FENOC 5501 North State Route 2 FirstEnergyNuclearOperating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 Docket Number 50-346 10 CFR 50.90 License Number NPF-3 Serial Number 3262 May 30, 2006 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station Partial Withdrawal of License Amendment Application to Allow Performance of EDG Load Rejection Testing and 60-Minute Loaded Run to be Performed On-Line (License Amendment Request (LAR) 03-0015; TAC No. MC8004)

Ladies and Gentlemen:

By letter dated July 27, 2005 (Serial Number 3158), the FirstEnergy Nuclear Operating Company (FENOC) submitted License Amendment Request (LAR) 03-0015, an application for amendment of the Operating License, Appendix A, Technical Specifications (TS) for the Davis-Besse Nuclear Power Station (DBNPS). The proposed amendment would revise TS 3/4.8.1.1, "A. C. Sources - Operating," to adopt a more recent standard for diesel fuel oil testing and remove the restriction that certain surveillance requirements be performed during shutdown.

FENOC requests withdrawal of the portion of LAR 03-0015 that affects TS Surveillance Requirement (SR) 4.8.1.1.2.d. This portion of the change would have allowed Surveillance Requirements (SR) 4.8.1.1.2.d.1 and 4.8.1.1.2.d.3 to be performed on-line.

FENOC requests continued processing of the remainder of LAR 03-0015.

The portions of the previously submitted evaluation for LAR 03-0015 related to SR 4.8.1.1.2.d are not applicable to the remaining change. The portions of the previously submitted evaluation related to fuel oil testing are unaffected, including the technical analysis, no significant hazards consideration, and environmental consideration.

Attachment 1, Commitment List, identifies that there are no commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager - FENOC Fleet Licensing, at (330) 315-7243.

Docket Number 50-346 License Number NPF-3 Serial Number 3262 Page 2 The statements contained in this submittal, including its associated enclosures are true and correct to the best of my knowledge and belief. I am authorized by the FirstEnergy Nuclear Operating Company to make this submittal. I declare under penalty of perjury that the foregoing is true and correct.

Executed on: (3a By:

Mark B. Bezilla, Vice Presi t-Nuclear MSH Attachment cc: Regional Administrator, NRC Region III Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)

DB-1 NRC/NRR Project Manager DB-I NRC Senior Resident Inspector Utility Radiological Safety Board

Docket Number 50-346 License Number NPF-3 Serial Number 3262 Page I of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station, Unit Number 1, (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments. Please notify Gregory A. Dunn, Manager -

Fleet Licensing (330-315-7243) of any questions regarding this document or associated regulatory commitments.