Similar Documents at Perry |
---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:Technical Specification
MONTHYEARML23303A1362023-10-27027 October 2023 Enclosure C - Pnpp Technical Specification Bases, Revision 18 L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21307A2072021-10-28028 October 2021 2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases L-21-176, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-10-19019 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-20-185, License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 12021-02-17017 February 2021 License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 1 L-21-053, Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-02-0202 February 2021 Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-20-291, Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-11-19019 November 2020 Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-3602020-04-24024 April 2020 License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR2019-12-18018 December 2019 Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR L-18-174, Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control2018-07-24024 July 2018 Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control L-17-247, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602017-12-20020 December 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.2017-12-0606 December 2017 Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. ML17305A2382017-10-23023 October 2017 Technical Specification Bases, Rev. 11 L-17-108, Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules2017-08-11011 August 2017 Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules L-17-042, Request for Licensing Action to Revise the Technical Specifications2017-06-0808 June 2017 Request for Licensing Action to Revise the Technical Specifications L-15-235, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-4252015-08-24024 August 2015 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-425 L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process2012-02-22022 February 2012 Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-12012 April 2011 License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 12010-12-15015 December 2010 License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 L-09-218, Submittal of Technical Specification Bases, Revision 72009-10-0505 October 2009 Submittal of Technical Specification Bases, Revision 7 L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control2009-03-11011 March 2009 Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control ML0906306722009-03-0909 March 2009 Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 4972008-11-18018 November 2008 License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 ML0729102222007-10-12012 October 2007 Submittal of Technical Specification Bases, Revision 6 ML0711401262007-04-19019 April 2007 Technical Specification Pages, Deleting License Condition 2.F ML0630502502006-10-27027 October 2006 Issuance of Technical Specification Page Clarify Wording of Emergency Closed Cooling Water SR 3.7.10.2 ML0616700762006-06-0606 June 2006 License Amendment Requests to Revise Technical Specification 5.5.7, Ventilation Filter Test Program to Correct Referenced Flow Units ML0519402052005-07-0505 July 2005 License Amendment Request Pursuant to 10CFR50.90: Revision of Technical Specification Surveillance Requirement 3.3.1.3.5 Which Revises the Enabled Region for the Oscillation Power Range Monitors ML0500700132005-01-0606 January 2005 Tech Spec Pages for Amendment 131 Regarding Increase Flexibility in Mode Restraint ML0425300872004-08-31031 August 2004 License Amendment Request Pursuant to 1OCFR50.90: Revision of Technical Specification 3.4.1, 'Recirculation Loops Operating Associated with Single Recirculation Loop Operation ML0411701652004-04-23023 April 2004 Technical Specifications, Approve Administrative Procedures and Offsite Dose Calculation Manual ML0432202062004-04-0505 April 2004 License Amendment Request Pursuant to 10CFR50.90: Revision of the Minimum Critical Power Ratio Safety Limit ML0312200312003-04-29029 April 2003 Issuance of Amendment, Technical Specifications ML0309808202003-04-0808 April 2003 Issuance of Amendment, Technical Specification Page RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0231004072002-10-30030 October 2002 License Amendment Request Pursuant to 10 CFR 50.90: Elimination of Requirements for Post Accident Sampling System Using Consolidated Line Item Improvement Process 2023-06-05
[Table view] Category:Amendment
