological Survey Map and Radiation Work 2.3.1 MR Permit determine the Radiological conditions and controls (A31 required.
Emergency Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (I 3 for ROs; 5 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (2 1)
(P)revious 2 exams ( I 1; randomly selected)
ES-301, Rev. 9 Administrative Topics Outline Form ES-301-1 Facility: Wolf Creek Generatincl Station Date of Examination: 03/06/2006 Examination Level: SRO Operating Test Number: 2 Administrative Topic Type Describe activity to be performed Code*
Conduct of Operations One licensed operator had to leave shift. Determine from 2.1.5 NR a list which operators could be called in without getting (A1.a) permission for exceeding work hour limitations.
Conduct of Operations Determine Time to Boil and Core Uncovery based on a 2.1.25 PR loss of Shutdown Cooling.
(A1.b) (2001 SRO Admin) l Equipment Control NR Review a Clearance Order for approval and identify the errors.
Radiation Control MR Given a Radiological Survey Map and Radiation Work 2.3.1 Permit determine the Radiological conditions and controls (A31 required.
Emergency Plan After completing a dynamic scenario on the simulator, 2.4.41 MS make the correct Emergency Plan Classification for the (A41 events.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
~ _ _ _ _ _
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (I 3 for ROs; I 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (2 1)
(P)revious 2 exams (I 1; randomly selected)
ES-301,Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Exam Level: RO Operating Test No.: 1 Control Room Systems@(8 for RO); (7 for SRO-I); ( 2 or 3 for SRO-U, including 1ESF)
System / JPM Title Type Code* Safety Function
- a. Establish Alternate High Injection using EMG FR-C2 S-I NAS 2
- b. Re-energize Safety Related Bus NB02 using OFN NB-030 S-2 NS 6
- c. Increase ECCS Accumulator Pressure (2001 Exam) S-3 DSLP 3
- d. Rad Monitors Re-27/28 alarm, FBlS fails to actuate S-4 NALS 7
- e. Start up a Containment Mini-Purge S-5 DS 8
- f. Recover a mis-aligned rod using OFN SF-011. S-6 NS 1
- g. Swap Containment Spray pumps to Containment Sumps S-7 NAS 5 I
- h. Feed SGs with the Start Up Feed Pump using EMG FR-HI S-8 NAS 4 Secondary 1 ~ n - ~ ~Systems@
ant (3 for RO);(3 for SRO-I); (3 or 2 for SRO-U)
~ i. Perform local actions for Emergency Boration (2001 Exam) P-I I DEARP I 1 1 j. Control Room Evacuation for Turbine Building Actions P-2 I ME I 4 1 k. Align Fire Protection System to the Condensate Storage Tank P-3 I DE I 8
- Type Codes Criteria for RO / SRO-I / SRO-U
~
(A)lternate path 4-6 14-6 12-3 (C)ontrol room (D)irect from bank 59/18/14 (E)mergency or abnormal in-plant 2 1 I 2 1/ 2 1 (L)ow-Power / Shutdown 2.1121121 (N)ew or (M)odified from bank including I(A) 22/22/21 (P)revious 2 exams I3 1 I3 / 5 2 (randomly selected)
(R)CA 2 1 I 2 11 2 1 (S)imulator
ES-301,Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 System / JPM Title Type Code* Safety Function
- a. Establish Alternate High Injection using EMG FR-C2 S-I NAS 2
- b. Re-energize Safety Related Bus NB02 using OFN NB-030 S-2 NS 6
- c. Control Room Not Habitable, Control at Aux Shutdown Panel S-3 MSAL 4 SRO
- d. Rad Monitors Re-27/28 alarm, FBlS fails to actuate S-4 NALS 7 1 e. Start up a Containment Mini-Purge S-5 I DS 8 1 f. Recover a misaligned rod using OFN SF-011. S-6 I NS 1 1 g. Swap Containment Spray pumps to Containment Sumps S-7 I NAS 5
- i. Perform local actions for Emergency Boration (2001 Exam) P-I DEARP 1
- j. Control Room Evacuation for Turbine Building Actions P-2 ME 4
- k. Align Fire Protection System to the Condensate Storage Tank P-3 DE 8 I
II I
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 14-6 12-3 (C)ontrol room (D)irect from bank 19/58/14 (E)mergency or abnormal in-plant 2 1121I > 1 (L)ow-Power / Shutdown 2 1 121I 2 1 (N)ew or (M)odified from bank including I(A) 22/22/21 (P)revious 2 exams 13 I 1 3 I 5 2 (randomly selected)
( R P 2 1121/ 2 1 (S)imulator