ML061320479
| ML061320479 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 05/11/2006 |
| From: | Brian Holian Division Reactor Projects I |
| To: | Levis W Public Service Enterprise Group |
| Gray M, RI/DRP/Br3 610-337-5209 | |
| References | |
| Download: ML061320479 (3) | |
Text
May 11, 2006 Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
PSEG LETTER FORWARDING THE RESULTS OF A PEER ASSESSMENT OF THE SAFETY CONSCIOUS WORK ENVIRONMENT AT SALEM AND HOPE CREEK GENERATING STATIONS
Dear Mr. Levis:
This letter acknowledges receipt of your letter dated May 4, 2006, which provided a copy of an independent peer assessment that examined the safety conscious work environment (SCWE) at the Salem and Hope Creek Generating Stations. In your letter, you described the results of your actions to improve the work environment at the stations. Furthermore, you indicated that both you and the peer assessment team concluded that substantial and sustainable progress has been made.
The NRC plans to review the effectiveness of your actions and the results during a team inspection commencing on June 12, 2006. The results of this SCWE inspection will be considered during our mid-cycle assessment in August 2006, to evaluate the substantive cross-cutting issue in SCWE and the status of the Reactor Oversight Process Deviation Memorandum.
Additionally, on May 17, 2006, the NRC will conduct a public meeting with you and your management team to provide the NRCs assessment of the safety performance at Salem and Hope Creek for calendar year 2005 and to discuss your actions to improve the SCWE.
Mr. Mel Gray of my staff has been finalizing plans for this upcoming meeting.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian E. Holian, Director Division of Reactor Projects Docket No:
50-272, 50-311, 50-354 License No:
Mr. W. Levis 2
cc:
T. Joyce, Salem Site Vice President G. Barnes, Hope Creek Site Vice President D. Winchester, Vice President Nuclear Assessments W. F. Sperry, Director Business Support D. Benyak, Director - Regulatory Assurance C. J. Fricker, Salem Plant Manager M. Massaro, Hope Creek Plant Manager J. J. Keenan, Esquire M. Wetterhahn, Esquire F. Pompper, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, Radiation Protection and Release Prevention, State of New Jersey K. Tosch, Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection H. Otto, Ph.D., DNREC Division of Water Resources, State of Delaware Consumer Advocate, Office of Consumer Advocate N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance
Mr. W. Levis 3
Distribution:
S. Collins, RA M. Dapas, DRA R. Blough, DRS M. Gamberoni, DRS B. Holian, DRP D. Lew, DRP M. Gray, DRP B. Welling, DRP G. Malone, DRP, Senior Resident Inspector D. Orr, DRP, Senior Resident Inspector K. Venuto, DRP, Resident OA Region I Docket Room (with concurrences)
DOCUMENT NAME: E:\\Filenet\\ML061320479.wpd SUNSI Review Complete: MKG (Reviewers Initials)
After declaring this document An Official Agency Record it will/will not be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME BWelling/BDW MGray/MKG BHolian/BEH DATE 05/10/06 05/10/06 05/11/06 OFFICIAL RECORD COPY