ML061650026

From kanterella
Jump to navigation Jump to search
Units 1 & 2 and R. E. Ginna - Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
ML061650026
Person / Time
Site: Calvert Cliffs, Nine Mile Point, Ginna  
Issue date: 06/09/2006
From: Heffley J
Constellation Generation Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
+kBR1SISP20060621, GL-06-003
Download: ML061650026 (11)


Text

  • J. M.Heffley Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 310 Annapolis, MD 21401 410-897-5020 Cwon~steellation Energy 0Generation Group June 9, 2006 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-3 18 Nine Mifle Point Nuclear Station Unit Nos. 1 & 2; Docket Nos. 50-220 & 50-4 10 R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to Generic Letter 2006-03, Potentially Nonconforming Hemnyc and MT Fire Barrier Configurations (a)

Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, dated April 10, 2006

REFERENCE:

In Reference (a), the Nuclear Regulatory Commission requested addressees of the generic letter to evaluate their facilities to confirm compliance with existing applicable regulatory requirements for fire barriers. The generic letter particularly asked for information on fire barriers utilizing Heniyc and MT materials. To gather this information, Reference (a) requires a written response to specific questions within 60 days of issuance of the generic letter.

Calvert Cliffs Nuclear Power Plant (CCNPP), Nine Mile Point Nuclear Station (NMPNS), and R.E.

Ginna Nuclear Power Plant (Ginna) have conducted the requested evaluation.

The results of those evaluations, in the form of answers to the questions posed in Reference (a), are in Attachments (1) through (3) of this letter.

This letter presents information requested by the Nuclear Regulatory Commission and contains no regulatory commitments.

'I

  • Document Control Desk June 9, 2006 Page 2 Should you have any questions regarding the information in this submittal, please contact Mr. L. S. Larragoite at (410) 897-5087 or Louis.S.Larragoite@constellation.com.

Very truly yours, (Cf Nuclear 0fi~l STATE OF MARYLAND TO WIT COUNTY OF ANNE ARUNDEL I, John M. Heffley, state that I am Chief Nuclear Officer, Constellation Generation Group, LLC, for Calvert Cliffs Nuclear Power Plant, Inc., Nine Mile Point Nuclear Station, LLC, and R. E. Ginna Nuclear Power Plant, LLC, and that I am duly authorized to execute and file this response on behalf of these companies. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by employees and/or consultants of the companies.

Such information has been reviewed in accordance with company practice, and I believe it to be reliable.

'u~srbed and sworn before me, a Notary Public, in and for the State oa land and County of

17tij&

of 2006.

-W13NESS rky Hand and Notarial Seal:

-M -C-imission Expires:

2VNgtaryPublic VDate~

~~

JMII!EMT/jmp Attachments:

(1) Calvert Cliffs Nuclear Power Plant Response to Generic Letter 2006-03 (2) Nine Mile Point Nuclear Station Response to Generic Letter 2006-03 (3) R.E. Ginna Nuclear Power Plant Response to Generic Letter 2006-03 cc:

P. D. Milano, NRC S. J. Collins, NRC T. G. Colburn, NRC Resident Inspector, NRC (Calvert Cliffs)

Resident Inspector, NRC (Ginna)

Resident Inspector, NRC (NMPNS)

R. I. McLean, Maryland DNR J. P. Spath, NYSERD P. Eddy, NYS Dept. of Public Services

ATTACHMENT (1)

Calvert Cliffs Nuclear Power Plant Response to Generic Letter 2006-03 Constellation Generation Group June 9, 2006

Attachment (1)

Calvert Cliffs Nuclear Power Plant Response to Generic Letter 2006-03

1. Within 60 days of the date of this GL [Generic Letter], provide the following:
a. A statement on whether Hemyc or MTflre barrier material is used at their NPPs and whether it is relied upon for separation and/or safe shutdown purposes in accordance with the licensing basis, including whether Hemyc or A4T is credited in other analyses (e.g., exemptions, license amendments, GL 86-10 analyses).

Neither Hemyc nor MT fire barrier material is used at Calvert Cliffs Nuclear Power Plant and therefore it is not relied upon for separation and/or safe shutdown purposes in accordance with the plant's licensing basis. In addition, neither Hemyc nor MT fire barrier material is credited in any other analysis (e.g., exemptions, license amendments, GL 86-10 analyses) at Calvert Cliffs Nuclear Power Plant.

b. A description of the controls that were used to ensure that other fire barrier types relied on for separation of redundant trains located in a single fire area are capable ofproviding the necessary level ofprotection. Addressees may reference their responses to GL 92-08 to the extent that the responses address this specific issue.

There are no other fire barrier types in use at Calvert Cliffs Nuclear Power Plant that are relied upon for separation of redundant trains located in a single fire area.