MONTHYEARL-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-21-176, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-10-19019 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-3602020-04-24024 April 2020 License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 L-18-174, Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control2018-07-24024 July 2018 Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control L-17-247, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602017-12-20020 December 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-17-108, Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules2017-08-11011 August 2017 Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules L-17-042, Request for Licensing Action to Revise the Technical Specifications2017-06-0808 June 2017 Request for Licensing Action to Revise the Technical Specifications L-15-235, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-4252015-08-24024 August 2015 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-425 L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control2009-03-11011 March 2009 Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control ML0711401262007-04-19019 April 2007 Technical Specification Pages, Deleting License Condition 2.F ML0630502502006-10-27027 October 2006 Issuance of Technical Specification Page Clarify Wording of Emergency Closed Cooling Water SR 3.7.10.2 ML0616700762006-06-0606 June 2006 License Amendment Requests to Revise Technical Specification 5.5.7, Ventilation Filter Test Program to Correct Referenced Flow Units ML0500700132005-01-0606 January 2005 Tech Spec Pages for Amendment 131 Regarding Increase Flexibility in Mode Restraint ML0411701652004-04-23023 April 2004 Technical Specifications, Approve Administrative Procedures and Offsite Dose Calculation Manual ML0432202062004-04-0505 April 2004 License Amendment Request Pursuant to 10CFR50.90: Revision of the Minimum Critical Power Ratio Safety Limit ML0312200312003-04-29029 April 2003 Issuance of Amendment, Technical Specifications ML0309808202003-04-0808 April 2003 Issuance of Amendment, Technical Specification Page RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0231004072002-10-30030 October 2002 License Amendment Request Pursuant to 10 CFR 50.90: Elimination of Requirements for Post Accident Sampling System Using Consolidated Line Item Improvement Process 2023-06-05
[Table view] |
Text
FENOC Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 FirstEnergyNuclear OperatingCompany L William Pearce 440-280-5382 Vice President Fax: 440-280-8029 June *, , 2006 '
Docket Number 50-440 License Number NPF-58 PY-CEI/NRR-2950L 10 CFR 50.90 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Perry Nuclear Power Plant License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Test Program to Correct Referenced Flow Units Ladies and Gentlemen:
Nuclear Regulatory Commission (NRC) review and approval of a license amendment for the Perry Nuclear Power Plant (PNPP) is requested. The proposed license amendment revises the Ventilation Filter Test Program (VFTP) in Technical Specification (TS) 5.5.7. The license amendment is a corrective action to revise the flow rate units specified in the VFTP from standard cubic feet per minute to cubic feet per minute. This amendment will ensure the PNPP TS are consistent with plant design documentation, testing criteria, and the industry.
Approval of the license amendment is requested prior to June_( , 2007, with the amendment to be implemented within 120 days following its effective date.
The proposed changes have been reviewed by the PNPP Plant Operations Review Committee and the Company Nuclear Review Board. Enclosure 1 includes an evaluation of the proposed amendment.
There are no regulatory commitments included in this letter or its attachments. If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager -
FENOC Fleet Licensing, at (330) 315-7243.
9-ooI
June (* 2006 Docket Number 50-440 License Number NPF-58 PY-CEI/NRR-2950L Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on June .__, 2006.
Enclosure:
- 1. Revision of Technical Specification 5.5.7, Ventilation Filter Test Program to correct the referenced air flow units from scfm to cfm
Attachment:
- 1. Proposed Mark-Up Of Technical Specification Pages cc: NRC Project Manager NRC Resident Inspector NRC Region III State of Ohio
Enclosure 1 PY-CEI/NRR-2950L Page 1 of 7 LICENSE AMENDMENT REQUEST
Subject:
Revision of Technical Specification 5.5.7, Ventilation Filter Test Program to correct the referenced air flow units from scfm to cfm
- 1. DESCRIPTION
- 2. PROPOSED CHANGE
- 3. BACKGROUND
- 4. TECHNICAL ANALYSIS
- 5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
- 6. ENVIRONMENTAL CONSIDERATION
- 7. REFERENCES
- 8. ATTACHMENT
Enclosure 1 PY-CEI/NRR-2950L Page 2 of 7
- 1. DESCRIPTION This License Amendment Request, which is being submitted to the Nuclear Regulatory Commission (NRC) for review and approval, corrects the referenced units specified for air flow rates within Technical Specification 5.5.7, Ventilation Filter Test Program (VFTP). The air flow units should be referenced in cubic feet per minute (cfm) as opposed to standard cubic feet per minute (scfm).
