Request for Information for NRC Biennial Baseline Component Design Bases Inspection; IR-05000266-06-006; IR-05000301-06-006
ML061590112
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/06/2006
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Koehl D
Nuclear Management Co
References
IR-06-006
Download: ML061590112 (9)


See also: IR 05000266/2006006

Text

June 6,2006

Mr. Dennis L. Koehl

Site Vice President

Point Beach Nuclear Plant

Nuclear Management Company, LLC

6590 Nuclear Road

Two Rivers, WI 54241-9516

SUBJECT:

- INFORMATION

REQUEST FOR AN NRC BIENNIAL BASELINE COMPONENT DESIGN BASES

INSPECTION (CDBI) 05000266/2006006 (DRS); 05000301/2006006 (DRS)

Dear Mr. Koehl:

On August 14, 2006, the NRC will begin a biennial baseline Component Design Bases

Inspection (CDBI) at the

. A team of seven inspectors will

perform this 4-week inspection. This inspection will be performed in accordance with revised

NRC Baseline Inspection Procedure (IP) 71111.21 and replaces the biennial Safety System

Design and Performance Capability inspection.

The CDBI inspection focuses on components which have high risk and low design margins.

The components to be reviewed during this baseline inspection will be identified during an

in-office preparation week prior to the first week of on-site inspection. In addition, a number of

risk significant operator actions and operating experience issues, associated with the

component samples, will also be selected for review.

The inspection will include 4 weeks of on-site inspection. This will include one to two weeks of

on-site information gathering. The inspection team will consist of six NRC inspectors, of which

five will focus on engineering and one on operations. The current inspection schedule is as

follows:

On-site weeks: August 14, 2006, August 28, 2006, September 11, 2006, and

September 25.

The team will be preparing for the inspection mainly during the weeks of August 14 and 21, 2006,

as discussed in the attached enclosure. A Region III Senior Reactor Analyst will accompany the

inspection team during the week of August 14, 2006, to review probabilistic risk assessment data

and assist in identifying risk significant components, which will be reviewed during the inspection.

Experience with previous baseline design inspections of similar depth and length has shown that

these type of inspections are extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the inspection.

D. Koehl

-2-

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. The information request has been divided as follows:

The first group lists information necessary for a productive inspection preparation. This

information should be available to the Regional Office by no later than July 28, 2006, or sooner.

The second group of documents requested are those items necessary for the teams in-office

(August 21, 2006) preparation activities. During the in-office preparation week, the team may

identify additional information needed. This information should be available by August 28, 2006

(on-site week). The last group lists information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection.

The lead inspector for this inspection is Mr. Robert Daley. We understand that our regulatory

affairs contact for this inspection is Ms. Fritzi Flenji of your organization. In order to facilitate the

inspection, we request that a contact individual be assigned to each inspector to ensure

information requests, questions, and concerns are addressed in a timely manner. If there are

any questions about the inspection or the material requested in the Enclosure, please contact the

lead inspector at (630) 829-9749 or via e-mail at RCD@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-266; 50-301

License Nos. DPR-24; DPR-27

Enclosure:

Component Design Bases Inspection (CDBI) Document Request

See Attached Distribution

D. Koehl

-3-

cc w/encl:

F. Kuester, President and Chief

Executive Officer, We Generation

D. Cooper, Senior Vice President, Group Operations

J. McCarthy, Site Director of Operations

D. Weaver, Nuclear Asset Manager

Plant Manager

Regulatory Affairs Manager

Training Manager

Site Assessment Manager

Site Engineering Director

Emergency Planning Manager

J. Rogoff, Vice President, Counsel & Secretary

K. Duveneck, Town Chairman

Town of Two Creeks

Chairperson

Public Service Commission of Wisconsin

J. Kitsembel, Electric Division

Public Service Commission of Wisconsin

State Liaison Officer

D. Koehl

-2-

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. The information request has been divided as follows:

The first group lists information necessary for a productive inspection preparation. This

information should be available to the Regional Office by no later than July 28, 2006, or sooner.

The second group of documents requested are those items necessary for the teams in-office

(August 21, 2006) preparation activities. During the in-office preparation week, the team may

identify additional information needed. This information should be available by August 28, 2006

(on-site week). The last group lists information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection.

The lead inspector for this inspection is Mr. Robert Daley. We understand that our regulatory

affairs contact for this inspection is Ms. Fritzi Flenji of your organization. In order to facilitate the

inspection, we request that a contact individual be assigned to each inspector to ensure

information requests, questions, and concerns are addressed in a timely manner. If there are

any questions about the inspection or the material requested in the Enclosure, please contact

the lead inspector at (630) 829-9749 or via e-mail at RCD@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-254; 50-265

License No. DPR-29; DPR-30

Enclosure:

Component Design Bases Inspection (CDBI) Document Request

See Attached Distribution

DOCUMENT NAME:E:\\Filenet\\ML061590112.wpd

G Publicly Available

G Non-Publicly Available

G Sensitive

G Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII

RIII

RIII

RIII

NAME

RDaley: ls

PLouden

AMStone

DATE

06/06/06

06/06/06

06/06/06

OFFICIAL RECORD COPY

D. Koehl

-3-

ADAMS Distribution:

DXC1

MXB

RidsNrrDirsIrib

GEG

KGO

KKB

CAA1

DRPIII

DRSIII

PLB1

JRK1

INFORMATION REQUEST FOR

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

1

Inspection Report: 05000266/2006006; 05000301/2006006 (DRS)

Information Gathering/

Inspection Dates:

August 14, 2006

Inspection Dates:

August 28, 2006, September 11, 2006, and September 25, 2006

Inspection Procedure:

IP 71111.21, Component Design Bases Inspection

Lead Inspector:

Robert Daley, Lead Inspector

(708) 829-9749

RCD@nrc.gov

I.

