NRC CY2005 Annual Assessment Meeting HARRIS Apex, North Carolina Apex, North Carolina May 23, 2006 May 23, 2006
Purpose of Todays Meeting
- A public forum for discussion of Harris performance A public forum for discussion of Harris performance
- NRC will address Harris performance issues identified in NRC will address Harris performance issues identified in the annual assessment letter the annual assessment letter
- Harris management will be given the opportunity to Harris management will be given the opportunity to respond to the information in the letter and inform the respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve NRC of new or existing programs to maintain or improve their performance their performance
Agenda
- Introduction
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Discussion of Harris Plant Performance Results
- Harris Management Response and Remarks
- NRC Closing Remarks
- Break
- NRC Available to Address Public Questions
Region II Organization William Travers Regional Administrator Loren Plisco Deputy Regional Administrator Charles Casto Director Division of Reactor Projects Joseph Shea Deputy Director Victor McCree Director Division of Reactor Safety Harold Christensen Deputy Director Paul Frederickson Branch Chief Regional Specialists Harris Resident Inspectors Randy Musser Phil OBryan Senior Project Engineer Son Ninh
NRC Performance Goals Ensure protection of the public health and safety and the environment Ensure the secure use and management of radioactive materials PRIMARY GOALS OTHER GOALS
- Ensure openness in NRC regulatory process
- Ensure that NRC actions are effective, efficient, realistic, and timely
- Ensure excellence in NRC management to carry out the NRCs strategic objective
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
Examples of Baseline Inspections z Equipment Alignment
~80 hrs/yr z Triennial Fire Protection
~200 hrs every 3 yrs z Operator Response
~125 hrs/yr z Emergency Preparedness
~80 hrs/yr z Rad Release Controls
~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program
~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
Performance Thresholds Safety Significance Green:
Very low safety issue White:
Low-to-moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue NRC Inspection Efforts Green:
Only Baseline Inspections White:
May increase NRC oversight Yellow:
Increased NRC oversight Red:
Increased NRC oversight and other NRC actions
Action Matrix Concept Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4
Multiple/Repetitive Degraded Cornerstone 3
Unacceptable 0
Total 103
Harris CY2005 Inspection Activities
- 2399 hours0.0278 days <br />0.666 hours <br />0.00397 weeks <br />9.128195e-4 months <br /> of inspection related activities
- Resident inspector daily inspections
- Licensed operation requalification inspection
- Security inspection
- Full participation emergency exercise (conducted April 5)
- Radiation protection inspection (Public)
- Corrective Action Program inspection
- Triennial fire protection inspection
- Emergency preparedness inspections
Harris CY2005 Assessment Results
- Harris performance was within the Licensee Response Column of the NRCs Action Matrix
- All inspection findings were classified as very low safety significance (Green)
- All performance indicators (PI) were Green
Harris Assessment Summary
- Progress Energy operated Harris in a manner that preserved public health and safety
- All cornerstone objectives were met
- NRC plans baseline inspections at Harris for the remainder of CY 2006
Harris CY2006 Scheduled Inspection Activities
- Resident inspector daily inspections
- Reactor operator initial exam
- Engineering modifications inspection
- Security inspection
- Radiation protection inspection (Occupational)
- Maintenance inspections
- Engineering design bases inspection
- Reactor pressure vessel head and steam generator inspection
- Emergency preparedness inspections
NRC CY2005 NRC CY2005 Annual Assessment Meeting Annual Assessment Meeting Harris Apex, North Carolina Apex, North Carolina May 23, 2006 May 23, 2006
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)