- 2. PROPOSED CHANGE The Perry Nuclear Power Plant (PNPP) VFTP specifies flow rates for the Engineered Safety Feature (ESF) ventilation systems in scfm, which is not consistent with plant design documentation, testing criteria or the industry. To address this inconsistency, the air flow units specified within Technical Specification 5.5.7 will be changed from scfm to cfm.
Attachment 1 indicates the proposed changes to the associated Technical Specification pages.
- 3. BACKGROUND The PNPP VFTP ensures that the required testing of ESF ventilation systems is performed in accordance with Regulatory Guide (RG) 1.52, Revision 2, "Design, Testing, And Maintenance Criteria for Post Accident Engineered-Safety-Feature Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants,"
when required for operability. The ESF ventilation systems at the PNPP are the Control Room Emergency Recirculation System (CRERS), the Fuel Handling Area Exhaust System (FHAES), and the Annulus Exhaust Gas Treatment System (AEGTS).
Air flow rates are normally indicated in cfm using test equipment or installed instrumentation. Air flow rates are not normally indicated in units of scfm, which reflects the air flow rate at standard temperature and pressure conditions.
PNPP design documents indicate that the design and testing of the ESF ventilation systems are'to be based upon air flow units of cfm. The General Electric Standard Technical Specifications reference flow rate values in cfm. In addition, the Technical Specifications for similar plants indicate ESF ventilation system flow rates in units of cfm as opposed to at standard air conditions or scfm. The draft Technical Specifications for BWR/6 plants provided by the NRC to the PNPP staff on December 27, 1982 referenced ESF ventilation system air flow in units in cfm. However, the air flow units were later referenced as scfm in a follow up letter from the NRC on October 21, 1985, which provided the final draft PNPP Technical Specifications for proof and review. This change in units was inadvertently carried forward from the 1985 letter. Therefore, the Administrative Controls Section of the PNPP Technical Specifications (Section 5.5.7), which addresses the VFTP, references air flow rate values in scfm as opposed to cfm.
The inconsistency in air flow units was documented in a Condition Report in the PNPP Corrective Action Program. A corrective action was generated as a result of the condition
Enclosure I PY-CEI/NRR-2950L Page 3 of 7 report investigation to submit a icense amendment request to correct the ESF ventilation system air flow rate units specified in the VFTP from standard cubic feet per minute to cubic feet per minute. Therefore, a license amendment request is proposed to correct the VFTP to accurately reflect the design basis of the atmospheric filtration systems with respect to air flow units. As an interim corrective action, the associated surveillance procedures for VFTP testing have been revised to verify flow is within the Technical Specification values in scfm as well as to verify flow is within the design basis values in cfm. This conservative measure has been taken until the proposed license amendment request is approved.
- 4. TECHNICAL ANALYSIS The Industrial Ventilation Manual, 2 1 st Edition, by the American Conference of Governmental Industrial Hygienists, Inc., does not require correction of air flow values from cfm to scfm for air velocity measurements. Within Section 9.4 of the Industrial Ventilation Manual, the following statement is made: "Where temperatures of an air stream vary more than 30 F from the standard temperature of 70 F and/or if the altitude is greater than 1,000 feet, it is advisable to make a correction for temperature and pressure."
The average ambient air temperature of the plant areas served by the PNPP ESF ventilation systems does not vary more than 30°F from the standard temperature of 70°F and the elevation of the PNPP site is approximately 645 feet above mean sea level.
Indicating the measured air flows from the ESF ventilation systems as cfm is consistent with the requirements of ANSI/ASME N509-1980, "Nuclear Power Plant Air Cleaning Units and Components," ANSI/ASME N510-1980, "Testing of Nuclear Air-Cleaning Systems," RG 1.52, and the PNPP design basis In addition, changing the air flow units to cfm in the PNPP VFTP does not involve any physical change to the plant and will not affect ESF ventilation system performance, since for the average ambient temperatures and pressures of the plant areas served by the PNPP ESF ventilation systems the difference between cfm and scfm values is well within the design margin of +1- 10%.