Information Requested Prior to the On-site Information Gathering/Inspection Week

(by July 28, 2006, or sooner)

The following information is requested by July 28, 2006, or sooner, to facilitate inspection

preparation. If you have any questions regarding this information, please call the team

leader as soon as possible. (Information in lists should contain enough information to

be easily understood by the inspection team.)

1.

Risk ranking of top 100 components from your site specific probabilistic safety

analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2.

Provide a list of the top 500 cut-sets from your PSA.

3.

Risk ranking of operator actions from your site specific PSA sorted by RAW.

Provide copies of your human reliability worksheets for these items.

4.

If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire.

5.

Any pre-existing evaluation or list of components and associated calculations with

low design margins, (i.e., pumps closest to the design limit for flow or pressure,

diesel generator close to design required output, heat exchangers close to rated

design heat removal etc.).

6.

List of high risk Maintenance Rule systems/components based on engineering or

expert panel judgement.

7.

A list of operating experience evaluations for the last 3 years.

8.

A list of emergency and/or off-normal operating procedure changes in the last

5 years.

INFORMATION REQUEST FOR

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

2

9.

A list of maintenance work orders involving repetitive failures in the last 5 years

for the top 100 components. For the purposes of this request, repetitive failure

would be 3 or more failures of the same component or sub-component in the

last 5 years.

10.

A list of Condition Reports related to any of the top 100 components in the last

3 years.

11.

A list of trend codes used for trending corrective action documents.

12.

A list of modifications sorted by component identified in item 1.

13.

List of and Information on any common cause failure of components experienced

in the last 5 years at your facility.

14.

A list of the design calculations which provide the design margin information for

components included in item 1.

15.

List of Root Cause and/or Apparent Cause Evaluations associated with

component failures or design issues initiated/completed in the last 5 years.

16.

List of MOVs in the MOV program, design margin and risk ranking.

17.

List of AOVs in the AOV program, design margin and risk ranking.

18.

SSCs in the maintenance rule (a)(1) category.

19.

Site Top Ten issues list.

20.

Provide list of PRA assumptions regarding operator actions and the associated

procedures.

21.

A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for the inspection.

22.

A copy of engineering/operations related audits completed in the last 2 years.

23.

Current management and engineering organizational chart.

INFORMATION REQUEST FOR

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

3

II.

Information Requested (for the approximate 30 selected components) to be

Available Either during the 1st On-site Inspection Week (August 14, 2006) or by

August 22, 2006. NOTE: Most of this information should be provided as

components are selected during the first on-site preparation week

(August 14, 2006)

1.

List of condition reports (corrective action documents) associated with each of the

selected components for the last 5 years.

2.

The corrective maintenance history associated with each of the selected

components for the last 2 years.

3.

Copies of calculations associated with each of the selected components, excluding

data files. Please review the calculations and also provide copies of referenced

material (such as drawings, engineering requests, vendor letters).

4.

Copies of operability evaluations associated with each of the selected components

and plans for restoring operability, if applicable.

5.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

6.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

7.

Trend data on the selected electrical/mechanical components performance for last

three years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., as applicable).

III.

Additional Information to be Provided on August 28, 2006 On-site (for final 15 - 18

selected components)

Requests for additional information based upon the results of preparation during the week

of August 21, 2006 will also be provided during that same week. The lead inspector will

normally provide these list(s).

IV.

Information Requested to be provided throughout the inspection

24.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

25.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection to

each team member).

INFORMATION REQUEST FOR

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

4

26.

Reference materials (make available during all on-site weeks). NOTE: At least

one volume should be in paper format (i.e., not electronic):

a.

Technical Specifications

i.

Technical Specifications;

ii.

Technical Specification Bases;

iii.

Technical Requirements Manual; and

iv.

CTS (Old Technical Specifications if ITS has been implemented).

b.

Updated Final Safety Analysis Report

c.

Quality Assurance Plan

4.

Copies of these documents do not need to be solely available to the team as long

as the inspectors have easy and unrestrained access to them.

a.

Original FSAR Volumes;

b.

Original SER and Supplements (for Original FSAR);

c.

FSAR Question and Answers;

d.

Vendor Manuals;

e.

General set of plant drawings;

f.

Procurement documents for components selected (verify retrievable);

g.

Plant procedures (normal, abnormal, emergency, surveillance, etc.); and

h.

IPE/PRA report.

If you have questions regarding the information requested, please contact the lead inspector.