ML061500260
Jump to navigation
Jump to search
| ML061500260 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/30/2006 |
| From: | Plant Licensing Branch III-2 |
| To: | |
| Holland D, NRR/DLPM, 415-1436 | |
| Shared Package | |
| ML060830026 | List: |
| References | |
| TAC MC8539 | |
| Download: ML061500260 (1) | |
Text
REACTIVITY CONTROL SYSTEMS MINIMUM TEMPERATURE FOR CRITICALITY LIMITING CONDITION FOR OPERATION 3.1.1.5 The Reactor Coolant System lowest operating loop temperature (Tavg) shall be
> 5400F.
APPLICABILITY:
MODES 1 and 2#*.
ACTION:
With a Reactor Coolant System operating loop temperature (Tavg) < 5400F, restore Tavg to within its limit within 15 minutes or be in HOT STANDBY within the next 15 minutes.
I I
SURVEILLANCE REQUIREMENTS 4.1.1.5 The Reactor Coolant System temperature (Tavg) shall be determined to be: 2 5400F at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
I I
- With Kef Ž 1.0.
- See Special Test Exception 3.10.5.
ARKANSAS - UNIT 2 3/4 1-6 Next page is 3/4 1-17 Amendment No. 229, 264