- 5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration The PNPP staff has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below: -
The proposed amendment corrects the VFTP to accurately reflect the design basis of the ESF atmospheric filtration systems with respect to air flow units. The proposed amendment ensures the VFTP is consistent with the PNPP design basis.
Enclosure 1 PY-CEI/NRR-2950L Page 4 of 7
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response
The ESF Ventilation systems reduce the concentration of airborne radioactive contaminants following a design basis accident and therefore are not initiators of design bases accidents. The proposed amendment does not change the manner in which the ESF ventilation systems are operated or tested. Implementation of the proposed amendment will ensure the ESF ventilation systems perform their function when called upon and does not affect the plant operations, design function or analysis that verifies the capability of a structures, systems or components.
The proposed amendment does not affect the design of the ESF ventilation systems, the Operational characteristics of the ESF ventilation systems, the interfaces between the ESF ventilation systems and those plant systems they support, or the reliability of the ESF ventilation systems.
Therefore, the ESF ventilation systems will be capable of performing their accident mitigation function and there is no increase in the probability or consequences of an accident already evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response
The proposed amendment introduces no new mode of plant operation and does not involve a physical modification to the plant. New equipment is not installed with the proposed amendment, nor does the proposed amendment cause existing equipment to be operated in a new or different manner.
Since the proposed changes do not involve a change to the plant design or operation, no new system interactions are created by this change. The proposed amendment does not produce any parameters or conditions that could contribute to the initiation of accidents different from those already evaluated in the Updated Safety Analysis Report.
The changes to the VFTP do not affect the assumed accident performance of the ESF Ventilation systems, nor any plant structure, system or component previously evaluated.
Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Enclosure 1 PY-CEI/NRR-2950L Page 5 of 7
- 3. Does the proposed arr~hdment involve a significanit reduction in a margin of safety?
Response
The proposed amendment does not impact the ESF ventilation systems performance, including the capability for each ESF ventilation system to attain and maintain required air flow assumed in the plant safety analysis.
The proposed amendment does not involve a significant reduction in a margin of safety since the operability of the ESF ventilations systems continues to be determined as required to support the capability of the ESF ventilations systems to provide the required ventilation, filtration and temperature control to mitigate the consequences of an accident.
5.2 Applicable Regulatory Requirements/Criteria The U.S. NRC Standard Review Plan (NUREG-0800), Revision 2- July 1981, Section 6.5.1, "ESF Atmosphere Cleanup Systems," Subsection II,"Acceptance Criteria," states the following: "The [ESF] systems should be redundant, be designed to Seismic Category I requirements, be able to actuate automatically, and be limited to an air flow rate of approximately 30,000 cfm."
NUREG-0887, "Safety Evaluation Report related to the operations of Perry Nuclear Power Plant, Units 1 and 2," Sections 6.4. "Control Room Habitability," and Section 6.5.
"Engineered Safety Feature Filter Systems," reflects flow values in cfm for the CRERS, the AEGTS, and the FHAES (identified in the Safety Evaluation Report as FHACES).
Also, Generic Letter (GL) 83-13 issued on March 2, 1983 addresses "Clarification of Surveillance Requirements for HEPA Filters and Charcoal Adsorber Units In Standard Technical Specifications on ESF Cleanup Systems." The GL Enclosure uses the following words in numerous subsections: "a flow rate of cfm +-10%."
The VFTP and the PNPP ESF ventilation systems comply with RG 1.52, Revision 2, ANSI/ASME N509-1980 and ANSI/ASME N510-1980.
RG 1.52, Revision 2, Section C.2.f, "System Design Criteria," states the following regarding the design criteria for ESF atmospheric cleanup systems: "The volumetric air flow rate of a single cleanup train should be limited to approximately 30,000 ft3/min." RG 1.52, Revision 3 also carries forward the reference to air flow units in cfm.
