ML061590062

From kanterella
Jump to navigation Jump to search
Notification of Turkey Point Component Design Bases Inspection - NRC Inspection Report Nos. 50-250/2006011, 50-251/2006011
ML061590062
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/08/2006
From: Ogle C
NRC/RGN-II/DRS/EB1
To: Stall J
Florida Power & Light Co
References
IR-06-011
Download: ML061590062 (5)


See also: IR 05000250/2006011

Text

June 8, 2006

Florida Power and Light Company

ATTN: Mr. J. A. Stall, Senior Vice President

Nuclear and Chief Nuclear Officer

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

NOTIFICATION OF TURKEY POINT NUCLEAR PLANT COMPONENT DESIGN

BASES INSPECTION - NRC INSPECTION REPORT NOS. 50-250/2006011,

50-251/2006011

Dear Mr. Stall:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Turkey Point facility

during the weeks of August 28 - September 1, 2006, September 11 - 15, 2006, and September

25 - 29, 2006. The inspection team will be led by Mr. Caswell Smith, a Senior Reactor Inspector

from the NRCs Region II Office. This inspection will be conducted in accordance with the

baseline Inspection Procedure 71111.21, Component Design Bases Inspection, issued

December 2, 2005.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and support proper system operation. The inspection will also include a review of

selected operator actions, operating experience, and modifications.

During a telephone conversation on June 5, 2006, Mr. C. Smith of my staff, and

Ms. Olga Hanek of your staff, confirmed arrangements for an information gathering site visit

and the three - week onsite inspection. The schedule is as follows:

Information gathering visit: Week of August 14, 2006,

Onsite inspection: August 28 - September 1, 2006, September 11 - 15, 2006 and

September 25 - 29, 2006.

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. W. Rogers, a Region II Senior Reactor

Analyst, may accompany Mr. Smith and the inspection team during the information gathering

visit to review probabilistic risk assessment data and identify risk significant components which

will be examined during the inspection.

The enclosure lists documents that will be needed prior to the information gathering visit.

Please contact Mr. Smith prior to preparing copies of the materials listed in the enclosure.

FP&L

2

The inspectors will try to minimize your administrative burden by specifically identifying only

those documents required for the inspection preparation.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space; specific documents requested to be made available

to the team in their office space; arrangements for reactor site access; and the availability of

knowledgeable plant engineering and licensing organization personnel to serve as points of

contact during the inspection.

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact me at (404) 562-4605, or Mr. Smith at

(404) 562-4630.

Sincerely,

/RA/

Charles Ogle, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-250, 50-251

License Nos.: DPR-31, DPR-41

Enclosure:

Information Request for Turkey Point Nuclear Plant Component Design Bases

Inspection

FP&L

3

cc w/encl:

T. O. Jones

Site Vice President

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Walter Parker

Licensing Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Michael O. Pearce

Plant General Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

William E. Webster

Vice President, Nuclear Operations

Florida Power & Light Company

Electronic Mail Distribution

Mark Warner, Vice President

Nuclear Operations Support

Florida Power & Light Company

Electronic Mail Distribution

Rajiv S. Kundalkar

Vice President - Nuclear Engineering

Florida Power & Light Company

Electronic Mail Distribution

M. S. Ross, Managing Attorney

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi, Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee, FL 32304

William A. Passetti

Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

County Manager

Metropolitan Dade County

Electronic Mail Distribution

Craig Fugate, Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

Curtis Ivy

City Manager of Homestead

Electronic Mail Distribution

_________________________

OFFICE

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

NAME

C.Smith

J. Munday

DATE

6/7/2006

6/7/2006

11/ /2006

11/ /2006

11/ /2006

11/ /2006

11/ /2006

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

Enclosure

INFORMATION REQUESTS FOR TURKEY POINT NUCLEAR PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in pdf files, Excel, or other searchable format on

CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by some one

who has knowledge of pressurized water technology.

1.

Risk ranking of components from your site specific probabilistic safety analysis (PSA)

sorted by Risk Achievement Worth (RAW) and sorted separately by Birnbaum

Importance. If possible, please provide a correlation between actual plant components

in plain language and RAW values.

2.

Provide a list of the top 500 cutsets from your PSA.

3.

Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

copies of your human reliability worksheets for these items.

4.

If you have an External Event or Fire PSA Model, provide the information requested in

items 1 and 2 for external events and fire.

5.

Any pre-existing evaluation or lists of components and calculations with low design

margin ( i.e., pumps closest to the design limit for flow or pressure, diesel generator

close to design required output, heat exchangers close to rated design heat removal,

MOV risk margin rankings, etc).

6.

A list of the last two years of operating experience evaluations, modifications, and

corrective actions sorted by component or system.

7.

Information of any common cause failure of components experienced in the last 5 years

at your facility.

8.

Contact person to discuss PRA information prior to information gathering trip: phone

number and email address.

9.

List of equipment on Station Equipment Problem List, list of equipment in GL 91-18

status, list of equipment in MR(a)(1) status, and a list of equipment for which an

operability evaluation was required in past 2 years.