Engineering and modification controls are in place to address changes to approved barriers and the same reviews would be applied to the selection, construction, and maintenance of any new barriers made of any types of materials. These controls ensure compliance with the plant's licensing condition on fire protection.

2.

Within 60 days of the date of this GL, for those addressees that have installed Hemyc or MT fire barrier materials, discuss the following in detail:

a. The extent of the installation (e.g., linear feet of wrap, areas installed, systems protected),

Not applicable since neither Hemyc nor MT fire barrier material is used at Calvert Cliffs Nuclear Power Plant.

b.

Whether the Hemyc and/or MTF installed in their plants is conforming with their licensing basis in light of recent findings, and if/these recent findings do not apply, why-not, Not applicable since neither Hemyc nor MT fire barrier material is used at Calvert Cliffs Nuclear Power Plant.

c.

The compensatory measures that have been implemented to provide protection and maintain the safe shutdown function of affected areas of the plant in light of the recent findings associated with Hemyc and M4T installations, including evaluations to support the addressees' conclusions, and Not applicable since neither Hemyc* nor MT fire barrier material is used at Calvert Cliffs Nuclear Power Plant.

1

Attachment (1)

Calvert Cliffs Nuclear Power Plant Response to Generic Letter 2006-03 d

A description of, and implementation schedules for, corrective actions, including a description of any licensing actions or exemption requests needed to support changes to the plant licensing basis.

Not applicable since neither Hemyc nor MT fire barrier material is used at Calvert Cliffs Nuclear Power Plant.

3.

No later than December 1, 2007, addressees that identified in L~a. Hemyc and/or MT configurations are requested to provide a description of actions taken to resolve the nonconforming conditions described in 2.d.

Not applicable since neither Hemyc nor MT fire barrier material is used at Calvert Cliffs Nuclear Power Plant.

2

ATTACHMENT (2) i Nine Mile Point Nuclear Station Response to Generic Letter 2006-03 Constellation Generation Group June 9, 2006

Attachment (2)

Nine M~ile Point Nuclear Station Response to Generic Letter 2006-03

1. Within 60 days of the date of this GL [Generic Letter], provide the following:
a. A statement on whether Hemyc or MTfire barrier material is used at their NPPs and whether it is relied upon for separation and/or safe shutdown purposes in accordance with the licensing basis, including whether Hemyc or MT is credited in other analyses (e.g., exemptions, license amendments, GL 86-JO analyses).

Neither Hemyc nor MT fire barrier material is used at Nine Mile Point Nuclear Station and therefore is not relied upon for separation and/or safe shutdown purposes in accordance with the plant's licensing basis. In addition, neither Hemyc nor MT fire barrier material is credited in any other analysis (e.g., exemptions, license amendments, GL 86-10 analyses) at Nine Mile Point Nuclear Station.

b. A description of the controls that were used to ensure that other fire barrier types relied on for separation of redundant trains located in a single fire area are capable ofproviding the necessary level ofprotection. Addressees may reference their responses to GL 92-08 to the extent that the responses address this specific issue.

There are no other fire barrier types in use at Nine Mile Point Nuclear Station that are relied upon for separation of redundant trains located in a single fire area.

Engineering and modification controls are in place to address changes to approved barriers and the same reviews would be applied to the selection, construction, and maintenance of any new barriers made of any types of materials. These controls ensure compliance with the plant's licensing condition on fire protection.

2. Within 60 days of the date of this GL, for those addressees that have installed Hemyc or MT fire barrier materials, discuss the following in detail:
a. The extent of the installation (e g., linear feet of wrap, areas installed, systems protected),

Not applicable since neither Hemyc nor MT fire barrier material is used at Nine Mile Point Nuclear Station.

b.

Whether the Hemyc and/or MT installed in their plants is conforming with their licensing basis in light of recent findings, and if these recent findings do not apply, why not, Not applicable since neither Hemyc nor MT fire barrier material is used at Nine Mile Point Nuclear Station.

c.

The compensatory measures that have been implemented to provide protection and maintain the safe shutdown function of affected areas of the plant in light of the recent findings associated with Hemyc and MT installations, including evaluations to support the addressees' conclusions, and Not applicable since neither Hemyc nor MT fire barrier material is used at Nine Mile Point Nuclear Station.

I

Attachment (2)

Nine Mfile Point Nuclear Station Response to Generic Letter 2006-03 d A description of, and implementation schedules for, corrective actions, including a description of any licensing actions or exemption requests needed to support changes to the plant licensing basis.

Not applicable since neither Hemyc nor MT fire barrier material is used at Nine Mile Point Nuclear Station.

3.

No later than December 1, 2007, addressees that identified in L~a. Hemyc and/or MT configurations are requested to provide a description of actions taken to resolve the nonconforming conditions described in 2.d.

Not applicable since neither Hemyc nor MT fire barrier material is used at Nine Mile Point Nuclear Station.