ANSI/ASME Standard N509-1980, which is referenced in the PNPP Updated Safety Analysis Report for the PNPP design of the ESF systems, provides the methodology for determining the nominal air flow capacity of the adsorber. The ANSI standard methodology provides air flow capacity in the units of cfm.
RG 1.52 and ASME/ANSI N510 do not require airflow to be measured in scfm but require airflow to meet the system design flow. The PNPP system design calculations were correctly based upon cfm values and the original design and testing of the ESF systems were based upon cfm.
Enclosure I PY-CEI/NRR-2950L Page 6 of 7 Per the requirements of RG 1;52, the ESF ventilation systems High Efficiency Particulate Air (HEPA) filters are designed to Military Specification MIL-F-51068, "Filters, Particulate (High-Efficiency Fire Resistant)." Throughout MIL-F-51068, the required air flow units are specified as cfm for testing and design requirements. MIL-F-51068 has been withdrawn by the Department of Defense and replaced by the American Society of Mechanical Engineers (ASME) Code On Nuclear Air and Gas Treatment, AG-1 and Department of Energy (DOE)
Standard DOE-STD-3020-97, "Specification For HEPA Filters Used By DOE Contractors."
Within DOE-STD-3020-97 the required nominal air flow ratings for HEPA filters are listed in units of cfm.
Review of the Technical Specifications, Section 5.5, "Programs and Manuals" for other BWR plants similar to the PNPP, such as the River Bend Station, the Browns Ferry Nuclear Plant and the Grand Gulf Nuclear Station, indicates that their VFTP ESF ventilation system air flow units are indicated as cfm as opposed to scfm.
The proposed amendment corrects the referenced units specified for air flow rates within the VFTP from scfm to cfm to ensure consistency with the requirements of the Standard Review Plan (NUREG-0800); RG 1.52, Revision 2; ANSI/ASME N510-1980; ANSI/ASME N509-1980; the PNPP design basis; and plants of similar design.
- 6. ENVIRONMENTAL CONSIDERATION The proposed amendment was evaluated against the criteria of 10 CFR 51.22 for environmental considerations. The proposed amendment does not significantly increase individual or cumulative occupational radiation exposures, does not significantly change the types or significantly increase the amounts of effluents that may be released off-site, and as discussed in the Regulatory Safety Analysis, does not involve a significant hazards consideration. Based on the foregoing, it has been concluded that the proposed amendment meets the criteria given in 10 CFR 51.22(c)(9) for categorical exclusion from the requirement for an Environmental Impact Statement.
Enclosure 1 PY-CEI/NRR-2950L Page 7 of 7
- 7. REFERENCES Standard Review Plan (NUREG-0800), Section 6.5.1 Standard Technical Specifications General Electric Boiling Water Reactors (GE-STS)
BWRP6 and Reviewers Notes PNPP Letter from the NRC dated December 27, 1982 (Log No. 12/27/82A)
PNPP Letter from the NRC dated October 21, 1985 (Letter No. PY-NRR/CEI-0258L)
PNPP Condition Report 04-03817 PNPP ESF Ventilation System Calculations RG 1.52, Revision 2 and Revision 3 ANSI/ASME N509-1980 ANSI/ASME N510-1980 MIL-F-51068, "Filters, Particulate (High-Efficiency Fire Resistant)"
DOE-STD-3020-97, "Specification For HEPA Filters Used By DOE Contractors" PNPP USAR Chapters 2,3 and 6 Industrial Ventilation Manual, 2 1 st Edition River Bend Station Technical Specifications, Section 5.5, "Programs and Manuals" Browns Ferry Nuclear Plant Unit I Technical Specifications, Section 5.5, "Programs and Manuals" Grand Gulf Nuclear Station Technical Specifications, Section 5.5, "Programs and Manuals"
- 8. ATTACHMENTS
.1. Proposed Mark-Up Of Technical Specification Pages
Attachment I PY-CEI/NRR-2950L Page 1 of 3 Specification Pages Proposed Mark-Up Of Technical
Attachment 1 PY-CEI/NRR-2950L Page 2 of 3 Programs and Manuals 5.5 5.5 Programs and Manuals.
5.5.7 Ventilation Filter Testing Program (VFTP) (continued)
- a. Demonstrate for each of the ESF systems that an inplace test of the high efficiency particulate air (HEPA) filters shows a penetration and system bypass < 0.05% when tested in
.accordance with Regulatory Guide 1.52, Revision 2 and ANSI N510-1980 at the system flowrate specified below +/- 10%:
. - ... ESF Ventilation System Flowrate a) Co'ntrol Room Emergency Recirculation 30,000 fm b) Fuel Handling Building 15,000 s fm c) Annulus Exhaust Gas Treatment 2,000 sfm
- b. Demonstrate for each of the ESF systems that an inplace test of the charcoal adsorber shows.a penetration and system bypass < 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2 and ANSI N510-1980 at the system.
flowrate specified below +/- 10%:'r.
ESF Ventilation System Flowrate a) Control Room Emergency Recirculation 30,000 s fm b) Fuel Handling Building . 15,000s fm c) Annulus Exhaust Gas Treatment . 2,000 fm c.- Demonstrate for each of the ESF systems that a laboratory test of a sample of the charcoal adsorber, when obtained as described in Regulatory Guide 1.52, Revision 2, shows the methyl iodide penetration less than the value specified..-
below when tested in accordance with ASTM D3803-19989 at a temperature of 30 °C and equal to the relative humidity (RH) specified below::
.ESF Ventilation System Penetration RH
- a) Cntrol room Emergency Recircuiation 2.5% 70%
b) Fuel Handling Building . 2.5% 70%
c) Annulus Exhaust'Gas Treatment 0.5% 70%
5.0-11
Attachment 1 .
PY-CEI/NRR-2950L Page 3 of 3 Programs and Manuals 5.5 5.5 Programs and Manuals C57 i Ts nProcram rj1+l.. .V.Ir
'cei-t-nueUJ
- d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal adsorbers is ,less than the value specified belowwhen tested in accordance with Regulatory Guide 1.52. Revision 2. and ANSI N510-1980 at the system flowrate specified below +/- 10%:
. .-- ESFVentilation -System Delta P Flowr~ate a) Control Room Emergency Recirculation 4.9" H20 30,000r fim b) .-Fuel Handling Building 4.9" H20 15,000 S fm c) Annulus Exhaust Gas Treatment 6.0" HIO 2.000 fm
- e. -Demonstrate that the heaters for each of the ESF systems dissipate the value specified below +/-.10: when corrected to nominal input voltage when tested in accordance with ANSI N510-1980:
ESF Ventilation System Wattage a) Control Room Emergency Reci rculation 100 kW b) Fuel Handling Building 50 kW c) Annulus Exhaust Gas Treatment 20 kW The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTP test frequencies.
5.5.8 Explosive'Gas'and Storaqe Tank Radioactivity rInitoringq Proaram
.This program provides controls for potentially explosive gas mixtures contai ned in the mai n; condenser.. offgas 'treatment system':
and the quantity.of- radioactivity: contained in unprotected outdoor liquid storage.tanks ...
The -program shal~l.include:-
- .The 14r~t for rnnrfi~ne 0 hydrnrg inthe; rai
~ ~;,'~ offgas.treatment
..-A-*
I=c 'l 4";* system A*-* *' -ý_ I-ý'. '---, - - and aC.." sirvei
-*;- "3--*** lance
- u,, , l1 . L I I ICIi U. . S II I I III it I ha i I - Db appropriate'to'the'system's.design criteria (i.e.. whether
-or:not, the system is designed to withstand a hydrogen explosion): and