2

ATTACHMENT (3)

R.E. Ginna Nuclear Power Plant Response to Generic Letter 2006-03 Constellation Generation Group June 9, 2006

.,i Attachment (3)

R.E. Ginna Nuclear Station Response to Generic Letter 2006-03

1. Within 60 days of the date of this GL [Generic Letter], provide the following:
a. A statement on whether Hemyc or MTfire barrier material is used at their NPPs and whether it is relied upon for separation and/or safe shutdown purposes in accordance with the licensing basis, including whether Hemyc or MT is credited in other analyses (e.g., exemptions, license amendments, GL 86-10 analyses).

Ginna Nuclear Power Plant, LLC. (Girina) credited the Hemyc fire barrier system as a one hour fire rated barrier for Appendix R compliance purposes. Although Ginna's Appendix R analysis does not require any three hour fire rated Ilemyc or MT configurations, there is one barrier location where the MTf system is used to meet a one hour requirement (located on a source range nuclear instrument preamplifier to provide additional protection). The Hemyc system is also used in the Containment Building as a radiant energy shield, which is considered operable since the Hemyc system is non-combustible.

b. A4 description of the con trols that were used to ensure that other fire barrier types relied on for separation of redundant trains located in a single fire area are capable ofproviding the necessary level ofprotection. Addressees may reference their responses to GL 92-08 to the extent that the responses address this specific issue.

There are currently no other fire barrier types in use at Ginna that are relied upon for separation of redundant trains located in a single fire area.

Engineering and modification controls are in place to address changes to approved barriers and the same reviews would be applied to the selection, construction, and maintenance of any new barriers made of any types of materials. These controls ensure compliance with the plant's licensing condition on fire protection.

2.

Within 60 days of the date of this GL, for those addressees that have installed Hemyc or MT fire barrier materials, discuss the following in detail:

a. The extent of the installation (e.g., linear feet of wrap, areas installed, systems protected),

Ginna has approximately 425 feet of Hemyc conduit wrap installed on conduits ranging in sizes from 1/2" to 2 1/2 inches in diameter. In addition, there is approximately 100 feet of Hemyc wrap installed on a single 24" cable tray. Conduit wrap is directly applied, while the tray wrap is installed using the standard vendor design consisting of Hemyc wrap installed on a frame assembly that provides an air space between the wrap assembly and the raceway.

One three hour MT barrier (approximately four feet) is used to provide additional protection for a source range nuclear instrument preamplifier in the event of a fire. The Appendix R and fire analysis requirement for the location only requires a one hour fire barrier, which is the rating for other barriers in this area of the plant.

Hemyc configurations are located in the following plant areas: Battery Room, Intermediate Building Clean Side Basement, and Auxiliary Building Intermediate Floor and Basement level.

The barrier material provides protection for the following systems/circuits: AC and DC Power Distribution, Steam Generator pressure indication, Source Range Nuclear Instrumentation, and Chemical and Volume Control System charging pump power.

1

'i o

Attachment (3)

R.E. Ginna Nuclear Station Response to Generic Letter 2006-03

b.

Whether the Hemyc and/or MIT installed in their plants is conforming with their licensing basis in light of recent findings, and if these recent findings do not apply, why not.

Based on a review of NRC Information Notice 2005-07, all Hemyc configurations that are required for rated protection of circuits were determined to not be conforming to Ginna' s current licensing basis and declared inoperable on April 6, 2005.

c.

The compensatory measures that have been implemented to provide protection and maintain the safe shutdown function of affected areas of the plant in light of the recent findings associated with Hemyc and MT installations, including evaluations to support the addressees' conclusions, and All Hemyc configurations that are required for rated protection of circuits have been declared inoperable. Hourly firewatch tours have been in place since April 6, 2005 and were implemented in accordance with site procedures. Additional compensatory measures, or changes to the current measures, may be considered based on NRC lIEN 97-48, Regulatory Issue Summary 2005-07, and future industry guidance.

d. A description of, and implementation schedules for, corrective actions, including a description of any licensing actions or exemption requests needed to support changes to the plant licensing basis.

Ginna has voluntarily committed to transition to NFPA 805 as stated in the letter of intent to the NRC dated December 19, 2005, with an enforcement discretion period of three years. A project plan implementation schedule to transition to NFPA 805 has been developed. Based on the, outcome of the fire probabilistic risk assessment and modeling analysis, the Hemyc wrap will be replaced with an approved fire rated material, left as is, or eliminated through the use of change evaluations.

3.

No later than December 1, 2007, addressees that identified in L~a. Ilemyc and/or MT configurations are requested to provide a description of actions taken to resolve the nonconforming conditions described in 2.d.

Based on the outcome of the fire probabilistic risk assessment and modeling analysis for the transition to NFPA 805, the Hemyc wrap will be replaced with an approved fire rated material, left as is, or eliminated through the use of change evaluations.

2